/
Date:  4 November 2014 Reliability, Availability, and Maintainability including Date:  4 November 2014 Reliability, Availability, and Maintainability including

Date: 4 November 2014 Reliability, Availability, and Maintainability including - PowerPoint Presentation

jane-oiler
jane-oiler . @jane-oiler
Follow
349 views
Uploaded On 2018-10-27

Date: 4 November 2014 Reliability, Availability, and Maintainability including - PPT Presentation

Testability and Software Reliability Policy Updates Presented by Robert S Smith and Judy M PotterShields General Engineers US Army Aviation and Missile Research Development and Engineering Center ID: 699079

report amp reliability ram amp report ram reliability maintainability summary dids program analysis sustainment verification sep feasibility sow policy

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Date: 4 November 2014 Reliability, Avai..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Date: 4 November 2014

Reliability, Availability, and Maintainability including

Testability and Software Reliability

Policy Updates

Presented by:Robert S Smith and Judy M. Potter-ShieldsGeneral EngineersU.S. Army Aviation and Missile Research, Development, and Engineering Center

Presented to:RAM VII Training SummitThe WestinHuntsville, Alabama

IAW DoD Directive 5230.24,

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.Slide2

Purpose

Provide an update to the RAM community of DoD R&M Engineering ActivitiesContentsPolicy Guidance

StandardizationPurpose/ContentsSlide3

Reliability, Availability, Maintainability and Cost (RAM-C) Rationale ReportSlide4

Executive Summary

RAM-C Report and Timing Sustainment Rationale Description of Sustainment Parameters Operational Mode Summary/Mission Profile

Product Support Strategy Verification Assessment

Feasibility Assessment Summary Introduction – Purpose, Changes, and Preparers PurposeChanges RAM-C Preparers Sustainment KPP/KSAs/APAs Overview and Program Data Sustainment Metrics Operational Information Product Support Strategy

RAM-C FormatSlide5

Assessment of Sustainment Parameters

Definitions Sustainment KPP/KSA/APA Verification Operational Availability (AO) Verification

Materiel Availability (AM) Verification Mission Reliability Verification

O&S Cost Verification Verification Summary Sustainment KPP/KSA/APA Feasibility Sustainment Metrics Feasibility O&S Cost Feasibility AO and AM Feasibility Feasibility Summary Tradeoff Analysis Summary RAM-C FormatSlide6

Army Regulation (AR) 702-3Slide7

Important AR 702-3 Reminders:A RAM-C report is required by the Army for any program with RAM requirements.

The DOTE FDSC policy* has been implemented in Army policy.

* 10-05-12 Independent Operational Test and Evaluation (OT&E) Suitability Assessments AR 702-3Slide8

Standardization &

Data Item Descriptions (DIDs) Slide9

What is DID situation as it relates to R&M?What is available for R&M DIDs including testability and SW Rel?

Do gaps exist in those DIDs for R&M policy?What solutions are the best to fill those gaps?Standardization Update

Data Item Descriptions (DIDs)Slide10

Failure Modes, Effects, and Criticality Analysis Report

DI-ILSS-81495, Failure Mode Effects, and Criticality Analysis Report, 30 Oct 1995 and Validation 10 Sep 2014Failure Summary & Analysis ReportDI-RELI-80255, Failure Summary and Analysis Report, 17 Oct 1986

Reliability & Maintainability (R&M) Allocation Report DI-RELI-81496, Reliability Block Diagrams and Maintenance Models Report, 30 Oct 1995 validated on 10 Sep 2014

R&M Block Diagrams and Mathematical Models ReportDI-RELI-81496, Reliability Block Diagrams and Maintenance Models Report, 30 Oct 1995 validated on 10 Sep 2014R&M Predictions ReportDI-RELI-81497, Reliability Prediction and Documentation of Supporting Data, 30 Oct 1995 validated on 10 Sep 2014R&M Program PlanDI-SESS-81613, Reliability and Maintainability (R&M) Program Plan, 1 Aug 2001DI-MNTY-81600, Maintainability Program Plan, 08 Feb 2001DI-ATTS-81270, Testability Program Plan, 12 Jun 1992

Initial DIDs ReviewedSlide11

Determined that new/updates to R&M DIDs were needed for

Failure Modes, Effects, and Criticality Analysis ReportFailure Summary & Analysis ReportReliability and Maintainability (R&M) Allocation Report

Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models ReportReliability and Maintainability Predictions ReportReliability and Maintainability (R&M) Program Plan

Standardization Update - SolutionsData Item Descriptions (DIDs)Slide12

Failure Modes, Effects, and Criticality Analysis Report

New DID developedFailure Summary & Analysis ReportNew DID Developed R&M Allocation Report

DI-RELI-81968, Reliability and Maintainability (R&M) Allocation Report, 10 Jul 2014 – NEW released

R&M Block Diagrams and Mathematical Models Report New DID developedReliability and Maintainability Predictions Report New DID developedR&M Program PlanDI-SESS-81613A, Reliability and Maintainability (R&M) Program Plan, 15 Jul 2014 – Updated

DID Current StatusSlide13

Overarching DID policy updates:

Enclosure 12 of DoDM 4120.24, Defense Standardization Program (DSP) Procedures, dated 24 Sep 2014 covers DIDs MIL-STD-963C, Data Item Descriptions (DIDs), dated 24 Sep 2014Overarching DID PolicySlide14

Division Statement

of Work (SOW) ToolSlide15

Statement of Work (SOW) Tool

PROTOCOL SOW Tool located at “RAM Task Advisor” tab

https://extranet.amrdec.army.mil/Protocol/Default.aspx

ED/RAM is in the process of updating the RAM SOW toolPlan tasks:Update SOW task wordingUpdate DIDs listingUpdate Life Cycle Acquisition PhasesUpdate CriticalityUpdate Optional System CharacteristicsSlide16

Summary

Provide a quick status overview to the RAM community

RAM-C Rationale Report

AR 702-3Standardization – DIDsRAM SOW ToolSlide17

Questions?

?