Start Here  EXEMPT No  Stormwater Start Here  EXEMPT No  Stormwater

Start Here EXEMPT No Stormwater - PowerPoint Presentation

jasmine
jasmine . @jasmine
Follow
342 views
Uploaded On 2022-06-15

Start Here EXEMPT No Stormwater - PPT Presentation

R equirements Figure A1 Initial Screening for All Development Projects SFR gt 2500 ft 2 See Figure A4 Is the project Exempt or does not discharge to MS4 Project is lt 2500 ID: 918313

impervious ft2 replaced percentile ft2 impervious percentile replaced event performance project 500 infiltration 000 projects requirement figure requirements retain

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Start Here EXEMPT No Stormwater" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Start Here

EXEMPT

No Stormwater Requirements

Figure A1. Initial Screening for All Development Projects

SFR

> 2,500 ft2 See Figure A4

Is the project Exempt or does not discharge to MS4?

Project is < 2,500 ft2 of new and replaced impervious surface

Project is a detached single-family residence?

All Others

See Figure

A2

YES NO

YES NO

YES NO

Flow Chart to Determine Performance Requirements

Slide2

Figure

A2.

Requirements for Small to Moderate Development Projects

Projects ≥ 2,500 ft

2

Project is > 2,500 ft2 of new and replaced impervious surface but < 5,000 ft2 of

net impervious area

Project is > 5,000 ft2 net impervious area but < 15,000 ft2 of new and replaced impervious

surfaceProject is >

15,000 ft2

of new and replaced impervious surface

Performance Requirement #1 (Site Design)Performance Requirements #

1 (Site Design) and #2 (WQ Treatment)

See Figure A3

Slide3

P

roject creates

> 22,500 ft2 of new and replaced impervious surface

Figure A3. Requirements for Large Development Projects

Yes

No additional Stormwater RequirementsDoes the project fall under theSpecial Circumstances designation?

See Special Circumstances(Performance Requirement #5) No

NoWatershed Management Zone1 2 3 4 5 6

7 8 9 10Apply

Performance Requirement #4 (Peak Management

)Projects ≥ 15,000 ft

2 New and Replaced Impervious Area

Yes

Retain 95

th Percentile event via infiltrationRetain 95th Percentile event via storage, harvesting

, infiltration, and/or evapotranspirationN/A

Retain 95th Percentile event via infiltration where overlying

groundwater basinRetain 85th Percentile

event via infiltrationRetain 85th Percentile

event via storage, harvesting,

infiltration,

and/or evapotranspiration

Retain

95

th

Percentile event via infiltration where

overlying groundwater basin

Retain

85

th

Percentile

event via

infiltration

Retain 85

th

Percentile

event via storage, harvesting,

infiltration,

and/or evapotranspiration

Retain

95

th

Percentile event via infiltration where overlying

groundwater basin

Determine WMZ and apply Performance Requirement #3 (Runoff Retention)

Project in WMZ 1, 2, 3, 6, or

9

No

Yes

Slide4

Performance Requirement #1

Project is

>

2,500 ft2 new and replaced impervious

surface,

but< 15,000 ft2 net impervious areaProject is

> 15,000 ft2 net impervious area, but

< 22,500 ft2 new and replaced impervious surfacePerformance Requirement #s

1, 2, and 3Project is>

22,500 ft2 new

and replaced impervious surface

Performance Requirement #s

1, 2, 3, and 4

Figure

A4.

Requirements for Single-Family Residential

Projects

Detached

Single-Family

Residential

Projects