Bass Lake Protection Activity Bass Lake Protection Activity

Bass Lake Protection Activity - PowerPoint Presentation

khadtale
khadtale . @khadtale
Follow
343 views
Uploaded On 2020-10-01

Bass Lake Protection Activity - PPT Presentation

Annual Meeting June 3 2017 Lake Management Planning Implementation Project LAKE PROTECTION GRANT AWARDED 7525 77520002584000 GRANT TIMEFRAME 5112017 12312019 ID: 812954

000 services site lake services 000 lake site 240 consulting june management project demonstration travel training amp 480 volunteer

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Bass Lake Protection Activity" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Bass Lake Protection Activity

Annual Meeting, June 3, 2017

Slide2

Lake Management Planning

Implementation

Project

LAKE PROTECTION GRANT AWARDED 75%/25% ($77,520.00/$25,840.00)GRANT TIMEFRAME 5/11/2017 – 12/31/2019PROJECT IS AIMED AT:Reducing Phosphorous LoadsProtecting and Improving diverse aquatic life through Shoreland Restoration projects and Best Management Practices(BMPs) installation

June 03, 2017

Footer text here

2

Slide3

Lake Management Planning

Implementation

Project

June 03, 2017Footer text here3PROJECT ACTIVITIES:Conduct Site Analysis and Design for storm water runoff, fisheries, and

shoreland restoration practices

Provide Technical Assistance to develop designs and how-to information(DIY and/or landscapers)

Establish and Install BMPs at Demonstration Sites (12-15 in 2017)

Promote Installation of

Shoreland

BMPs using Demonstration Sites

Install 40 additional Fish Cribs (over 3 years)

Slide4

Lake Management Planning

Implementation

Project

June 03, 2017Footer text here4PROJECT DELIVERABLES:All Data Collected

List and Map of Demonstration and Fish Crib Sites

Before and After PhotosIndividual Site Analysis Reports

All Outreach and Event Materials (Including this one

)

Agenda and Minutes from Advisory Committee Meetings

Slide5

Lake Management Planning

Implementation

Project

June 03, 2017Footer text here5SPECIAL CONDITIONS:WDNR Lake Management Coordinator will be provided with all data and maps

The Scope on previous pages summarizes the detail

Date, records, reports, including GIS –based maps, and digital images, must be submitted in a specified format to the Lakes Coordinator

Slide6

June 03, 2017

Footer text here

6

Lake Management Planning Implementation Project

Project Budget

Cost for Each Category

Project Costs

Activity

Time(Hr.)

Cash Cost

Time(Hr.)

Donated Value

Subtotal

Consulting Services

Demonstration Site Designs

3,000.00

$3,000.00

Travel & Training Volunteer Services

Demonstration Site Support

20

240.00

$240.00

Purchased Services

Demonstration Site Installation

27,600.00

200

2400.00

$30,000.00

Consulting Services

Tracking and Reporting

1,000.00

$1,000.00

Travel & Training Volunteer Services

Tracking and Reporting

20

240.00

$240.00

Purchased Services

Demo Site Promotion

500.00

$500.00

Travel & Training Volunteer Services

Demo Site Promotion

40

480.00

$480.00

Travel & Training Volunteer Services

Future Site Solicit Participation

40

480.00

$480.00

Consulting Services

Site Analysis

3,000.00

$3,000.00

Consulting Services

Future Sute Designs

3,000.00

$3,000.00

Purchased Services

Future Site Installation

27,600.00

200

2400.00

$30,000.00

Purchased Services

Resident Engagement Events

1,500.00

$1,500.00

Travel & Training Volunteer Services

Resident Engagement Events

80

960.00

$960.00

Consulting Services

Riparian Phosphorous Estimator Tools

2,000.00

$2,000.00

Consulting Services

Lake Pump Feasibility Study

20

240.00

$240.00

Supplies

DO Meter

2,000.00

$2,000.00

Purchased Services

Fish Habitat Installation

9,000.00

20

240.00

$9,240.00

Consulting Services

Coordination, Demo Committee and Board Support

15,000.00

$15,000.00

Travel & Training Volunteer Services

Fish Habitat - St. Croix Alliance

40

480.00

$480.00

Subtotals

95,200.00

680

8,160.00

$103,360.00

State Share 75%

$77,520.00

Slide7

Bass Lake Protection Activity

Annual Meeting, June 3, 2017