Ministry of Electric Power Electricity Supply Enterprise Chin State Office Priorities and Detailed Description of Electrification Plan For Chin State Dated 21Oct2015 Electrification Plan after discussion with local ID: 787552

cost district miles line district cost line miles office pmo mil falam mindat 800 nos distribution village electrification kyats

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "The Republic of the Union of Myanmar" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

The Republic of the Union of MyanmarMinistry of Electric PowerElectricity Supply EnterpriseChin State Office

Priorities and Detailed Description of Electrification PlanFor Chin State

Dated -21.Oct.2015

Slide2

Electrification Plan after discussion with local goverment We have submitted to the local government for implementation the the NEP with World Bank Loan that we have planned for priority to the villages lists within 2 miles from existing 11 kV lines. Then we have got the message to cooperate with township management committee. Therefore, we have to coordinate with township management committee and village lighting committee for electrification the villages within 2 miles from existing 11 kV lines.2

Slide3

To be Constructed 11 kV Distribution Line 8 miles 400 V Distribution Line 2.5 miles 11/0.4 kV Distribution Transformer 4 NosElectricfication Plan for Village of Chin State

(Within 2 miles from Exiting 11 kV Distribution Line)Falam DistrictNo. of Village - 1 NosHousehold - 72Estimated Cost - 70.58(Mil kyats)

Mindat DistrictNo. of Village - 3 NosHousehold - 109Estimated Cost - 207.09(Mil kyats) Chin State No. of Village - 4 Nos

Household - 181Estimated Cost - 277.67

(Mil kyats

)

(To

Kalay

)

(

Cikhar

)

(

Tonzang

)

(

Teedim

)

(

Falam

)

(

Hakha

)

(

Rih

Khawdar

)

(Thanthlang)

(Rezuar)

(Matupi)

(Mindat)

(Paletwa)

(Sami)

(Kanpetlet)

(To Saw )

(To Kyauhtoo)

(To Gangaw)

(To Natchaung)

3

Slide4

Detailed Electrification Plan for Chin State(Within 2 miles from Existing 11 kV Distribution Line)

    

    

 

 

 

 

 

 

 

No

Districk

No of House

House

hold

Popu

-

lation

To be constructed

Estimated

cost

(Mil

Kyates

)

Task

by regional

Cost for 11 kV Line

11/0.4 kV Transformer

400V

Lines

(Miles)

Estimated Cost

(Mil

Kyats)

mile

Material Cost

Transport

Cost

Constr-uction

Cost

Total

kVANoMaterialCostTrans-portCostConstru-ctionCostTotal1. Falam6472311247.827.662.658.08100111.350.800.3512.5070.58144.892Mindat1091094906143.4622.987.8174.24150329.42.41.0532.85207.091.567.335Total1731818018191.2830.6410.4232.32250440.753.21.445.35277.672.5112.225

4

Slide5

Detailed Electrification Plan for Falam District(Within 2 miles from Existing 11 kV Distribution Line)

  

     

 

 

 

 

 

 

 

 

 

No

Township

Name of Village

To be Electrified

No of House

House

hold

Popu

-

lation

To be constructed

Estimated

cost

(Mil

Kyates

)

Task

by regional

Cost for 11 kV Line

11/0.4 kV Transformer

400V

Lines

(Miles)

Estimated Cost

(Mil

Kyats)

mile

Material

Cost

Transp-Ort CostConstr-uctionCostTotalkVANoMate-rialsCostTrans-portCostConstr-uctionCostTotal1. FalamLa thi6472311247.827.662.658.08100111.350.800.3512.5070.58144.89Total6472311247.827.662.658.08100111.350.800.3512.5070.58144.895

Slide6

LegendLocation Map of Electrification Plan for Falam District(Within 2 miles from Existing 11 kV Distribution Line)

La thi Village11/0.4 kV(100

kVA)Parte VillageNgasit vaa mini Hydropower (500kVA)2 miles

Legend

Ngasit

vaa

mini Hydropower (

500kVA)

11 kV Line

11 kV Line (2 Mile)

11/0.4 kV TR (100 kVA)

6

Slide7

Detailed Electrification Plan for Mindat District(Within 2 miles from Existing 11 kV Distribution Line)

   

    

 

 

 

 

 

 

 

 

 

No

Town

ship

Name of Village

To be Electrified

No of House

House

hold

Popu

lation

To be constructed

Estimated

cost

(Mil

Kyates

)

Task

by regional

Cost for 11 kV Line

11/0.4 kV Transformer

400V

Lines

(Miles)

Estimated Cost

(Mil

Kyats)

mile

Mater-

ials

CostTrans-portCostConstruc-tion CostTotalkVANoMaterialsCostTransportCostConstru-ctionCostTotal1. MindatKyawl Taw2424122247.827.662.658.085019.800.800.3510.9569.030.522.445Baw(3)2020125247.827.662.658.085019.800.800.3510.9569.030.522.445Pye6565243247.827.662.658.085019.800.800.3510.9569.030.5

22.445

Total

109

109

490

6

143.46

22.98

7.8

174.24

150

3

29.4

2.4

1.05

32.85

207.09

1.5

67.335

7

Slide8

Pye

Village11/0.4 kV( 50 kVA)Kyaw Taw Village11/0.4 kV( 50kVA)Baw (3) Village11/0.4 kV( 50

kVA)2 miles2 miles2 milesLocation Map of Electrification Plan for Mindat District

(Within 2 miles from Existing 11 kV Distribution Line)

Legend

11 kV Line

11 kV Line 6 Miles

11/0.4 kV TR ; 150

kVA

8

Slide9

The Statement of Fiscal Yearly Budget and Electrified Connection for Chin StateNoFiscal YearState/RegionCapital Budget for ESE (mil Kyats)State/Region

Capital Budget for DRD (mil Kyats)Electrified ConnectionON Grid

Off GridTotal CostFor 11 kV Line & 11/0.4 TRTotal

Cost

for 400 V LineTotal

Off Grid

Village

(

Nos

)

Consumer

(

Nos

)

Village

(

Nos

)

Consumer

(

Nos

)

1

2014-2015 Estimate (RE+BE)

147.51

62.05

209.561149.96

4

344686225

2

2015-2016 Estimate (RE+BE)275.59

98.65374.25430.40

5152

79

2139

32016-2017 Budget

Estimate (RE+BE)1970.53

509.772480.3

2977.2017

1334516

14886

Grand Total1699.03665.192364.234557.56261830663232509

Slide10

Sr NoDescriptionQuantities

Transported Site1

11/0.4 kV ,100 kVA Transformer1 NoFalam District , PMO Office

2

10 meter Iron Pole

95

Nos

Falam

District , PMO Office

3

ACSR

95/15 mm-

sq

3863

kgs

Falam

District , PMO Office

4

11 kV Pin Insulator with

Sindle

285

Nos

Falam

District , PMO Office

5

11 kV Disc Insulator with

fiting

Clamp

60

Sets

Falam

District , PMO Office

6

Surge

Arrestor , Disconnection Switch , Fuse

1 Sets

Falam

District , PMO Office

7

Other Material

1 Lot

Falam District , PMO Office Main Materials List Transported to Falam District Office10

Slide11

Sr NoDescriptionQuantities

Transported Site1

11/0.4 kV ,50 kVA Transformer3 NosMindat District , PMO Office

2

10 meter Iron Pole

285

Nos

Mindat

District , PMO Office

3

ACSR

95/15 mm-

sq

11590

kgs

Mindat

District , PMO Office

4

11 kV Pin Insulator with

Sindle

855

Nos

Mindat

District , PMO Office

5

11 kV Disc Insulator with

fiting

Clamp

174 Sets

Mindat

District , PMO Office

6

Surge

Arrestor , Disconnection Switch , Fuse

3

Sets

Mindat

District , PMO Office

7

Other Material

1 Lot

Mindat District , PMO Office Main Materials List Transported to Mindat District Office11