Paul Dervan CERN PS T7 T7 extracted proton beam profile 1 x 1 cm 2 Flux about 13E13 phourcm2 50cm long table thermally insulated box scanned horizontally through 10cm Space for maximum of three 10x10 cm ID: 224800

cm2 beam days box beam cm2 box days birmingham irradiation cern sensors cold 2e13 line pixel insulated hpixel dosimetry cyclotron 1238 year

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Irradiation Program" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Irradiation Program

Paul DervanSlide2

CERN PS T7

T7 extracted proton beam, profile ~ 1 x 1 cm

2

. Flux about 1-3E13 p/hour/cm250cm long table + thermally insulated box, scanned horizontally through 10cm.Space for maximum of three 10x10 cm2 sensors + some passive materials.

PS-T7 area, irradiation facility maintained by M. Glaser

Passives, e.g.

glue, grease.

RPC beam monitor + Activation Foils (at Entry and Exit)

Thermally insulated box

Scan Table

3 Sensors (biassed)

Paul Dervan, AUW 2011, OxfordSlide3

CERN PS Timetable

Period

Start

StopCommentUseP301/08/1210/08/12 9 days ~ 2e13 p/cm2/hNTC + Pixel*P410/08/1218/09/1238 days ~2e13 p/cm2/hPixel*P518/09/1227/10/1238 days ~2e13 p/cm2/hPixel*

P6B27/10/1209/11/1215 days ~2e13p/cm2/hIf we can bring out the NTC’s there is a slot free in the box for P5 and P6* Pixel may take two slotsNo beam at the PS for possibly 2 years after this yearSlide4

Birmingham Cyclotron

26 MeV proton beam

1cm

2 beam spot Ni foil dosimetry, pin diode dosimetry High dose irradiation (1016 neq cm-2) takes 2 days Cold box similar to CERN Can also irradiate without the cold box (bigger objects)

Services

Faraday Cup (Charge)

Initial installation, alignment and testing

in old beam lineSlide5

Birmingham Status

Beam line has moved

First irradiation was last week (4 mini 1 by 1 cm Si sensors)

Irradiated to 2.5e15 p/cm2 (in 22 minutes) Will be faster when we install the sheilding wall (ran at 0.25μA, could go to 1μA) Didn’t use the cold box There is no schedule for Birmingham (just request)Slide6

Summary

CERN PS shuts down the end of this year (2 months of beam left)

Birmingham Cyclotron is coming on line