/
March 29, 2018 Charleston, SC March 29, 2018 Charleston, SC

March 29, 2018 Charleston, SC - PowerPoint Presentation

liane-varnes
liane-varnes . @liane-varnes
Follow
384 views
Uploaded On 2018-09-25

March 29, 2018 Charleston, SC - PPT Presentation

NSRP Joint Panel Meeting Electrical Technologies Panel Surface Prep amp Coatings Panel Agenda Thursday March 29 2018 General Session Time Presentation Speaker 800 Convene Meeting Begin VTC Joint Session ID: 680075

electrical panel meeting amp panel electrical amp meeting 2018 nsrp joint project navsea update system technologies panels march 2017

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "March 29, 2018 Charleston, SC" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

March 29, 2018

Charleston, SC

NSRP Joint Panel Meeting

Electrical Technologies

Panel

Surface Prep

& Coatings

PanelSlide2

AgendaThursday, March 29, 2018

(General Session)

TimePresentation

Speaker

8:00

Convene Meeting – Begin VTC – Joint Session

8:00

Introductions and Welcome to Charleston

Steve Duca, NSRP ATI Executive Director

8:10

SP&C Panel Chair’s Report

Arcino Quiero, Jr., Panel Chair

8:40

Electrical Panel Chair’s Report

Jason Farmer, Panel Chair

9:10

NSRP Program Update

Frances Pearce / Nick Laney, ATI

9:30

NAVSEA O5P2 SP&C Technical Update

Mark Ingle, TWH, NAVSEA 05P2

10:15

Break

10:30

Fiber Optic Systems

John Mazurowski,

PSU Electro-Optics Center

11:00

2016 Project Update – Implementation of Robust Paperless Paint

(PTR –Robert Cloutier)

Ross Boyd, TruQC

Megan Brinker, TruQC

11:30

NAVSEA O5Z3 Technical Update

Chris Nemarich, NAVSEA 05Z33

12:00

SP&C Panel Steering Committee Working Lunch (Provided)

Electrical and SP&C Panels Lunch (On Your Own)

After lunch separate into individual Panels (Electrical and SP&C) for the remainder of the meeting Slide3

Agenda

Thursday Afternoon, March 29, 2018 (Electrical Breakout)

1:00

Convene Meeting – Begin VTC

Panel Project Updates:

1:00

2017 Project Update – Distributed Temperature Sensing for Inspection of Electrical Panels on Navy Ships

Jeff Callen, PSU EOC

1:30

2017 Project Update – Power Panel and Breaker Commonality

Ricky Deloge, BIW

2:30

2018 Project Kick-Off – Evaluation of Efficacy of Self-Sealing Cable Transit Devices for Aluminum Bulkheads and Decks in Non-Watertight Boundaries

Terry Mannion, STI Marine

3:00

Break

3:15

2018 Project Kick-Off – Low Voltage Shipboard Lighting Feasibility Study

 

Jason Framer, Ingalls Shipbuilding

3:45

Advancements in LED Technology

Lylyn Stockstill, LP Solutions

Deirdre Burley, GLB & Associates

 

4:15

For the Good of the Panel

All

4:30

Wrap Up and Adjournment

Jason Farmer, Panel ChairSlide4

March 29, 2018

Charleston, SC

Electrical Technologies Panel

Chair’s Report

NSRP Joint Panel MeetingSlide5

Mission Statement

5

Reduce the cost associated with the installation and operation of electrical systems in ship construction, maintenance, and modernizationFacilitate communications among Navy programs, electrical system integrators, ship designers, shipbuilders and other NSRP panelsSlide6

Current Focus Areas

6

Promote commonality of electrical processes, products, components, and methods across ship programsEvaluate & transition improved electrical system technologies, installation processes, and electrical system specifications. The panel’s mission is to identify and implement technologies and processes that improve:

Total Ownership Cost

Energy Efficiency

Electrical System Performance

Safety of Workforce and Ship’s CrewSlide7

Panel Activities

Panel Projects

Improved Methods for Bonding & GroundingFiber Optic Testing Enhancement for Cost ReductionMaterials & Components for Exterior Electrical Connections (Phase 2) Safer Inspection of MV-HV Systems Alternatives to Fiber Optic Connectors * Final Report Available via NSRP WebsiteSlide8

Panel Activities

Panel Projects

Distributed Temperature Sensing for Inspection of Electrical Panels on Navy ShipsPower Panel and Breaker CommonalityLow Voltage Shipboard Lighting Feasibility Study**Evaluation of Efficacy of Self-Sealing Cable Transit Devices for Aluminum Bulkheads and Decks in Non-Watertight Boundaries** ** 2018 New StartsAreas of InterestElectrical InstallationSolid State Lighting High Temperature Insulated Bus PipeSwitchgear Inspection Slide9

2016 Summary

Panel Meetings

Spring – Joint Panel MeetingDate: May 10-12, 2016Location: Biloxi, MSFocus: Shipboard Power SystemsSummer – Joint Panel Meeting with WD PanelDate: August 24-25, 2016Location: Green Bay, WITour: Marinette MarineWinter – Panel MeetingDate: December 7-8, 2016Location: Jacksonville, FLTour of BAE SystemsFocus: Future Shipboard Power System Technologies and Bonding & Grounding MethodsTechnology Transition ActivitiesShipTech 2016NSRP Day @ NAVSEA

SNAME 2016Slide10

2017 Overview

Panel Meetings

Spring – All Panel MeetingDate: March 7-9, 2017Location: Charleston, SCSummer – Joint Panel Meeting (BT, ELE, SDMT)Date: June 20-21, 2017Location: Portland, METour: Bath Iron Works / DDG 1001Winter – Joint Panel Meeting (ELE, RM)Date: November 7-8, 2017Location: San Diego, CATour: General AtomicsTechnology Transition ActivitiesAll Panel ExpoMFPT 2017

NSRP Day @ NAVSEA

SNAME 2017Slide11

Questions