/
25 April 2013 Thomas Bergauer (HEPHY 25 April 2013 Thomas Bergauer (HEPHY

25 April 2013 Thomas Bergauer (HEPHY - PowerPoint Presentation

limebeauty
limebeauty . @limebeauty
Follow
344 views
Uploaded On 2020-06-22

25 April 2013 Thomas Bergauer (HEPHY - PPT Presentation

Vienna Components and ladder quality control and testing procedures Belle II ViennaPisa meeting Sensor characterisation Thomas Bergauer HEPHY Vienna 25 April 2013 2 Sensor Accounting Thomas Bergauer HEPHY Vienna ID: 783367

vienna hephy thomas 2013 hephy vienna 2013 thomas bergauer april strip measurement stop sensor sensors test module ladder current

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "25 April 2013 Thomas Bergauer (HEPHY" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

25 April 2013

Thomas Bergauer (HEPHY Vienna)

Components and ladder quality control and testing procedures

Belle II Vienna-Pisa meeting

Slide2

Sensor

characterisation

Thomas Bergauer (HEPHY Vienna)

25 April 2013

2

Slide3

Sensor Accounting

Thomas Bergauer (HEPHY Vienna)

25 April 2013

3

Two vendors, three layouts

Layer

#

of Ladders

Rect. Sensors

[narrow]

Rect. Sensors

[wide]

Wedge Sensors

APVs

6

16

0

64

16

800

5

12

0

36

12

480

4

10

0

20

10

300

3

7

14

0

0

168

Sum:

49

14

120

38

1748

Slide4

Rectangular Sensors from Hamamatsu

HPK re-started production of DSSDs on 6” wafers

Old 4” production line was decommissioned

We evaluated first

batches

Quality was constantly

improving

and is now at an acceptable level

Technical details (layers 4,5,6):

Dimensions: 59.6 x 124.88

mm

2

p-side:

768 strips, pitch:

75

µm

n-side:

512 strips, pitch:

240

µm

Thomas Bergauer (HEPHY Vienna)

25 April 2013

4

Slide5

Trapezoidal Sensors from Micron

Trapezoidal sensor for forward region

Different p-stop layouts on test sensors

Atoll p-stop

Common p-stop

Combined p-

stop,

Favoured

by:

[1] IEEE Transactions On Nuclear Science 45 (1998) 303-309 - Iwata

et.al

[2] IEEE Transactions On Nuclear Science 45 (1998) 401-405 -

Unno

et.al

Thomas Bergauer (HEPHY Vienna)

25 April 2013

5

Slide6

Modules for Beam Test 2010

Read out by APV25 (CMS)

Baby Module used to verify p-stop geometries:

Baby Module

Atoll p-stop

Common p-stop

Combined p-

stop

Thomas Bergauer (HEPHY Vienna)

25 April 2013

6

Slide7

Signal-to-noise-ratios

Dark colors: non-irradiated, Light colors: irradiated

Atoll pattern (half-wide) performs best, both irradiated and non-irradiated Charge accumulation in non-implanted regions after irradiation

Test sensors have been Gamma-irradiated with Co-60 (70

Mrad

)

Tested before and after at CERN beam test (120

GeV

hadrons)

Thomas Bergauer (HEPHY Vienna)

25 April 2013

7

Slide8

New prototype order with Atoll p

-stop

Three new masks ordered at Micron SemiconductorP-stop, metal, via

P-stop: Atoll

pattern (half-wide

) [like HPK n-side]

Three

prototype detectors

ordered in 2012

Delivery

for

spring 2012

beam test and irradiation summer/autumn

2012Order placed for mass production beginning 2013

Thomas Bergauer (HEPHY Vienna)

25 April 2013

8

Slide9

Optical inspection Scratches & Marks

Round scratches

occur on every

sensor

maybe

due to automatic sensor

handling

?

Thomas Bergauer (HEPHY Vienna)

25 April 2013

9

Slide10

Strip-by-strip Test Setup

Sensor in Light-tight Box

Vacuum support jig is carrying the sensor

Mounted on

movable

table in X, Y and Z

Needles to contact

different structures on sensor

What do we test?

Electrical parameters

strip failures

Thomas Bergauer (HEPHY Vienna)

25 April 2013

10

Slide11

Open Strip:

Shorted Strip:

“Pinhole” (short between

implant

and metal):

Common strip failures

Open bias resistor:

Open

implant at via:

Open

implant:

25 April 2013

Thomas Bergauer (HEPHY Vienna)

11

Slide12

W

hat do we test?

Global parameters:

IV-Curve:

Dark current, Breakthrough

CV-Curve:

Depletion voltage, Total Capacitance

Strip Parameters e.g.

strip leakage current

I

strip

poly-silicon resistor Rpolycoupling capacitance

Cacdielectric current

Idiel

Thomas Bergauer (HEPHY Vienna)

12

Slide13

Switching Scheme

Thomas Bergauer (HEPHY Vienna)

25 April 2013

13

Slide14

Direct measurement of oxide

thickness

by

electron microscopy

SEM result: 355 nm

average from

C_ac

measurement: 354 nm

Vendor average: 391.8 nm

Measurement validation

25 April 2013

Thomas Bergauer (HEPHY Vienna)

14

Slide15

Measurement of the inter-strip resistance

A

-100V

GND

Electrometer

SMU 1

GND

0...3V (5V)

GND

A

SMU 2

applies bias voltage

ramps potential on

neighbouring DC pad

-> Bias resistor value

from slope of current

Current at 0V is strip

leakage current,

interstrip resistor value

from slope of current

when ramping

25 April 2013

Thomas Bergauer (HEPHY Vienna)

15

Slide16

Full Strip-by-strip results

16

Thomas Bergauer (HEPHY Vienna)

25 April 2013

Slide17

Metrology during Ladder Assembly

Thomas Bergauer (HEPHY Vienna)

25 April 2013

17

Slide18

Wire bonding

Ultrasonic welding technique

25 micron bond wire of Al-Si-1%

Thin Wedge usually used for 17.5um wire

Pull-tests to verify bond quality

Thomas Bergauer (HEPHY Vienna)

25 April 2013

18

Slide19

Mechanical parameters

Measurement of

Mechanical precision of CF ribsAlignment of sensors w.r.t

hybrid

Using 3D mechanical measurement system

Coordinate measurement machine (CMM)

Thomas Bergauer (HEPHY Vienna)

25 April 2013

19

Slide20

Ladder testing

Thomas Bergauer (HEPHY Vienna)

25 April 2013

20

Slide21

Box with motorized XZ Table

Setup built for automatized ladder tests in Vienna

Motorized stages remotely controllable via TCP/IP

HPK mini-PMT with Scintillator for triggering

Thomas Bergauer (HEPHY Vienna)

25 April 2013

21

Slide22

The setup

DUTs on x

-z-

table

Scintillator and

photomultiplier

for trigger

Joystick for moving the x-y-table

(one of many interfaces for user error…)

Thomas Bergauer (HEPHY Vienna)

25 April 2013

22

Slide23

Thomas Bergauer (HEPHY Vienna)

25 April 2013

23

Slide24

Ladder Aging and Burn-IN

Thomas Bergauer (HEPHY Vienna)

25 April 2013

24

Slide25

Climate Chamber

Key

parameters:Volume 350l

Space for 5 ladders

Temperature range -40 up to +200

degC

Rel. Humidity 0 to 95%

Order placed mid March

Will be delivered in

June

this year

Will be used for:Burn-in tests at elevated temperature60-80

degC For durability checks of design

(on pre-production ladders)Thermal cycling

To verify proper function of every single ladder

25

Thomas Bergauer (HEPHY Vienna)

25 April 2013

Slide26

Construction database

How to

store metrology

data

?

Thomas Bergauer (HEPHY Vienna)

25 April 2013

26

Slide27

Belle II construction database

Aim is to keep track of each (expensive) component:

SensorsHybridsModulesLadders=>

Logistics:

Registration, Shipments, Assembly

Add

measurement results

Thomas Bergauer (HEPHY Vienna)

25 April 2013

27

Slide28

Key features

User access system

(benefit of CakePHP framework)Authentication

User/Group permissions

Logistics Module

[already implemented]

Registration: “Add item”

View Inventory of one or all “locations”

Location is e.g. HEPHY, KEK, IPMU,…

Measurement module

[not yet implemented]

Store measurement results

Retrieve data with nice-looking plots

Administration Module

[already implemented]Add/change/remove users and groups

Add new “locations”, “item types”,..

Let’s have a look to each of those…

Thomas Bergauer (HEPHY Vienna)

25 April 2013

28

Slide29

User access system

Individual user accounts

Linked to location, e.g. user Bergi=HEPHY

Thomas Bergauer (HEPHY Vienna)

25 April 2013

29

Slide30

Logistics Module

To view and search for inventory

.

Works only if

Each new component is entered

“Add item” page

Shipments are entered

“Transfer” page

Assembly steps are followed in the

db

“Assembly” page

Thomas Bergauer (HEPHY Vienna)

25 April 2013

30

Slide31

Measurement

module: not yet implemented

Upload measurement results as ASCII files directly to web server (HTTP POST command). Can be done directly from measurement software (e.g.

L

abview

)

Manually

Uploaded ASCII files will be parsed at server side and data will be put into database

Query module will allow to retrieve data (e.g. position of non-working strips) and nice-looking plots (e.g. IV curve on sensor)

Thomas Bergauer (HEPHY Vienna)

25 April 2013

31

Slide32

Summary

Sensor tests well defined

Fraction of full strip-by-strip scan not yet defined (rely on tests done by vendor)Metrology during ladder assembly via CMM

Climate chamber to be commissioned for burn-in and thermal cycling

Web

-based logistics database for SVD has been implemented at

http:/

www.hephy.at

/

hephydb

Thomas Bergauer (HEPHY Vienna)

25 April 2013

32

Slide33

end

Thomas Bergauer (HEPHY Vienna)

25 April 2013

33