Vienna Components and ladder quality control and testing procedures Belle II ViennaPisa meeting Sensor characterisation Thomas Bergauer HEPHY Vienna 25 April 2013 2 Sensor Accounting Thomas Bergauer HEPHY Vienna ID: 783367
Download The PPT/PDF document "25 April 2013 Thomas Bergauer (HEPHY" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
25 April 2013
Thomas Bergauer (HEPHY Vienna)
Components and ladder quality control and testing procedures
Belle II Vienna-Pisa meeting
Slide2Sensor
characterisation
Thomas Bergauer (HEPHY Vienna)
25 April 2013
2
Slide3Sensor Accounting
Thomas Bergauer (HEPHY Vienna)
25 April 2013
3
Two vendors, three layouts
Layer
#
of Ladders
Rect. Sensors
[narrow]
Rect. Sensors
[wide]
Wedge Sensors
APVs
6
16
0
64
16
800
5
12
0
36
12
480
4
10
0
20
10
300
3
7
14
0
0
168
Sum:
49
14
120
38
1748
Slide4Rectangular Sensors from Hamamatsu
HPK re-started production of DSSDs on 6” wafers
Old 4” production line was decommissioned
We evaluated first
batches
Quality was constantly
improving
and is now at an acceptable level
Technical details (layers 4,5,6):
Dimensions: 59.6 x 124.88
mm
2
p-side:
768 strips, pitch:
75
µm
n-side:
512 strips, pitch:
240
µm
Thomas Bergauer (HEPHY Vienna)
25 April 2013
4
Slide5Trapezoidal Sensors from Micron
Trapezoidal sensor for forward region
Different p-stop layouts on test sensors
Atoll p-stop
Common p-stop
Combined p-
stop,
Favoured
by:
[1] IEEE Transactions On Nuclear Science 45 (1998) 303-309 - Iwata
et.al
[2] IEEE Transactions On Nuclear Science 45 (1998) 401-405 -
Unno
et.al
Thomas Bergauer (HEPHY Vienna)
25 April 2013
5
Slide6Modules for Beam Test 2010
Read out by APV25 (CMS)
Baby Module used to verify p-stop geometries:
Baby Module
Atoll p-stop
Common p-stop
Combined p-
stop
Thomas Bergauer (HEPHY Vienna)
25 April 2013
6
Slide7Signal-to-noise-ratios
Dark colors: non-irradiated, Light colors: irradiated
Atoll pattern (half-wide) performs best, both irradiated and non-irradiated Charge accumulation in non-implanted regions after irradiation
Test sensors have been Gamma-irradiated with Co-60 (70
Mrad
)
Tested before and after at CERN beam test (120
GeV
hadrons)
Thomas Bergauer (HEPHY Vienna)
25 April 2013
7
Slide8New prototype order with Atoll p
-stop
Three new masks ordered at Micron SemiconductorP-stop, metal, via
P-stop: Atoll
pattern (half-wide
) [like HPK n-side]
Three
prototype detectors
ordered in 2012
Delivery
for
spring 2012
beam test and irradiation summer/autumn
2012Order placed for mass production beginning 2013
Thomas Bergauer (HEPHY Vienna)
25 April 2013
8
Slide9Optical inspection Scratches & Marks
Round scratches
occur on every
sensor
maybe
due to automatic sensor
handling
?
Thomas Bergauer (HEPHY Vienna)
25 April 2013
9
Slide10Strip-by-strip Test Setup
Sensor in Light-tight Box
Vacuum support jig is carrying the sensor
Mounted on
movable
table in X, Y and Z
Needles to contact
different structures on sensor
What do we test?
Electrical parameters
strip failures
Thomas Bergauer (HEPHY Vienna)
25 April 2013
10
Slide11Open Strip:
Shorted Strip:
“Pinhole” (short between
implant
and metal):
Common strip failures
Open bias resistor:
Open
implant at via:
Open
implant:
25 April 2013
Thomas Bergauer (HEPHY Vienna)
11
Slide12W
hat do we test?
Global parameters:
IV-Curve:
Dark current, Breakthrough
CV-Curve:
Depletion voltage, Total Capacitance
Strip Parameters e.g.
strip leakage current
I
strip
poly-silicon resistor Rpolycoupling capacitance
Cacdielectric current
Idiel
Thomas Bergauer (HEPHY Vienna)
12
Slide13Switching Scheme
Thomas Bergauer (HEPHY Vienna)
25 April 2013
13
Slide14Direct measurement of oxide
thickness
by
electron microscopy
SEM result: 355 nm
average from
C_ac
measurement: 354 nm
Vendor average: 391.8 nm
Measurement validation
25 April 2013
Thomas Bergauer (HEPHY Vienna)
14
Slide15Measurement of the inter-strip resistance
A
-100V
GND
Electrometer
SMU 1
GND
0...3V (5V)
GND
A
SMU 2
applies bias voltage
ramps potential on
neighbouring DC pad
-> Bias resistor value
from slope of current
Current at 0V is strip
leakage current,
interstrip resistor value
from slope of current
when ramping
25 April 2013
Thomas Bergauer (HEPHY Vienna)
15
Slide16Full Strip-by-strip results
16
Thomas Bergauer (HEPHY Vienna)
25 April 2013
Slide17Metrology during Ladder Assembly
Thomas Bergauer (HEPHY Vienna)
25 April 2013
17
Slide18Wire bonding
Ultrasonic welding technique
25 micron bond wire of Al-Si-1%
Thin Wedge usually used for 17.5um wire
Pull-tests to verify bond quality
Thomas Bergauer (HEPHY Vienna)
25 April 2013
18
Slide19Mechanical parameters
Measurement of
Mechanical precision of CF ribsAlignment of sensors w.r.t
hybrid
Using 3D mechanical measurement system
Coordinate measurement machine (CMM)
Thomas Bergauer (HEPHY Vienna)
25 April 2013
19
Slide20Ladder testing
Thomas Bergauer (HEPHY Vienna)
25 April 2013
20
Slide21Box with motorized XZ Table
Setup built for automatized ladder tests in Vienna
Motorized stages remotely controllable via TCP/IP
HPK mini-PMT with Scintillator for triggering
Thomas Bergauer (HEPHY Vienna)
25 April 2013
21
Slide22The setup
DUTs on x
-z-
table
Scintillator and
photomultiplier
for trigger
Joystick for moving the x-y-table
(one of many interfaces for user error…)
Thomas Bergauer (HEPHY Vienna)
25 April 2013
22
Slide23Thomas Bergauer (HEPHY Vienna)
25 April 2013
23
Slide24Ladder Aging and Burn-IN
Thomas Bergauer (HEPHY Vienna)
25 April 2013
24
Slide25Climate Chamber
Key
parameters:Volume 350l
Space for 5 ladders
Temperature range -40 up to +200
degC
Rel. Humidity 0 to 95%
Order placed mid March
Will be delivered in
June
this year
Will be used for:Burn-in tests at elevated temperature60-80
degC For durability checks of design
(on pre-production ladders)Thermal cycling
To verify proper function of every single ladder
25
Thomas Bergauer (HEPHY Vienna)
25 April 2013
Slide26Construction database
How to
store metrology
data
?
Thomas Bergauer (HEPHY Vienna)
25 April 2013
26
Slide27Belle II construction database
Aim is to keep track of each (expensive) component:
SensorsHybridsModulesLadders=>
Logistics:
Registration, Shipments, Assembly
Add
measurement results
Thomas Bergauer (HEPHY Vienna)
25 April 2013
27
Slide28Key features
User access system
(benefit of CakePHP framework)Authentication
User/Group permissions
Logistics Module
[already implemented]
Registration: “Add item”
View Inventory of one or all “locations”
Location is e.g. HEPHY, KEK, IPMU,…
Measurement module
[not yet implemented]
Store measurement results
Retrieve data with nice-looking plots
Administration Module
[already implemented]Add/change/remove users and groups
Add new “locations”, “item types”,..
Let’s have a look to each of those…
Thomas Bergauer (HEPHY Vienna)
25 April 2013
28
Slide29User access system
Individual user accounts
Linked to location, e.g. user Bergi=HEPHY
Thomas Bergauer (HEPHY Vienna)
25 April 2013
29
Slide30Logistics Module
To view and search for inventory
.
Works only if
Each new component is entered
“Add item” page
Shipments are entered
“Transfer” page
Assembly steps are followed in the
db
“Assembly” page
Thomas Bergauer (HEPHY Vienna)
25 April 2013
30
Slide31Measurement
module: not yet implemented
Upload measurement results as ASCII files directly to web server (HTTP POST command). Can be done directly from measurement software (e.g.
L
abview
)
Manually
Uploaded ASCII files will be parsed at server side and data will be put into database
Query module will allow to retrieve data (e.g. position of non-working strips) and nice-looking plots (e.g. IV curve on sensor)
Thomas Bergauer (HEPHY Vienna)
25 April 2013
31
Slide32Summary
Sensor tests well defined
Fraction of full strip-by-strip scan not yet defined (rely on tests done by vendor)Metrology during ladder assembly via CMM
Climate chamber to be commissioned for burn-in and thermal cycling
Web
-based logistics database for SVD has been implemented at
http:/
www.hephy.at
/
hephydb
Thomas Bergauer (HEPHY Vienna)
25 April 2013
32
Slide33end
Thomas Bergauer (HEPHY Vienna)
25 April 2013
33