/
Rigging Guide Rigging Guide

Rigging Guide - PDF document

lindsaybiker
lindsaybiker . @lindsaybiker
Follow
344 views
Uploaded On 2020-11-20

Rigging Guide - PPT Presentation

Race Kit V1 PLEASE FOLLOW ASSEMBLY GUIDE IN THE CORRECT ORDER Introduction Congratulations on purchasing your RS Feva Race Pack This pack in conjunction with We have tried to make these instructions ID: 820425

system thread cleat bridle thread system bridle cleat race tie boom halyard mast kicker block strap outhaul downhaul secure

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Rigging Guide" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Rigging Guide Race Kit V1PLEASE FOLLOW
Rigging Guide Race Kit V1PLEASE FOLLOW ASSEMBLY GUIDE IN THE CORRECT ORDERIntroductionCongratulations on purchasing your RS Feva Race Pack. This pack in conjunction with We have tried to make these ins

tructions easy to follow. They show, wi
tructions easy to follow. They show, with pictures, how to rig the following controls:• Adjustable mainsheet bridle 1 - Adjustable Bridle• Unthread your mainsheet completely.1)2)3)4)5)• Take

one end of the new bridle and thread th
one end of the new bridle and thread through the rear gunwhale hole. • Thread the bridle ends through the bobbles and to secure.• Adjust the bridle with the loose ends through 1)2)4)5)6)3)â

€¢ Remove the existing outhaul system co
€¢ Remove the existing outhaul system completely.• Thread the 4mm line (loop end �rst) through the ‘D’ • Thread the loop over the back end of the boom to secure.• Tie the remaining

‘control line’ to the bridge of the
‘control line’ to the bridge of the 2 - Boom Outhaul System2 - Boom Outhaul System7)8)9) tied to the mast.10)3 - Mainsail Clew Strap1)2)3)4)• Thread the strap through the clew (٠

06C;uffy side down) to the midpoint o
06C;uffy side down) to the midpoint of the strap.sided end around it. again ensuring it is inside all lines. attached as shown in picture.4 - 6:1 Race Kicker1)2)3)4)attachment strops.• Threa

d the boom strop through the top b
d the boom strop through the top block of the new kicker.secure with a knot.• Attach the swivel shackle (located at the base of the jammer) to the large shackle/clip attached to the mast strop.1

)2)3)4)kicker lacing eye. â
)2)3)4)kicker lacing eye. • Take the top block (with hook) and connect to the downhaul cringle at the tack of the mainsail.• Take the control line from above the �nal block in

the system and thread it through the m
the system and thread it through the mast downhaul cleat.5 - Race Downhaul System Ensure all items stay attached!6 - Jib Halyard Purchase System1)2)3)4)• Thread the halyard through the shea

ve and tie a as shown in picture.• L
ve and tie a as shown in picture.• Lead the halyard down to the horn cleat. Cleat off and tie a double horn cleat.5) centre of the sheave. Apply tension and tie off either 6 - Jib Halyard Purchase