GANIL Scientific Council February 2013 AGATA Campaign at GANIL EClément GANIL Scientific Council February 2013 Outline Status of AGATA Preparation to the GANIL campaign ID: 467128
Download Presentation The PPT/PDF document "E.Clément" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
E.Clément GANIL Scientific Council February 2013
AGATA Campaign at GANILSlide2
E.Clément GANIL Scientific Council February 2013
Outline
Status of AGATA
Preparation to the GANIL campaign
Performances simulations of the AGATA array
AGATA@GANIL:
Project Organization and Planning
Report of the working GroupSlide3
E.Clément GANIL Scientific Council February 2013
2010
2012 LNL
: 5TC
AGATA D.+PRISMA
Total
Eff
(compact). ~6%
Status of AGATA: LNL Campaign in 2010-2012
Lifetime measurement of the 6.79
MeV
state in
15
O.The energy and angular resolution of the AD will allow to reach a lifetime measurement in the fs range
C. Michelagnoli et, in preparation
C.
Louchard
et al, to
be submitted
Successful demonstration phase with a limited number of detectors concluding a long period of R&D (~70 NIMA papers in ~ 10 years (2002-2012) )First physics results are submitted or drafted within the collaborationSlide4
E.Clément GANIL Scientific Council February 2013
2012
GSI/FRS
5TC+3 DC
AGATA D.+PRISMA
AGATA @
FRS
Total Eff
. (
b
=0.5) ~
10%
Total
Eff
(compact).
~6%
35
LoI
have been submitted in May 2010
Conveners
: M. Bentley, W.
Korten
144
shifts (46 days) have been allocated
4 Weeks of data taking from October to November 2012 + several commissioning runs
Workshop hold in December for the second beam period
New proposals submitted for 6 weeks
Next beam time in November-December
2013 (…2014)
Quadratic evolution of collectivity in the
208
Pb vicinity (S429)
The Pygmy Dipole Resonance in
64Fe and the properties of neutron skin (S430) Coulomb-excitation of the band-terminating 12+ yrast trap in 58Ni (S433) Shape evolution in very-neutron rich Zr isotopes (S428)
2010 2012 LNL : 5TC
Status of AGATA: GSI Campaign in 2012-2014Slide5
E.Clément GANIL Scientific Council February 2013
GSI Beam time
19/20
crystals running
21 channel fully instrumented
29
th
of January 2013 32 capsules have been produced 24 are operational 3 to be fixed after failure 5 waiting to be fixed after LNL annealingStatus of AGATA: the array
The remaining 4 electronic chains in final stage of test 25 capsules fully instrumented with electronic version 1 for 2013 End 2012 : 3 more capsules have been ordered by IN2P3 (2) and Spain (1) By end of 2013 : 35 capsules By the end of the GANIL phase 1p (45 capsules)New electronic to equip the next 20 capsules (1p
)Padova and Orsay designs evaluated by 7 international expertsPadova electronic choosen in Autumn 2012; to be delivered in mid-2013Slide6
Preparation to the GANIL campaignE.Clément GANIL Scientific Council February
2013Slide7
E.Clément GANIL Scientific Council February 2013
:
Campaign spokesperson
: S.
Lenzi
(Univ.
Padova
)Call for LOI sent in October 2012: dead line 8th February 2013
1st workshop on the18th - 20th of February organized at GANIL ,dedicated
to the physics of the GANIL Campaign using stable and radioactive beams (SPIRAL1) Create the basis for defining the priorities for a detailed scientific program of the campaign
Assess the technical feasibility, constrain the infrastructure
and ancillary detectors integration.
Identify common setup to be run in a row or physics case and collaborations
A summary of the physics objectives will be presented at the next SC for evaluation
1
st
PAC including AGATA proposal
13th AGATA week organized on the next 20th
-22nd of March at GANILThe GANIL Campaign 2014 VAMOS cave toward 1pSlide8
E.Clément GANIL Scientific Council February 2013
g
-ray spectroscopy of very neutron-rich nuclei populated in Deep Inelastic
Collisions
or induced fission using VAMOS to identify the reaction products in Q, A and Z.
Spectroscopy of heavy elements towards SHE and N=Z nuclei populated by fusion –evaporation with VAMOS in gas-filled mode.
Spectroscopy at high spins after fusion-evaporation Spectroscopy of p-rich nuclei at the N=Z line using the
Nwall and DIAMANT Spectroscopy using existing and new SPIRAL1 beams Ensuring these physics cases with the appropriate ancillaries detectors
Mechanical integrationSlide9
E.Clément GANIL Scientific Council February 2013
Charged particle array for transfer reaction MUST2/TIARA : (
d,p
) etc … program with SIB and RIB
Charged particle array for prompt tagging : DIAMANT
Neutron detector (
Nwall
) Charged particle array for Recoil Decay Tagging : MUSETT Scintillator : BaF2 array, LaBr3 Future detector : NEDA (n) , GASPARD ( ?), PARIS (LaBr3)
In G1 coupled to VAMOS (+ EXOGAM2): SIBs, RIBs
AGATA 1p at GANIL : Ancillary devices At 0° as separator (
vaccum/gas-filled)
Angles >10 deg for fission & MNTSlide10
VAMOS
The VAMOS spectrometer is expected to play a major role in the campaign
Upgrades are still possible in the dispersive mode as magnetic spectrometer
Fully operational now (
M.
Rejmund
et al, NIM A 646 (2011) 184-191 )A test in gas-filled mode has shown the competitivity of the setupOptimum configuration to be funded ANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen &
Ch. Schmitt) If funded in 2013, should be operational mid-2015E.Clément GANIL Scientific Council February 2013Slide11
Performances simulations of the AGATA arrayE.Clément GANIL Scientific Council February
2013Slide12
E.Clément GANIL Scientific Council February 2013
J.
Ljungvall
(CSNSM)
M.
Labiche
(STFC)
for the AGATA collaboration - Preliminary× ~ 1.25
× ~ 1.5AGATA nominal 233 mmEXOGAM nominal 145 mmPerformance of the AGATA array
AGATA should leave GSI with a minimum of 25 capsules (5ATC + 5ADC) fully instrumented Additional detectors will be delivered during the campaign End of the campaign : 45 capsules covering 1p LNL phaseGSI phaseSlide13
E.Clément GANIL Scientific Council February 2013
b
=12%
More than efficiency , AGATA provides higher sensitivity
× ~ 4.7
× ~ 12
Performance of the AGATA arraySlide14
E.Clément GANIL Scientific Council February 2013
EXOGAM, LaBr3, BaF2 …
AGATA Configurations
at
GANIL
E.
Farnea
et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343Slide15
AGATA@GANIL Project Organization and PlanningE.Clément GANIL Scientific Council
February 2013Slide16
E.Clément GANIL Scientific Council February 2013
Local organization done
Tasks distribution and their detailed description were distributed
GANIL project :
Set of spec delivered, detailed planning, resources evaluation, budget, development plan, PBS, WBS distributed
Security/safety :
Installation description for DIRC01 :
1st draft released, risk analysis beginning of 2013
The call for tender, to be launched by May 2013 after GANIL management review, are under preparationSpecific infrastructure to be delivered in December 2013In 2012, ~4 FTE have worked on the project (20 persons involved at GANIL)For 2013-2014, ~80 m.month are evaluated
OrganisationSlide17
E.Clément GANIL Scientific Council February 2013
Schedule
(assuming that material from GSI arrive on Jan-Feb 2014)
Gas-filled installation expected in mid-2015 if funded in 2013
GANISOL
beams
available for physics beginning of 2016
No SPIRAL1 beam in 2014-2015GANIL has requested the host of AGATA until end of 2016
T2-12T3-12
T4-12T1-13T2-13T3-13
T4-13
T1-14
T2-14
T3-14
T4-14
…
T4-16
Mechanics
STFC Design
GANIL Impl
IPHC construc
Mounting
Infrastructure det
GANIL
Studies
Collecting items
Installation
LN2, AF
GANIL Studies
Collecting items
Installation
Test
DAQ Hardware
GANIL Studies
Collecting items
Installation
Test
DAQ Software
Prep
.
Test
Processing Room
Renov Aire Proj
AGATA infra
Detector
Mounting
Source & Commi
Expt … Slide18
E.Clément GANIL Scientific Council February 2013Slide19
E.Clément GANIL Scientific Council February 2013
~150 k€
~17k€
Processing room 019
Upgrade ~ 102k€
Detector lab infrastructure
~15 k€
Cryogenic upgrade, connection ~25 k€
Total investment cost ~380 k€
Optical fibers links ~70k€Slide20
E.Clément GANIL Scientific Council February 2013
Budget : Total cost investment ~380k€
237 k€ guaranteed by GANIL for 2013 to be completed in the 2014 request
IPHC requested 90k€ from IN2P3-AP for the mechanic
ANR (French Research Funding Agency) request for the gas-filled mode submitted by the
Saclay
and GANIL group (PI : Ch.
Theisen & Ch. Schmitt)Loan of material from LNL & GSI (cooled cabinet, racks, water distribution, Optical link) under evaluationSlide21
Report of the working GroupsE.Clément GANIL Scientific Council
February 2013Slide22
E.Clément GANIL Scientific Council February 2013 Detectors support design done by STFC
Daresbury in close collaboration with GANIL
GANIL designs the additional platform
GANIL takes in
charge
the integration work Projection T1 -2013 9 months of construction estimated starting by T1-2013On-going collaboration with the IPHC workshop for the construction of the support
Workshop for the extended platform not yet definedI. Burrows (STFC) M. Ozille, P. Gangnant (GANIL)
MechanicSlide23
E.Clément GANIL Scientific Council February 2013
I. Burrows (STFC) M.
Ozille
(GANIL) G.
Gaudiot
(IPHC)
Mechanic
First 2D projections have been released in January
On-going validation and fine cost estimate Mechanical stress and rigidity calculations validatedSlide24
E.Clément GANIL Scientific Council February 2013
M.
Ozille
(GANIL)
MechanicSlide25
E.Clément GANIL Scientific Council February 2013
M.
Ozille
, P.
Gangnant
, G. Fremont (GANIL)
GANIL is in charge of the beam
section and target chamber design for most of the experiment Specific configuration will be treated case by case Target loader : Detailed design on going by GANIL Final decision will be taken after the physics workshopTarget loader and
beam lineSlide26
E.Clément GANIL Scientific Council February 2013
Salle G1
AGATA
EXOGAM
Elec
.
AGATA
Elec
.DSS
300 optical wires
Water cooling
26° 8 bars
27 kW UPS
L.
Menager
, J. Ropert, JL. Foucher (GANIL)
Integration
Cryogenic
distributionSlide27
E.Clément GANIL Scientific Council February 2013
L.
Menager
, M
.
Jean , N. Menard
(GANIL)
The foreseen room required important investment (refurbishment, electricity, water cooling, air conditioning …)G1 caveIntegrationSlide28
E.Clément GANIL Scientific Council February 2013
Performance simulations : on-going (final release in February)
Electronic coupling: on-going (several meeting already done, transfer of knowledge in GSI during 2013
)
Detector: starting (
transfer of knowledge in
GSI during 2013)Data flow, DAQ: on-going (several meeting already done, no problem anticipated)
Mechanic design : on-going (final design review)Optical link : on-going (purchase order expected on April)Data analysis : starting (first meeting on the first week of Dec.)
AutoFill-cryogenic : on-going (definition of the installation, call for tender in April)Infrastructure : on-going (needs identified, final design review on going)Slide29
ConclusionE.Clément GANIL Scientific Council
February 2013
The AGATA physics prospective is on-going and physics objectives will be presented at the next CS for evaluation after the workshop organized in February
2014-mid 2015 : AGATA-VAMOS+ “light” ancillary
2015 : gas-filled, NWALL
2016 : SPIRAL1 beams
The AGATA project at GANIL made progress in all different items with a particular attention on the mechanic and the integration
The transfer of knowledge on detectors and electronic will be organized in 2013 during off and on-beam period at GSI with GANIL technical staff. Mechanical construction should start soon, delivery by end of 2013 Call for tender are expected to be sent by May 2013 for infrastructure Data Acquisition and Data analysis preparation will progress over 2013
GANIL technical involvement is already significant Budget guaranteed by GANIL for 2013 to be completed in the 2014 requestSlide30
E.Clément GANIL Scientific Council February 2013Slide31
E.Clément GANIL Scientific Council
February 2013Slide32
E.Clément GANIL Scientific Council February 2013
5TC
1
p
Without
tracking
E. Farnea et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343Slide33
E.Clément GANIL Scientific Council February 2013Slide34
E.Clément GANIL Scientific Council
February 2013Slide35
E.Clément GANIL Scientific Council
February 2013Slide36
E.Clément GANIL Scientific Council
February 2013Slide37
E.Clément GANIL Scientific Council
February 2013Slide38
E.Clément GANIL Scientific Council
February 2013Slide39
E.Clément GANIL Scientific Council
February 2013