E.Clément E.Clément

E.Clément - PowerPoint Presentation

marina-yarberry
marina-yarberry . @marina-yarberry
Follow
418 views
Uploaded On 2016-09-16

E.Clément - PPT Presentation

GANIL Scientific Council February 2013 AGATA Campaign at GANIL EClément GANIL Scientific Council February 2013 Outline Status of AGATA Preparation to the GANIL campaign ID: 467128

2013 ganil scientific february ganil 2013 february scientific ment council

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "E.Clément" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

E.Clément GANIL Scientific Council February 2013

AGATA Campaign at GANILSlide2

E.Clément GANIL Scientific Council February 2013

Outline

Status of AGATA

Preparation to the GANIL campaign

Performances simulations of the AGATA array

AGATA@GANIL:

Project Organization and Planning

Report of the working GroupSlide3

E.Clément GANIL Scientific Council February 2013

2010

2012 LNL

: 5TC

AGATA D.+PRISMA

Total

Eff

(compact). ~6%

Status of AGATA: LNL Campaign in 2010-2012

Lifetime measurement of the 6.79

MeV

state in

15

O.The energy and angular resolution of the AD will allow to reach a lifetime measurement in the fs range

C. Michelagnoli et, in preparation

C.

Louchard

et al, to

be submitted

Successful demonstration phase with a limited number of detectors concluding a long period of R&D (~70 NIMA papers in ~ 10 years (2002-2012) )First physics results are submitted or drafted within the collaborationSlide4

E.Clément GANIL Scientific Council February 2013

2012

 GSI/FRS

5TC+3 DC

AGATA D.+PRISMA

AGATA @

FRS

Total Eff

. (

b

=0.5) ~

10%

Total

Eff

(compact).

~6%

35

LoI

have been submitted in May 2010

Conveners

: M. Bentley, W.

Korten

144

shifts (46 days) have been allocated

4 Weeks of data taking from October to November 2012 + several commissioning runs

Workshop hold in December for the second beam period

New proposals submitted for 6 weeks

Next beam time in November-December

2013 (…2014)

Quadratic evolution of collectivity in the

208

Pb vicinity (S429)

The Pygmy Dipole Resonance in

64Fe and the properties of neutron skin (S430) Coulomb-excitation of the band-terminating 12+ yrast trap in 58Ni (S433) Shape evolution in very-neutron rich Zr isotopes (S428)

2010  2012 LNL : 5TC

Status of AGATA: GSI Campaign in 2012-2014Slide5

E.Clément GANIL Scientific Council February 2013

GSI Beam time

19/20

crystals running

21 channel fully instrumented

29

th

of January 2013 32 capsules have been produced 24 are operational 3 to be fixed after failure 5 waiting to be fixed after LNL annealingStatus of AGATA: the array

The remaining 4 electronic chains in final stage of test 25 capsules fully instrumented with electronic version 1 for 2013 End 2012 : 3 more capsules have been ordered by IN2P3 (2) and Spain (1)  By end of 2013 : 35 capsules By the end of the GANIL phase  1p (45 capsules)New electronic to equip the next 20 capsules (1p

)Padova and Orsay designs evaluated by 7 international expertsPadova electronic choosen in Autumn 2012; to be delivered in mid-2013Slide6

Preparation to the GANIL campaignE.Clément GANIL Scientific Council February

2013Slide7

E.Clément GANIL Scientific Council February 2013

:

Campaign spokesperson

: S.

Lenzi

(Univ.

Padova

)Call for LOI sent in October 2012: dead line 8th February 2013

1st workshop on the18th - 20th of February organized at GANIL ,dedicated

to the physics of the GANIL Campaign using stable and radioactive beams (SPIRAL1) Create the basis for defining the priorities for a detailed scientific program of the campaign 

Assess the technical feasibility, constrain the infrastructure

and ancillary detectors integration.

Identify common setup to be run in a row or physics case and collaborations

A summary of the physics objectives will be presented at the next SC for evaluation

 1

st

PAC including AGATA proposal

13th AGATA week organized on the next 20th

-22nd of March at GANILThe GANIL Campaign 2014  VAMOS cave toward 1pSlide8

E.Clément GANIL Scientific Council February 2013

g

-ray spectroscopy of very neutron-rich nuclei populated in Deep Inelastic

Collisions

or induced fission using VAMOS to identify the reaction products in Q, A and Z.

Spectroscopy of heavy elements towards SHE and N=Z nuclei populated by fusion –evaporation with VAMOS in gas-filled mode.

Spectroscopy at high spins after fusion-evaporation Spectroscopy of p-rich nuclei at the N=Z line using the

Nwall and DIAMANT Spectroscopy using existing and new SPIRAL1 beams Ensuring these physics cases with the appropriate ancillaries detectors

Mechanical integrationSlide9

E.Clément GANIL Scientific Council February 2013

Charged particle array for transfer reaction MUST2/TIARA : (

d,p

) etc … program with SIB and RIB

Charged particle array for prompt tagging : DIAMANT

Neutron detector (

Nwall

) Charged particle array for Recoil Decay Tagging : MUSETT Scintillator : BaF2 array, LaBr3 Future detector : NEDA (n) , GASPARD ( ?), PARIS (LaBr3)

In G1 coupled to VAMOS (+ EXOGAM2): SIBs, RIBs

AGATA 1p at GANIL : Ancillary devices At 0° as separator (

vaccum/gas-filled)

Angles >10 deg for fission & MNTSlide10

VAMOS

The VAMOS spectrometer is expected to play a major role in the campaign

Upgrades are still possible in the dispersive mode as magnetic spectrometer

Fully operational now (

M.

Rejmund

et al, NIM A 646 (2011) 184-191 )A test in gas-filled mode has shown the competitivity of the setupOptimum configuration to be funded ANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen &

Ch. Schmitt)  If funded in 2013, should be operational mid-2015E.Clément GANIL Scientific Council February 2013Slide11

Performances simulations of the AGATA arrayE.Clément GANIL Scientific Council February

2013Slide12

E.Clément GANIL Scientific Council February 2013

J.

Ljungvall

(CSNSM)

M.

Labiche

(STFC)

for the AGATA collaboration - Preliminary× ~ 1.25

× ~ 1.5AGATA nominal 233 mmEXOGAM nominal 145 mmPerformance of the AGATA array

AGATA should leave GSI with a minimum of 25 capsules (5ATC + 5ADC) fully instrumented Additional detectors will be delivered during the campaign End of the campaign : 45 capsules covering 1p LNL phaseGSI phaseSlide13

E.Clément GANIL Scientific Council February 2013

b

=12%

More than efficiency , AGATA provides higher sensitivity

× ~ 4.7

× ~ 12

Performance of the AGATA arraySlide14

E.Clément GANIL Scientific Council February 2013

EXOGAM, LaBr3, BaF2 …

AGATA Configurations

at

GANIL

E.

Farnea

et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343Slide15

AGATA@GANIL Project Organization and PlanningE.Clément GANIL Scientific Council

February 2013Slide16

E.Clément GANIL Scientific Council February 2013

Local organization done

Tasks distribution and their detailed description were distributed

GANIL project :

Set of spec delivered, detailed planning, resources evaluation, budget, development plan, PBS, WBS distributed

Security/safety :

Installation description for DIRC01 :

 1st draft released, risk analysis beginning of 2013

The call for tender, to be launched by May 2013 after GANIL management review, are under preparationSpecific infrastructure to be delivered in December 2013In 2012, ~4 FTE have worked on the project (20 persons involved at GANIL)For 2013-2014, ~80 m.month are evaluated

OrganisationSlide17

E.Clément GANIL Scientific Council February 2013

Schedule

(assuming that material from GSI arrive on Jan-Feb 2014)

Gas-filled installation expected in mid-2015 if funded in 2013

GANISOL

beams

available for physics beginning of 2016

No SPIRAL1 beam in 2014-2015GANIL has requested the host of AGATA until end of 2016

T2-12T3-12

T4-12T1-13T2-13T3-13

T4-13

T1-14

T2-14

T3-14

T4-14

T4-16

 

 

 

 

 

 

 

 

 

 

 

 

Mechanics

 

STFC Design

 

GANIL Impl

 

IPHC construc

 

Mounting

 

 

 

 

 

Infrastructure det

 

 

GANIL

Studies

 

 

Collecting items

 

 

Installation

 

 

 

 

LN2, AF

 

 

GANIL Studies

 

 

Collecting items

Installation

Test

 

 

 

 

DAQ Hardware

 

 

GANIL Studies

 

 

Collecting items

 

Installation

Test

 

 

 

 

DAQ Software

 

 

 

 

 

Prep

.

 

 

Test

 

 

 

 

Processing Room

 

 

 

Renov Aire Proj

 

AGATA infra

 

 

 

 

 

 

 

Detector

 

 

 

 

 

 

 

 

Mounting

 

 

 

 

Source & Commi

 

 

 

 

         Expt           … Slide18

E.Clément GANIL Scientific Council February 2013Slide19

E.Clément GANIL Scientific Council February 2013

~150 k€

~17k€

Processing room 019

Upgrade ~ 102k€

Detector lab infrastructure

~15 k€

Cryogenic upgrade, connection ~25 k€

Total investment cost ~380 k€

Optical fibers links ~70k€Slide20

E.Clément GANIL Scientific Council February 2013

Budget : Total cost investment ~380k€

237 k€ guaranteed by GANIL for 2013 to be completed in the 2014 request

IPHC requested 90k€ from IN2P3-AP for the mechanic

ANR (French Research Funding Agency) request for the gas-filled mode submitted by the

Saclay

and GANIL group (PI : Ch.

Theisen & Ch. Schmitt)Loan of material from LNL & GSI (cooled cabinet, racks, water distribution, Optical link) under evaluationSlide21

Report of the working GroupsE.Clément GANIL Scientific Council

February 2013Slide22

E.Clément GANIL Scientific Council February 2013 Detectors support design done by STFC

Daresbury in close collaboration with GANIL

GANIL designs the additional platform

GANIL takes in

charge

the integration work Projection T1 -2013 9 months of construction estimated starting by T1-2013On-going collaboration with the IPHC workshop for the construction of the support

Workshop for the extended platform not yet definedI. Burrows (STFC) M. Ozille, P. Gangnant (GANIL)

MechanicSlide23

E.Clément GANIL Scientific Council February 2013

I. Burrows (STFC) M.

Ozille

(GANIL) G.

Gaudiot

(IPHC)

Mechanic

First 2D projections have been released in January

On-going validation and fine cost estimate Mechanical stress and rigidity calculations validatedSlide24

E.Clément GANIL Scientific Council February 2013

M.

Ozille

(GANIL)

MechanicSlide25

E.Clément GANIL Scientific Council February 2013

M.

Ozille

, P.

Gangnant

, G. Fremont (GANIL)

GANIL is in charge of the beam

section and target chamber design for most of the experiment Specific configuration will be treated case by case Target loader : Detailed design on going by GANIL Final decision will be taken after the physics workshopTarget loader and

beam lineSlide26

E.Clément GANIL Scientific Council February 2013

Salle G1

AGATA

EXOGAM

Elec

.

AGATA

Elec

.DSS

300 optical wires

Water cooling

26° 8 bars

27 kW UPS

L.

Menager

, J. Ropert, JL. Foucher (GANIL)

Integration

Cryogenic

distributionSlide27

E.Clément GANIL Scientific Council February 2013

L.

Menager

, M

.

Jean , N. Menard

(GANIL)

The foreseen room required important investment (refurbishment, electricity, water cooling, air conditioning …)G1 caveIntegrationSlide28

E.Clément GANIL Scientific Council February 2013

Performance simulations : on-going (final release in February)

Electronic coupling: on-going (several meeting already done, transfer of knowledge in GSI during 2013

)

Detector: starting (

transfer of knowledge in

GSI during 2013)Data flow, DAQ: on-going (several meeting already done, no problem anticipated)

Mechanic design : on-going (final design review)Optical link : on-going (purchase order expected on April)Data analysis : starting (first meeting on the first week of Dec.)

AutoFill-cryogenic : on-going (definition of the installation, call for tender in April)Infrastructure : on-going (needs identified, final design review on going)Slide29

ConclusionE.Clément GANIL Scientific Council

February 2013

The AGATA physics prospective is on-going and physics objectives will be presented at the next CS for evaluation after the workshop organized in February

2014-mid 2015 : AGATA-VAMOS+ “light” ancillary

2015 : gas-filled, NWALL

2016 : SPIRAL1 beams

The AGATA project at GANIL made progress in all different items with a particular attention on the mechanic and the integration

The transfer of knowledge on detectors and electronic will be organized in 2013 during off and on-beam period at GSI with GANIL technical staff. Mechanical construction should start soon, delivery by end of 2013 Call for tender are expected to be sent by May 2013 for infrastructure Data Acquisition and Data analysis preparation will progress over 2013

GANIL technical involvement is already significant Budget guaranteed by GANIL for 2013 to be completed in the 2014 requestSlide30

E.Clément GANIL Scientific Council February 2013Slide31

E.Clément GANIL Scientific Council

February 2013Slide32

E.Clément GANIL Scientific Council February 2013

5TC

1

p

Without

tracking

E. Farnea et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343Slide33

E.Clément GANIL Scientific Council February 2013Slide34

E.Clément GANIL Scientific Council

February 2013Slide35

E.Clément GANIL Scientific Council

February 2013Slide36

E.Clément GANIL Scientific Council

February 2013Slide37

E.Clément GANIL Scientific Council

February 2013Slide38

E.Clément GANIL Scientific Council

February 2013Slide39

E.Clément GANIL Scientific Council

February 2013