Marco Statera on behalf of the LASA team LASA lab INFN Milano SUMMARY sextupole magnetic measurements and simulations octupole status decapole status next steps conclusions ID: 792689

statera lasa marco 2016 lasa statera 2016 marco group cern coils units design preliminary test procurement 10pole 10p measurement

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "High Order Correctors update" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

High Order Correctorsupdate

Marco Statera

on

behalf

of the LASA team

LASA lab – INFN Milano

Slide2

SUMMARYsextupole magnetic

measurements

and simulationsoctupole statusdecapole statusnext stepsconclusions

CERN 2016/10/05

Marco Statera for the LASA team

1

Slide3

6POLECERN 2016/10/05

Marco Statera for the LASA group

2

6P

4P

12P

10P

8P

produced

tested

measured

Slide4

TRANSFER FUNCTIONCERN 2016/10/05

Marco Statera for the LASA group

3

current

[A]

magnetic

length

[mm]

TF

measured

CERN

2016/08

[T mm/A]TF simulationOPERA[T mm/A]preliminary measurement[T mm/A]25.7 10-45.74 10-4linear @295 K64.1118

5.7 10-45.74 10-45.1 10-4linear @1.9 K134.4114.54.7 10-44.77 10-44.4 10-4not linear @1.9 K

nominal

value: 4.68 10-4

Hall probe

(not visible)

Spacer to

align

Slide5

FIELD COMPONENTS

A9/B9

UNITS

A12/B12

UNITS

A15/B15

UNITS

A21/B21

UNITS

A27/B27

UNITS

TF

[

Tmm/A]295K preliminary0.5/-4.50/-0.50/-2.25  

5.7 E-4TOSCA linear-3 -1-0.10.015.74 E-41.9K preliminary

-0.25/-3.75

-0.25/-1.0

0/-0.75

 

 

4.7 E-4

TOSCA

-0.17

 -1.0

-0.1

0.02

4.77 E-4

CERN 2016/10/05

Marco Statera for the LASA group4

requirement: sum of components < 100 UNITS ✓good

agreement between simulation and measurement but B9

Slide6

SIMULATED B9

CERN 2016/10/05

Marco Statera for the LASA group

5

Slide7

8POLECERN 2016/10/05

Marco Statera for the LASA group

6

6P

4P

12P

10P

8P

designed

procurement

ongoing

test coil

produced

Slide8

8poleCERN 2016/10/05

Marco Statera for the LASA group

7

f

320

183

coil

Slide9

ELECTRICAL CONNECTIONS

CERN 2016/10/05

Marco Statera for the LASA group

8

two

printed

boards

double

layer

4 mm

pathupper layerlower layer

Slide10

CERN 2016/10/05

Marco Statera for the LASA group

8POLE COILS

9

DURATRON

wire

support

1 standard

2

machined

3 coils

cured

M08-01M08-02M08-03the coils are good, we will test M08-01 (full core) and proceed with the production

Slide11

10POLECERN 2016/10/05

Marco Statera for the LASA group

10

§

6P

4P

12P

10P

8P

preliminary

design

procurement

started

Slide12

10POLEelectromagnetic design:

preliminary

, to be

optimizedBTS2 technologymolds for coils: procurement ongoing

starting the procedure to acquire the

mechanics (1Q-2017)

CERN 2016/10/05

Marco Statera for the LASA group

11

Slide13

NEXT STEPS

IV

-2016test 8pole test coils thermal cycletraining tbdproduction of 8pole coils

10pole final design

I-20178pole assembly and test

production of 10pole coils

10pole

procurement

CERN 2016/10/05

Marco Statera for the LASA group

12

Slide14

CONCLUSIONS

6pole

magnetic

measurement ✔8poleprocurement

ongoingnew

electrical connection test coils (DURATRON)

10pole

preliminary

electromagnetic

design

starting