of Unreinforced Masonry Parapets The University of Auckland New Zealand Host Mentors Dmytro Dizhur amp Liam Wotherspoon UCSD Mentor Lelli Van Den Einde July 10 th 2013 ID: 360222

parapets christchurch table tests christchurch parapets tests table shake pull data mortar retrofits out

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Securing" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Securing

of Unreinforced Masonry Parapets The University of Auckland, New ZealandHost Mentors: Dmytro Dizhur & Liam Wotherspoon UCSD Mentor: Lelli Van Den EindeJuly 10th 2013

Anthony Adams Slide2

Experiment

Multiple two leaf parapets, secured using common retrofits of the area and experimentally validated retrofits, will be dynamically loaded on a Shake table to provide experimental data of their effectiveness in a dynamic setting.Test both experimentally validated and industry accepted retrofits for URM parapets to see which methods are the most effective. GoalsSlide3

Securing of URM parapets

Initial “pull-out” laboratory tests were determined to be inconclusive due to our testing procedure. We have devised a new plan of action for testing and are currently preparing the brick specimens for more accurate and controlled static and dynamically loaded “pull-out” tests. I also had my first exposure to the Data Acquisition system that we will be using during the Parapet testing Initial data processing of the output from the “pull-out” tests. Slide4

Christchurch

We flew down to Christchurch to collect mortar samples from some of the remaining Unreinforced buildings from the time period. Looked at retrofitted parapets that survived the quake. Visited Erickson’s Bridge that he is modeling which is currently under construction. Got to see what is left of the city and the remaining damage around town. AMAZINGSlide5

Next Week

Static and Dynamic Pull Out tests will be completed and analyzed. I will be inducted at the new lab at east campus where the shake table will be built.Finalize accelerometer placement along the parapet and base of the shake table.Start the building process for both the parapets and the shake table. Slide6

Howick

Golf CourseSlide7

Christchurch (Collecting Samples)

Fort Jervois, Mortar, concrete, and Stone SamplesChurch Near CBD of Christchurch, Collecting MortarSlide8

Christchurch

Christchurch Cathedral DamageAvondale Road bridge(Erickson’s Modeling Project)