/
Revision 10 - Released September, 2006 Revision 10 - Released September, 2006

Revision 10 - Released September, 2006 - PDF document

natalia-silvester
natalia-silvester . @natalia-silvester
Follow
377 views
Uploaded On 2017-11-26

Revision 10 - Released September, 2006 - PPT Presentation

Start at the center of the room perimeter alcoves offs Prima Marbleized and Standard Marbleized Floor Tiles are normally quarter turned It is e floor under normal occupied lighting conditions ID: 609812

Start the center

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Revision 10 - Released September, 2006" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Revision 10 - Released September, 2006 Page 3 of 4 RT INST-100906 . Start at the center of the room perimeter, alcoves, offs: Prima Marbleized and Standard Marbleized Floor Tiles are normally quarter turned. It is e floor under normal, occupied lighting conditions. Only Johnsonite's #965 Acrylic, #996 Two-Part Epoxy or installing Johnsonite's Rubber Flooring System.Epoxy in areas that may have excessive surface water exposure (i.e.: shower and locker rooms, therapeutic, swimming pool, and other similar areas). After proper mixing (epoxy and urethanes only), apply adhesive to subfloor. See adhesive label for mixing directions, trowel recommendations, and subfloor porosity conditions. Remove wet adhesive at seams or off tile surface with a cloth dampened with rubbing alcohol or water. : Epoxy and Urethane adhesives must be removed when wet. The removal of dried adhesive can result in tile damage. the adhesive out between the seams. Work off the tile sudhesive. (See exception 1a above regarding Prima Marbleized time one hour later. Inspect the floor 2-1/2 hours after installation and roll a third time, if necessary. Use a hand Inspect floor surface, especially seams, and remove any Avoid all traffic for at least 12 hours and only limited light not allow roller traffic on the floor until after a minimum of 72 hours. Avoid cold or excessive heat, including