May 25 2015 Route Map IrelandFrance Subsea Cable Limited incorporated in January 2015 to construct 565 km repeatered subsea cable IFC1 from Cork Ireland to Lannion France Entire system buried 1015m to reduce risk of cable break ID: 461429

cls fibre networks terrestrial fibre cls terrestrial networks carriers ireland cork subsea cable ifc dark dublin network paris france international cables points

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Cork at a Crossroads" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Cork at a CrossroadsMay 25, 2015Slide2

Route MapSlide3

Ireland-France Subsea Cable Limited incorporated in January 2015 to construct 565 km. repeatered subsea cable (IFC-1) from Cork, Ireland to Lannion, France.Entire system buried 1.0-1.5m to reduce risk of cable break.

Complex installation due to presence of 18 in-service cables, 45 out-of-service cables and one pipeline.

Ringaskiddy CLS linked to Cork Internet Exchange (CIX) which will be primary PoP. Dark fibre connections available to Dublin

via

multiple, redundant routes.

Lannion CLS linked to Paris hubs via dark fibre.

Project OverviewSlide4

Provides low-latency connectivity for Cork/Galway DCs to the continent and European DCs.Enables Dublin-based data centres and carriers to bypass London Docklands and Slough/Reading choke points enroute to continental Europe

Physical resiliency enhanced - lessened dependency on Northern Wales terrestrial route

Permits large Irish data centres to purchase bulk bandwidth (dark fibre) and condition networks to specific requirements

Provides interface at Cork with other subsea networks for European-bound traffic without touching UK

.

Rationale for IFC-1- Three Ways OutSlide5

Ireland ranks ninth in the world for private international network capacity with 1.4% market share

which will rise to 2.2% market share in 2020.

International

network demand is experiencing significant growth with five-year CAGR forecasted to grow at 50% vs. worldwide rate of 37%.

Projected Irish 2020 demand in excess of 60 Tbps.

International bandwidth price deflation of 21%-23% on most routes.Migration

from linear connectivity to mesh networks on international routes as a result of price deflation.

Bandwidth is BoomingSlide6

IFC-1 cable will contain six fibre pairs, each capable of transmitting 15Tbps. Total capacity at current technology is 90 Tbps.Passive subsea repeaters enable upgrades to 400G and beyond.

Cable engineered to ITU G. 654 standards with N+1 power supplies at each CLS and ability to feed entire network from either terminal.

Network design life of at least 25 years.

System engineered for five-nines network availability factor.

IFC-1 will be monitored

24/7

Technical CharacteristicsSlide7

Ireland Landing PointSlide8

CLS LocationSlide9

Ringaskiddy CLS located on eNet fibre with just 1.8 km of additional fibre required to create ring.Two other carriers nearby to provide link from CLS to CIX.Multiple dark fibre suppliers available between CIX and

Dublin as

well as at 10G and

100G wavelengths.

Carriers willing to provide annual leases or IRUs.

IFSC will create end-to-end solution but many Dublin-based clients will prefer to deal directly with Irish carriers to enhance existing mesh networks.

Ireland-Terrestrial ConnectivitySlide10

Multiple fibre paths from Lannion to Paris available due to presence of other subsea cables.All links go through Rennes node then either north through Caen to Paris or south through Nantes then east to Paris.

More direct route being built from Rennes to Paris which could reduce backhaul distance from 865 km to 605 km.

IFSC able to negotiate multiple dark fibre IRUs or monthly leases to drop off point at FranceIx or Telecity or Equinix from four different carriers.

Alternative terrestrial links from Lannion to major Middle East and Asian cable landing stations at Marseille, France via Bordeaux.

France - Terrestrial ConnectivitySlide11

Protected near shore landing points – shortest unobstructed direct route to Europe, skirting Isles of Scilly.Strong terrestrial networks – strong technical competency

Physical separation from Dublin’s electrical and telecommunications infrastructure.

Colocation with lowest latency cables serving North America (Hibernia Express) and Asia (Arctic Fibre).

Ireland’s attractive tax structure serves as base for North American and Asian companies seeking access to EU markets.

Ideal location for high-frequency trading networks and payments processing facilities.

Lower DC real estate and personnel costs than in the capital.

Why Land at Cork?Slide12

2014Q4 - Market feasibility studies completed

- Desktop study completed and revised - Landing points refined and identified

2015Q1 - Terrestrial routes and pricing secured

- Turnkey supply contract negotiated

2015Q2 - Environmental applications for marine survey and landings filed

- Completion of financial modelling and investor negotiations

- Ongoing marketing efforts with key anchor tenants2015Q3 - Completion of Marketing “Open Season” pre-sales - Execution of supply contract – start full marine surveys

2015Q4 - Manufacturing of wet and dry plant underway

2016Q2 - Near shore preparations and CLS installations underway

2016Q3 - Marine installation and inspection

- Ready for Commercial Service

Implementation TimetableSlide13

Chief Executive Officer - Douglas Cunningham – has 41 years experience in broadcasting and telecommunications finance and has spent last 17 years developing subsea systems serving Bermuda, Brazil, Venezuela, Cayman Islands, US Virgin Islands, St. Lucia, Barbados, Trinidad as well as the Arctic Fibre system (under construction).

Director – David Quirk -

founded DNM Analytics in Dublin 15 years ago and serves as its Chief Executive Officer. DNM Analytics is an Irish-based consulting firm providing data management and customized business analytics services to global clients in partnership with Oracle, SAP, Microsoft and Amazon Web Services. He is also Chairman of the Ireland Canada Business Association.

Director – Mike Cunningham –

was a successful hedge fund analyst before entering telecommunications as the founder of several start-up carriers serving clients in Canada and the Caribbean. He is currently Chief Executive Officer

of Arctic Fibre.

Directors and ManagementSlide14

Regulatory, Legal, Carrier Matters: Doug Cunningham

1 416 613 6263

doug@ifc-1.com

Technical Matters: Wayne Nielsen 1 703 444 2527 wnielsen@wfnstrategies.com

Contact Points