FXI Front End Overview for IRR FXI Front End Overview for IRR

FXI Front End Overview for IRR - PowerPoint Presentation

olivia-moreira
olivia-moreira . @olivia-moreira
Follow
413 views
Uploaded On 2018-10-09

FXI Front End Overview for IRR - PPT Presentation

Gregory Fries NSLSII Accelerator Division Project Engineer FXI IRR October 18 2017 Outline Background Return to Operations Scope Machine Status amp Operating Schedule Front End FE Details ID: 686987

front amp photon safety amp front safety photon shutters radiation commissioning shutter fxi beam current nsls complete added operations installed collimator survey

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "FXI Front End Overview for IRR" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

FXI Front End Overview for IRR

Gregory Fries, NSLS-II Accelerator Division Project EngineerFXI IRROctober 18, 2017Slide2

Outline

BackgroundReturn to OperationsScopeMachine Status & Operating ScheduleFront End (FE) DetailsFront End Layouts, Installation & ReadinessRadiation SafetySource & FE Commissioning PlanConclusionSlide3

Background

FXI (18-ID) is a damping wiggler (DW) beamline

Operation of damping wiggler needed for SR operation (emittance

)

Requires bending magnet photon shutter to be open

Source & partial front end installed during NSLS-II project

Reviewed in Dec. ‘14 as part of Limited Scope Readiness review of NSLS-II Front Ends and Insertion Devices 08-ID and 18-IDIn use since the start of operationsInstall of remaining of front end components in Aug. ‘17Including ratchet wall collimatorNo changes to source or straight sectionSlide4

Return to Operations

Tailored review plan created to return to

operations on Sept. 5

Requirements to return to operations:

Ray tracing released

Shielding & radiation safety components installed & under configuration control

Vacuum bakeout completeMechanical survey completeWater flow verifiedEPS verifiedSlits LOTO’d open & shutters LOTO’d closedPresented to Radiation Safety Committee on Aug. 22

Conducted 18-ID front end readiness for operation review on Aug. 29

Phase 1 radiation survey upon restart of operations

Operating current slowly ramped upSlide5

Scope

FXI Front End

Insertion device (ID) front end

Many aspects already reviewed in Aug.

The photon & safety shutters are wired into PPS & EPS

FXI Source (DW) not explicitly included

May need reference information when reviewing front end and beamlineSlide6

Machine Status & Shutdown Schedule

Installation, testing & commissioning

dependent upon operating schedule

NSLS-Il beamline operations in process

Three machine shutdowns per year (4-5 weeks each)

Dec/Jan

April/MayAugustTypically a two-day maintenance period every third week & a studies period every week during operationsMinor installation & testing during maintenance daysInstallation completed during Aug ‘17 shutdownCommissioning scheduled for Oct/Nov ‘17Slide7

Operating Schedule

Shifts for FXI CommissioningSlide8

Front End Details

A front end delivers the photon beam to the beamline while controlling the sizes of both the synchrotron and bremsstrahlung radiation fans.

The

fixed mask shadows the vacuum chambers of downstream

collimators

and safety shutters for beam deviations controlled by active

interlock.Lead collimators trim the Bremsstrahlung fan exiting to beamlines.Photon shutter is used to stop the photon beam in order to protect the uncooled safety shutters.The safety shutters block the bremsstrahlung radiation from exiting through the ratchet wall collimator chamber opening.The photon shutter & safety shutters are locked out. (Centrally controlled LOTO)FXI is same design as NSLS-II Project, ABBIX, & NEXT front endsSlide9

Front End Layout

Beam

Ratchet Wall

Collimator (added)

Safety Shutters (added)

Fixed

Mask (new body)

Collimator

1

(added)

X-Y

Slits (added)

X-ray Flag (added)

Photon

Shutter (new body)

Fast Gate

Valve (added)

Collimator

2 (added)

Slow Gate

Valve

Courtesy of C. Amundsen

BM Photon ShutterSlide10

Radiation Safety & Top-Off

Radiation safety components:

Exit absorber

Fixed mask

Burn thru flanges #1 & #2

Collimators #1 & #2

Safety shutters #1 & #2Ratchet wall collimatorTop-Off components:Exit AbsorberFixed maskCollimator #2Credited controls include all shielding & PPS componentsRemoval or modification of any device under configuration control

r

equires

an

approved

PS

safety

s

ystem

w

ork

p

ermit Slide11

FXI Front End Installation

As part of NSLS-II project in ‘13

Installed exit pipe & bending magnet photon shutter

Installed original fixed mask & photon shutter

August ‘17 Shutdown

Installed ratchet wall collimator & safety shutters

Replaced fixed mask & Photon shutterInstalled slits, upstream collimators & flagPulled & terminated cablesPlumbed DI water & compressed airTied-in front ends into EPS & PPSBaked & final surveyed front endLocked out shutters until IRR approval

Sept. ‘17

Final integrated testing & labelingSlide12

FXI Front End

Actions

Ray

tracings complete.

Design

drawings complete

.Vacuum system complete.Final survey complete.

Devices under configuration management.

Integrated testing complete.

Water flow measured.

Travelers complete.

Top-off analysis complete.

EPS verification.

PPS verification.Slide13

Commissioning Plan

Commissioning scheduled for Oct./Nov. ‘17

Commissioning

studies time

has been reserved

Commissioning effort will include staff from Operations, Physics, Insertion Device, Front End, and Diag. groups

Software controls & tools already developed and verified during NSLS-II beamline commissioningProcedures released for ID & FE commissioning sequence and radiation survey planFE same design at NSLS-II Project, ABBIX, & other NEXTSlide14

Front End Commissioning

Photon shutter & safety shutters remain locked out

Beam current

below 2 mA

Verify orbit and characterize/correct

lattice

Verify active interlock functionalityGeneral radiation surveysAlign the photon beam using flagRecord slit positions with respect to beam centerCondition vacuumRadiation survey (fault study)Hold point – before increasing currentSlide15

Beam Current Increase Plan

Obtain authorization to increase current to 120 mA Photon shutter & safety shutters remain locked outEvaluate and record current machine state

Gradually increase current

Verify

active interlock system

being engaged

Monitor and verify orbit, tunes, lattice, vacuum, temperatureHold Point – Radiation surveyPhase 1 (slits open) – already completePhase 2 (slits closed)Phase 3 (fault studies) – already completeBeam conditioningRepeat to allowable currentSlide16

Conclusion

FXI front end installed & tested

Radiation components under configuration control

Assembly drawings, ray tracings, procedures, & travelers are available

Photon shutter & safety shutters are locked in the down position

Front end is ready for commissioning

No self-identified pre-startsCommissioning experience & prepared commissioning procedures from previous front ends