L4 BCC 1 Sep 2011 F Roncarolo U Raich LSoby JTan CZamantzas F Lenardon CVuitton G JFocker General Remarks Overview DESIGN Completed for almost all instruments ID: 556534

sep bcc roncarolo 2011 bcc sep 2011 roncarolo raich monitors monitor beam sem test line laser type design stripping

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "LINAC 4 TL diagnostics" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

LINAC 4 TL diagnostics

L4 BCC – 1 Sep 2011

F. Roncarolo, U.

Raich

L.Soby

,

J.Tan

,

C.Zamantzas

, F.

Lenardon

,

C.Vuitton

, G-

J.FockerSlide2

General Remarks / Overview

DESIGNCompleted for almost all instruments (

m

ost of TL devices == L4 monitors)

Basically all devices will be tested at 3 MeV test stand Open issuesNumber of devices and locations: need frozen layoutOnce done: details about interconnectionsProfile monitor in dump line (see later slide)BLM detector type (see later slide)Equipment of TL with station for laser stripping R&DSCHEDULE / BUDGETPresent advancement/plans/budget for design, fabrication, cabling and installation under controlBI Linac 4 review (with reviewers panel) on October 18th (tbc and announced in the next few days)

F. Roncarolo, U. Raich

L4 BCC - 01 Sep 2011

2Slide3

Diagnostics Park

L4 BCC - 01 Sep 2011

3

F. Roncarolo, U. Raich

MONITOR TYPE

Quantity

L4T LINE

BCT

7

BLM

6

SEM GRIDS

3 (H+V)

BPM

12

BSM

1L4Z LINEWS or SEM GRID1 (H+V)BCT1

3 BTVs now replaced by 1 WS or SEM GRID (H+V)

From Layout DB 31-08-11Slide4

Beam Current Transformers BCT

L4 BCC - 01 Sep 2011

4

F. Roncarolo, U. Raich

Copy of LEBT monitors100 mm diameterUp to 200 MHz sampling rateAcquisition sync. with the distributor, to know how much beam current goes to each PSB ringElectronics ready for such optionNeed FPGA code update (likely not possible before LS1)In generalDo we agree on the number of devices?Foreseen by BI : 6, Layout DB: 7Slide5

Beam Position Monitors (BPM)

Shorted strip-line detectorsSame design for all L4 BPMsDiameter for TL monitors: 100 mm, L = ~250mm

Electronics with down-mixing of 22 MHz

 maximum sampling rate 4x22=88 MHz

50 ns pulse length beam position measurement foreseen by the design (noise levels to be investigated)For TL: is # of monitors and location frozen ?At the moment of installing TL BPMs: will it be possible to change the 17 old TL monitors (after BHZ20)? F. Roncarolo, U. RaichL4 BCC - 01 Sep 20115

J. TanSlide6

Profile Monitors (SEM Grids)

Same design as all L4 monitors – will require reduced pulse length (100us)

Mechanics

~ on schedule, 140 mm flange-to-

flange (PIMs type)New electronics under development, to be tested on 3 MeV test stand200 kHz ADC band (5 us)Wire polarizationNew connectors and cables: 32 channels in 1 cableF. Roncarolo, U. RaichL4 BCC - 01 Sep 20116Is this up to date? Once frozen: verify details of flange connectionsSlide7

Dump Line profile monitor

3 screens option abandoned

Additional

monitor not

included in BI plansWhat are requirements?SEM Grid or WS ? Spare L4 SEM gridsingle shot meas24 wires fixed pitchSpare L4 WSmultishot meas40 um resolution (wire diam.)SEM grid on stepping motor

Not foreseen by BI (can recuperate test bench device?)

Not single shot but can improve resolution with less shots than WS

new

SEM with variable resolution

(by variable rotation

w.r.t

. beam axis

)not foreseen  design new or try to recuperate L2 type deviceWhen rotation != 90 deg: during single shot the sampling is done at different longitudinal locations

F. Roncarolo, U. Raich

L4 BCC - 01 Sep 2011

7Slide8

Beam Loss Monitors (BLM)

F. Roncarolo, U. Raich

L4 BCC - 01 Sep 2011

8

W.Vigano, C. ZamantzasAuto-gain switchingAuto-gain switching-Integrated detector signal sampled every 2 us-From pA

to mA detector output current

2 us : sampling the integral

Electronics under development, in parallel to L4

linac

and PSB new electronics

Special

screened cables to

minimize EM noise

(problem in other world-wide

linacs

)

TL cable installation on stand-by while waiting for latest beam optics and BLM location sEvery second BLM location is equipped with a spare cable to host an additional monitor if needed Choice of detector (Ionization chamber, chamber type, or possibly other detectors) under discussionWide dynamic range expected !Slide9

Laser Stripping R&D

Aim at profile + emittance measurement

For testing @

Linac

4At least 1 stationY chamber @ dipoleEstablish laser location and optical line pathIf there will be no intermediate dump between 1st bend and BI line: can test only laser stripping and profile meas (no emitt. meas) with a station after PIMSF. Roncarolo, U. RaichL4 BCC - 01 Sep 2011

9

LASER stripping

LASER stripping

H0 monitor

H0 monitor

H0 monitor

Possible

locationsSlide10

SOFTWARE

BCT – BPMLow level completed or well on the way to completionNeed OP GUI development

All will be tested at 3 MeV test stand

SEM grids

Low level and OP GUI done, being used at test standBLMDefinition of the memory map CPU in readout simulation mode Start development of driver, RT software, etc.First version of memory map (LINAC4) - end of SeptemberF. Roncarolo, U. RaichL4 BCC - 01 Sep 201110Slide11

SPARE

F. Roncarolo, U. Raich

L4 BCC - 01 Sep 2011

11Slide12

F. Roncarolo, U. Raich

L4 BCC - 01 Sep 2011

12Slide13

F. Roncarolo, U. Raich

L4 BCC - 01 Sep 2011

13