/
Seminar/Workshop on the Implementation of the Seminar/Workshop on the Implementation of the

Seminar/Workshop on the Implementation of the - PowerPoint Presentation

pasty-toler
pasty-toler . @pasty-toler
Follow
419 views
Uploaded On 2016-03-30

Seminar/Workshop on the Implementation of the - PPT Presentation

Performance Based Air Navigation Plan for the SAM Region SAMANIPPB Management of Navigation Service Personnel Competence Nohora Arias F ROMETSAM Lima Peru 9 to13 May 2011 OUTPUT ID: 271654

air navigation personnel atm navigation air atm personnel training operational sam trained based plan performance service implementation competence 2011 peru quality duly

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Seminar/Workshop on the Implementation o..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Seminar/Workshop on the Implementation of the Performance Based Air Navigation Plan for the SAM Region(SAM-ANIP-PB)

Management of Navigation Service Personnel Competence

Nohora Arias F. (RO/MET/SAM)

Lima - Peru,

9 to13 May 2011Slide2

OUTPUT

ADD

VALUE

TASK

HOW

CUSTOMER

MECHANISMS

Competence

Training and awareness

Infrastructure

Budget

Work environment

Attitude

Peru, May 2011 Implementation of the Performance-Based Air Navigation Plan - SAM

WITH WHAT

INPUT

WHO

PROCESS

BOX

CONTROL

MECHANISMS

2Slide3

CONTROL

MECHANISMS

RPO

24

:

MANAGEMENT OF NAVIGATION SERVICE

PERSONNEL COMPETENCE

Safety

Reinforces safety

Environmental protection and development of air transport

Information available with a level of quality that is appropriate to the requirements

Personnel duly trained as instructors in the ATM operational concept

Personnel duly trained for managing the ATM operational concept

Increases situational awareness of the personnel

Provides for quality air navigation services

Metrics

Number of air navigation service personnel trained in the ATM Operational Concept

Number of CATCs that participate in the training programme.

COMPONENT

TASKSSTART-ENDRESPONSIBLESTATUS

AOM

AO

AUOATMSDMDCB

CM1.

Develop the training programme for air navigation service personnel to respond to the new challenges, taking into account ICAO documentation.

2012-2013

Regional Project

Valid

2.

Follow up the activities of the New Generation of Aviation Professionals (NGAP) Special Team and implement the results

2012

-2016StatesValid3. Prepare a programme for instructors on training, planning and the ATM Operational Concept2013-2014Regional ProjectValid4. Prepare guides for training, planning and the ATM Operational Concept2013-2014Regional ProjectValidRelationship with GPIsThe updating and training of aeronautical personnel is a cross-cutting issue for all ATM system areas

Peru, May 2011 Implementation of the Performance-Based Air Navigation Plan - SAM

3Slide4

CONTROL

MECHANISMS

Safety

Reinforces safety

Environmental protection and development of air transport

Information available with a level of quality that is appropriate to the requirements

Personnel duly trained as instructors in the ATM operational concept

Personnel duly trained for managing the ATM operational concept

Increases situational awareness of the personnel

Provides for quality air navigation services

Metrics

Number of air navigation service personnel trained in the ATM Operational Concept

Number of CATCs that participate in the training programme.COMPONENT

TASKS

START-END

RESPONSIBLE

STATUS

5.

Strengthen Civil Aviation Training Centres (CATCs) of the Region.

2012-2014StatesValid

6.

Implement courses on training, planning and the

ATM Operational Concept

2013-2016

States

Valid

7.

Monitor the training and updating of air navigation personnel

2016-2018+

GREPECAS

StatesValid RPO 24: MANAGEMENT OF NAVIGATION SERVICEPERSONNEL COMPETENCE

Peru, May 2011 Implementation of the Performance-Based Air Navigation Plan - SAM

4Slide5

MANAGEMENT OF NAVIGATION SERVICE PERSONNEL COMPETENCE

5

QUESTIONS?

Peru, May 2011 Implementation of the Performance-Based Air Navigation Plan - SAM Slide6

6

THANK YOU