Technical information of Technical information of

Technical information of - PowerPoint Presentation

pasty-toler
pasty-toler . @pasty-toler
Follow
402 views
Uploaded On 2016-04-07

Technical information of - PPT Presentation

Project 1 Equipment Type Manufacturer Power o utput Last outage N ext outage Gas turbine MS 6001FA GE 70MW May 2011 66535 operational hours HGPI 74535 operational hours ID: 275752

operational hours major overhaul hours operational overhaul major steam bar layout 000 5kv mva generator total technical output hlp number hrsg shutdown

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Technical information of" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Technical information of Project 1

EquipmentTypeManufacturerPower outputLast outageNext outageGas turbineMS6001FAGE70MWMay 201166.535 operational hours (HGPI)74.535 operational hours (CI)Steam turbineDK 080/280MAN26MWNov 2012 70.933 operational hours (Major Overhaul)120.000 operational hours (Major Overhaul)GeneratorT24370GEC Alstom113MVA (10,5kV)Sept 200643.439 operational hours (Major Overhaul)Planned in 2013(Major Overhaul postponed due to suspention of operation)HRSG DBMA (Spain)HP steam: 540°C / 106 bar / 110t/hLP steam: 300°C / 7 bar / 20 t/h

1

Output:

95MW

el

, 90MW

th

Total operational hours:

72.182

Number of Shutdown:

230

Commissioning: 31

th

of Jan in 2001

Equipment layout: single

shaft

layout

(GT-Generator-ST)Slide2

Technical information of Project 2

EquipmentTypeManufacturerPower outputLast outageNext outageGas turbineH25 AXHitachi30,1MWMay 2012 32.990 operational hours(HGPI)50.490 operational hours (CI)Steam turbineSST 600/VE40Siemens22,6MWNov 201125.681 operational hours (Forced Major Overhaul)74.000 operational hours (Major Overhaul)GeneratorSGen5-110A-4pSiemens37 MVA (10,5kV)29 MVA (10,5kV)May 201230.215 operational hours (Minor overhaul)96.000 operational hours (Major Overhaul)HRSG Steam Gen 6AalborgHP steam: 540°C / 94 bar / 99t/hLP steam: 310°C / 10 bar / 3 t/h

2

Output:

47MW

el

, 64MW

th

Total operational hours:

36.114

Number of Shutdown:

51

Commissioning: 17

th

of July in 2007

Equipment layout:

2

shaft

layout

(each turbine has own generator)