Irrigationamp Electricity بسم الله الرحمن الرحيم Republic of Sudan 2016 2019 1 Proposed Renewable Energy Projects for Promotion General Information Total Installed Capacity 2015 3180 ID: 551281
Download Presentation The PPT/PDF document "Ministry of Water Resources" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Ministry of Water Resources
Irrigation&
Electricity
بسم الله الرحمن الرحيم
Republic of Sudan
2016 - 2019
1
Proposed
Renewable
Energy Projects for Promotion Slide2
General Information Total Installed Capacity 2015 =3180
Demand– 2015 =11793GWHMaximum demand = 2600 MW
Number of Customers2014 . =2,250000Energy Access up to now = 45 % Average Annual Growth = 14 % 2Slide3
2016
2017
2018
2019
2020
2021
2022
2023
Moderate
2,671
3,317
3,563
3,768
3,9644,1724,3854,589Base 3,0103,6873,9924,2734,5354,7995,0535,302High3,3564,1364,5374,8925,1905,4725,7355,985202420252026202720282029203020314,7915,0345,2775,5165,7616,0086,2576,5105,5375,7976,0616,3296,5976,8687,1457,4276,2286,5156,8087,1067,4117,7228,0398,361
Forcast
up to
2031 Slide4
Graph of
forcast
up to 2013
Slide5
Renewable Energy Projects
The main objective of these projects is to supply Sudan National Grid with clean, sustainable, eco-friendly energy with low operating cost.
5Slide6
6
Wind Power ProjectsSlide7
Location: Tokar
south of Port Sudan, Red Sea State. Generation Capacity: 180MWStatus: wind measurement
ongoing. Feasibility study : ongoing.Funding : Needed.Red Sea wind farm
7Slide8
Location: Dongla
North State. Generation Capacity: 200MWStatus: wind speed 7.2 m/sec
60 m above ground level. Feasibility study : Available.Funding : Needed.Dongl
a wind farm
8Slide9
Nyala
wind farmLocation: Nyala.
Capacity: 20MW. It will be implemented in two phases, 10 MW each.
Annual average wind speed: 7.9 m/s.
Feasibility study: availableLand: Available
.Fund : Needed
9Slide10
Wind Atlas
Average wind speed 4.2
– 8.1 meter/second at 80 meters above ground level (agl)
Areas with highest wind speed:Red Sea
Northern Sudan (Dongola)Jabel Marra Mountains in western Sudan
10Slide11
Solar Power Projects
11Slide12
Khartoum Photovoltaic Power Plant
Capacity: 10 MW
Location: KhartoumFeasibility Study available &
Techincal specs avaible.Funding : Needed
12Slide13
Nyala
Photovoltaic Power Plant
Capacity: 5 MW
Location: Nyala
Feasibility Study : available.Land available .
Funding : Needed
13Slide14
Al
Fashir
Photovoltaic Power PlantCapacity: 3 MWLocation:
Al Fashir Feasibility Study : available
Funding : Needed
14Slide15
Al Geniena
Photovoltaic Power Plant
Capacity: 2 MWLocation: Al Geniena
Feasibility Study : available
Funding : Needed
15Slide16
Solar Home System
From 2013 - 2031 Capacity 50 w- 100 w- 200w
For areas which will not be covered from grid till 2031Number of houses planned to be covered 10000
16Slide17
Solar Atlas
Average daily solar irradiation: 5.8 – 7.2
kWh/m2 The solar radiation increases in northern and west-northern areas and decreases towards the south
17Slide18
Small Hydro Projects
The idea is to use the channels of agricultural projects to build small hydro units.Channels of Aljazeera Scheme an Alrahad were selectedThe potential is 63 MWFeasibility study: NeededFund: Needed.
18Slide19
Electricity from WasteThere is potential for generation of electricity from waste
Initial information show that 50 MW can be generated at Khartoum area and 3 MW can be generated at six townsFeasibility Study: Needed Fund: needed
19Slide20
Thank you for Attention
20