/
S a w S a w

S a w - PowerPoint Presentation

sherrill-nordquist
sherrill-nordquist . @sherrill-nordquist
Follow
374 views
Uploaded On 2016-07-08

S a w - PPT Presentation

y e r E n v i r o n m e n t a l C h a n g e s Mechanical Engineering Department Capstone 20112012 Amy R Dan H Colby C Brittany P Richard G 1 Overview Current Situation ID: 395459

energy system power exhaust system energy exhaust power control motor building fume cost work data information air hoods fan

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "S a w" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Sawyer Environmental Changes

Mechanical Engineering DepartmentCapstone 2011-2012Amy R. Dan H. Colby C.Brittany P. Richard G.

1Slide2

OverviewCurrent SituationPossible ChangesOutcome & ImplementationConsiderationsConclusion2Slide3

At Present:Primary concerns:Work EnvironmentComfortPerformanceEfficiencyMoney ResourcesEquipment 3Slide4

4Slide5

Why is it so inefficient?Current system installed in the 1980’s Pneumatic controls do not have feedback and runs 24/7.Building has a fan and damper system. Dampers open or close depending on demand.System power consumption is constant regardless of demand. When the system is on it is running at full power. 5Slide6

The system fights itselfHeat is on in the summer therefore air conditioning runs. For example in the month of June it was found that the same amount of money was spent on electricity and natural gas. Shown on graph in slide 4 as $50.00 per day. 6Slide7

Proposed SolutionReplace motors in air handling units. Install a variable frequency drive to improve control and motor efficiency. Most of the system remains in place to minimize expense and limit work interruptions.A variable speed drive involves electrical components that quickly respond to conditions to provide proper flow.The system would then control the speed that the fan moves.Better temperature control, with less energy used by the fan.7Slide8

MotorTeco-Westinghouse Motor compatible with Yaskawa VFD More efficientHiggins Electric Motor Service Ordered on 12/5/118Slide9

Exhaust ConsolidationThe building exhausts from three primary air handling units.14 fume hoods each have separate exhaust systems.Fume hoods and the exhaust system are both removing energy. All exhaust systems need to connect to a control.Combining the exhaust of 14 fume hoods make it easy to measure the mass flow rate through the system, this would reduce the power needed to run the fume hood exhaust system.9Slide10

Other Energy UsageThe ice core freezers are a necessary draw of energy.A power measurement system is planned to monitor power consumption from the ice core freezer.The system would be installed on Friday the 18th by a University electrician and Anna Demeo. This system would give immediate feedback on improvements.10Slide11

For the FutureEnergy audit will be performed by Cordjia Capital Projects Groups.Our team will collect a month of data on energy needs of the building.Information on the cost of the new equipment including initial purchase, installation, maintenance. The return on the investment will be obtained.More information will be found on the Bangor Hydro grant. 11Slide12

DeliverablesData sheets with expected cost, savings, and specs on all proposed changes.Live information on the cooler’s energy use for the building.Data for winter energy use in SawyerIndoor Pest Repellent: Electronic.12Slide13

Non-DeliverablesUnfortunately we cannot have:Windows that openIndividual thermostats for rooms or areas.Pressure requirements for lab vs. non lab areas. Better temperature control maintains stable and efficient work place.13Slide14

Conclusion Next step is to install the energy monitoring system.Calculations for cost savings and research into variable frequency drives is our focus in the coming weeks.Create a solid cost proposal we would like to meet again with you and Facilities Management to go over our ideas.14

Related Contents


Next Show more