Test Programs Michele Modena DBQ Magnets and mockup under procurement 5 DBQ mockup procured and available at CERN 8 DBQ magnets under procurement with Danfysik delivery should be completed for June 2012 ID: 582138

mbq dbq procured procurement dbq mbq procurement procured lab clex modena prototype magnets modules beam 2011 test type1 module

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Procurement plan for DBQ and MBQ for LAB..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Procurement plan for DBQ and MBQ for LAB and CLEX Test Programs

Michele ModenaSlide2

DBQ Magnets and mock-up under procurement:

5

DBQ mock-up procured and available at CERN8 DBQ magnets under procurement with Danfysik (delivery should be completed for June 2012)2 Mech. Tunable PM prototype magnets procured by Cockcroft.1 (higher gradient range) will be NOT compatible with actual modules.1 (lower gradient range) will be designed to be compatible with modules (LAB and CLEX)(procurement schedule should be : 1st May 2012 and 2nd February 2013)Planning to make a new hybrid (PM + EM) design for DBQ (higher gradient range); a prototype procurement should follow.

MBQ Magnets under procurement:1 MBQ Type4 procured (actually with Stabilization Tests - Note: magnetic quality NC)1 MBQ Type1 procured (idem - idem)1 MBQ Type1 (2nd Vers.) under procurement (coils already procured, quadrants just order at DMP- Spain; magnet should be available in Spring 2012)1 MBQ Type4 (2nd Vers.) will be also procured in 2012 (coils already procured)

2

M. Modena, 31-10-2011, "2-Beam Module" WGSlide3

Modules in the lab

DBQ: 8

p

ositions to be filled, proposal:5 DBQ mock-up procured and available at CERN3 (2) DBQ magnets under procurement with Danfysik0 (1) Mech. Tunable PM prototype magnet will be procured by Cockcroft.MBQ: 2 positions to be filled. 1 MBQ Type1: available1 MBQ Type4: available

3

M. Modena, 31-10-2011, "2-Beam Module" WG

“LAB TEST PROGRAM”Slide4

Prototype modules – LAB: schedule

4

M. Modena, 31-10-2011, "2-Beam Module" WG“LAB TEST PROGRAM”

1st and 2nd DBQ available 3rd DBQ available 1 PM-DBQ proto.(Type1 and Type4 MBQ already available)(5 DBQ Mock-up already available) Slide5

Prototype two-beam modules in CLEX

DBQ: 6

p

ositions to be filled: 6 DBQ magnets under procurement with Danfysik.MBQ: 1 positions to be filled: 1 MBQ Type1 (2nd Vers.) quadrants under procurement, coils available5M. Modena, 31-10-2011, "2-Beam Module" WG“CLEX TEST PROGRAM”Slide6

Prototype modules – CLEX: schedule

6

M. Modena, 31-10-2011, "2-Beam Module" WG“CLEX TEST PROGRAM”

6 DBQ available 1 MBQ available 1 PM-DBQ available