/
Date: Date:

Date: - PowerPoint Presentation

tatyana-admore
tatyana-admore . @tatyana-admore
Follow
366 views
Uploaded On 2018-01-07

Date: - PPT Presentation

21062016 LTI Qarn Alam What happened The roustabout was working on the catwalk attaching the wire rope sling to the Topdrive from the blocks The Floor man on the rig floor lowered the wire rope slings down the vdoor and onto the ID: 620918

rope sling twisted wire sling rope wire twisted sse stored floor program employees energy aware competent date slings rig

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Date:" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript