Download Presentation The PPT/PDF document "Using HEAT in Transport for London" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Using HEAT in Transport for London
OCTOBER 2017
Presented by: Jessica Clift
Business Case Lead- Surface Transport
Slide2Use HEAT to support strategy
“Cycling in London will double over the next 10 years”
HEAT use in TfL
Past: moving vehicles quicker
Now: nicer places, improve health
Transport most important factor for determining if people will be physically active
Slide3Use HEAT to support strategy
“Cycling in London will double over the next 10 years”
HEAT use in TfL
Slide4Requiring unprecedented investment £££££££
HEAT use in TfL
Slide5Increasing cycling in London
Is that strategy a good idea for the London economy?
HEAT use in TfL
Benefit to Cost Ratio (BCR)
provides evidence that investment is good value for money for the economy
(Economic Justification)
Slide6HEAT use in TfL
£2bn
What benefits go in the Benefit: Cost Ratio?
Slide7Use HEAT in Projects
Eg
Cycle Superhighway
7
HEAT use in TfL
Calculate health benefit of the increase in cycle trips and longer cycle journeys
that occur as a result of this project. Include in project business case:Benefit to Cost Ratio (Economic justification)Discussion of benefits (Strategic justification)
Evidence to defend project from stakeholders who:
don’t think cycling is a good idea
don’t want road space to be reallocated
Slide8HEAT use in TfL
Prospective
Retrospective
Benefit right now
£2bn
Where else do we use HEAT?
£661,000
Slide9Embedding HEAT into your organisation
1) Teach your organisation about HEAT
Build understanding
Build credibility
HEAT use in TfL
Slide10Embedding HEAT into your organisation
HEAT use in TfL
2) Able to develop inputs that are robust enough for your stakeholders
Can you forecast the increase in cycle trips from your project?
Can you use target or do you need specific modelling?
Slide11Contact