/
The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical

The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical - PowerPoint Presentation

tracy
tracy . @tracy
Follow
343 views
Uploaded On 2022-02-16

The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical - PPT Presentation

Given the stringent quality requirements and advanced manufacturing processes and technologies inherent to the complexity and criticality of the components involved it is essential for organizations to integrate each specific standard into their Quality Management System with a clear understanding ID: 909582

aesq amp aerospace standards amp aesq standards aerospace quality process requirements as9145 committee design sae production ppap industry engine

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "The SAE G-22 Aerospace Engine Supplier Q..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical Committee under the SAE Aerospace Council to develop, specify, maintain and promote quality standards specific to the aerospace engine supply chain. The Aerospace Standards in the AS130XX series are intended to be used together and in conjunction with other key industry quality standards to provide a comprehensive suite of interrelated quality standards that reduce customer specifics and integrate industry best practices with aerospace engine unique elements. Given the stringent quality requirements and advanced manufacturing processes and technologies inherent to the complexity and criticality of the components involved, it is essential for organizations to integrate each specific standard into their Quality Management System with a clear understanding of how each relates to other industry standards in order to implement it efficiently and effectively. SAE G-22 AESQ Technical Committee - User Feedback

Appendix AAESQ Standard Interconnection Overview

The SAE G-22 AESQ Technical Committee welcomes and encourages every user to provide feedback with any comments, questions, and/or suggestions concerning G-22 AESQ Aerospace Standards through the following link:

Slide2

AESQ VisionTo establish and maintain a common set ofQuality Requirements that enable theGlobal Aerospace Engine Supply Chainto be truly competitive throughlean, capable processesand a culture of

Continuous Improvement

Slide3

AESQ Guiding PrinciplesSimplify & Standardize supplier requirements Build on existing industry standards

Common language for QualityStandards are simple, prescriptive & auditable

Promote standardized 3rd party training Easy to adopt within existing process/systems Deliver results rapidly, through focused activities

Slide4

Product Life Cycle & Document Interaction

AS9145 (APQP/PPAP) & AESQ Standards

AS9145 PPAP Element Timing

Design

Records

& DRA

Process Flow Diagram

PFMEA

Control Plan

Packaging,

Preservation &

Labelling

MSA

ICS

FAI

1. Planning

Initial Prod. Approval

AS9145 Key

PPAP Events

Design Release

(CDR)

End of Concept

(PDR)

Kick Off

Production Launch

AS9145

(PDP)

AS9145

APQP Phases

AS9102

FAIR

Production Process Run

PPAP

Approval

4. Product & Process

Validation

3. Process Design & Development

2. Product Design & Development

5. Ongoing Production, use and

Post Delivery Service

Production

Readiness

Review

AESQ

2

nd

Level

Documents

AS13005 – Quality Audit Requirements

AESQ

Systems

Documents

AS13007 – Supplier Management

AS13001

Delegated Product Release Verification Training Requirements

AS13004 – PFMEA & Control Plans

AS13003 – Measurement Systems Analysis

AS13002 – Inspection Frequency

AS13006 – Process Control Methods

AS13000

Problem Solving Requirements for Suppliers

- 8D

Slide5

AS13001 Standards Relationships

Slide6

AS13004 Standards Relationships

Slide7

AS13006 Standards Relationships

Slide8

AESQ WEBSITE - aesq.saeitc.org

Questions,

Suggestions

& Feedback