1920 October 2015 MPD SPD Transfer channels Status of The NICA Project p II IMeshkov JINR Dubna HV ECooler 1 Stage II Startup and FullScale Versions of the NICA Accelerator Complex Project ID: 480106

scale nica full status nica scale status full 2015 start meshkov project amp october problems channels complex stations stage

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Machine Advisory Committee for NICA" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Machine Advisory Committee for NICA

19-20 October 2015

MPD

SPD

Transfer

channels

Status of The NICA Project (p. II)

I.Meshkov

JINR

, Dubna

HV E-Cooler

1Slide2

Stage II – Start-up and Full-Scale Versions

of the NICA Accelerator Complex Project

The Problems and Tasks

I.Meshkov

NICA project Status (p. II)

NICA MAC 19 October 2015

2

ElementStatus(Start-up)Task for full-scale version

Collaborators1. Beam transfer channel Nuclotron-ColliderCDR

NoBINP, SIGMAPHI Co

2. Collider magnet & vacuum systemsFabrication

NoGSI/FAIR

3. RF-1: BB

rf

system

Fabrication

No

BINP

4. RF-2: 12

rf stations 22nd harmonicsTD (8 rf stations)4 rf stationsBINP, ?5. RF-3: 16 rf stations 66th harmonicsR&D(No)16 rf stationsBINP, ?Slide3

Stage II – Start-up and Full-Scale Versions

of the NICA Accelerator Complex Project

The Problems and Tasks (

Contnd

.)

I.Meshkov

NICA project Status (p. II) NICA MAC 19 October 2015 3

ElementStatus(Start-up)Task for full-scale version

Collaborators6. Stochastic cooling system

Fabrication(2 channels)2 channels x 2 ringsIKP FZJ

7. Electron cooling system

R&D(No)Full-scale system

BINP,

ARIE

NEC/

Fermilab

8. Feedback system

R&D

(No)

Full scale system9. NICA complex control systemFabricationFull-scale system 10. Diagnostics FabricationFull-scale set of devices Slide4

Stage III –

Polarised

Beams

The Problems and Tasks

I.Meshkov

NICA project Status (p. II)

NICA MAC 19 October 2015 4

Status: 1) Conceptual design of the scheme of the collider with polarized beams Potential collaborators: BINP2) Formulation of the experimental program and the SPD (expected at the end of the year 2015)

Thank you for your attention!