EAC MEETING DETAILS: 5th MEETING OF THE EAC
Author : myesha-ticknor | Published Date : 2025-06-27
Description: EAC MEETING DETAILS 5th MEETING OF THE EAC INDUSTRY 1 AGENDA NO ITEM NO PROPOSAL NOIAORIND2652652022 FILE NO IA J110114952006IAIII NAME OF THE PROJECT PROPONENT WITH ADDRESS SHYAM METALICS AND ENERGY LTD
Presentation Embed Code
Download Presentation
Download
Presentation The PPT/PDF document
"EAC MEETING DETAILS: 5th MEETING OF THE EAC" is the property of its rightful owner.
Permission is granted to download and print the materials on this website for personal, non-commercial use only,
and to display it on your personal computer provided you do not modify the materials and that you retain all
copyright notices contained in the materials. By downloading content from our website, you accept the terms of
this agreement.
Transcript:EAC MEETING DETAILS: 5th MEETING OF THE EAC:
EAC MEETING DETAILS: 5th MEETING OF THE EAC (INDUSTRY - 1) AGENDA NO.: ITEM NO…. PROPOSAL NO.:IA/OR/IND/265265/2022 FILE NO.: IA- J-11011/495/2006-IA.II(I) NAME OF THE PROJECT PROPONENT WITH ADDRESS:: SHYAM METALICS AND ENERGY LTD. At-Pandloi, Lapanga, Sambalpur, Orissa- 758212 NAME OF THE CONSULTANT: GLOBAL TECH ENVIRO EXPERTS PVT. LTD NABET REGISTRATION NO.: NABET/EIA/2023/IA0066 VALIDITY: upto 6th November, 2023 1 2 Link: BRIEF INFORMATION LOCATION MAP 3 GOOGLE EARTH IMAGE OF PROJECT SITE 4 Link: TOPOGRAPHICAL MAP 5 Link: 6 LAND ALLOTTED/ACQUISITION STATUS PREVIOUS EC DETAILS 7 8 COMPLIANCE STATUS OF EXISTING UNIT The Site Visit was done by IRO, MoEF&CC on 12.08.2021, the compliance to observations made by IRO was submitted on 08.09.2021. Certified closure Report issued by IRO dated. 12.09.2021 Vide File No. 101-258/EPE/1120. 9 Cont….. 10 Cont…. ENVIRONMENTAL SITE SETTINGS 11 EXISTING & PROPOSED UNIT CONFIGURATION WITH CAPACITY IN TPA 12 Cont…. 13 PLANT LAYOUT 14 Link: RAW MATERIAL CONSUMPTION 15 The nearest railway siding is SMER (Shyam Metalics Railway siding) within the Plant Premises. . 16 FUEL, POWER / ENERGY & WATER REQUIREMENT WITH REQUISITE PERMISSION DETAILS WATER BALANCE DIAGRAM 17 MATERIAL BALANCE DIAGRAM (AFTER EXPANSION) Link: BASE LINE STUDY AREA MAP WITH LOCATIONS (DEC’ 2020-FEB’2021) 19 BASE LINE STUDY AREA MAP WITH LOCATIONS (JAN’2022) 20 METEROLOGICAL DETAILS WITH WIND ROSE DIAGRAM DEC 2020-FEB 2021 21 METEROLOGICAL DETAILS WITH WIND ROSE DIAGRAM JAN’2022 22 23 BASE LINE STUDY REPORT TRANSPORTATION PLAN- VEHICULAR TRAFFIC LOAD STUDY AS PER IRC GUIDELINE Traffic Study conducted at three Locations: Loc.1. Near entry gate of Shyam metalics, SH-10 (18,528 PCU/Day), Loc. 2: Bagbahal Chowk, SH-10 (12952 PCU/Day) & Loc. 3: Near Viraj Steel & Energy, SH-10 (16875 PCU/Day). No change in level of services (LoS) is envisaged due to proposed expansion. 24 25 ISOPLETH FOR PM 26 ISOPLETH FOR NOx 27 ISOPLETH FOR SO2 PUBLIC CONSULTATION PHOTOGRAPHS 28 Date of Public Hearing-31.08.2021 PUBLIC CONSULTATION DETAILS: 29 Link : ACTION PLAN TO ADDRESS PH ISSUES 30 31 ACTION PLAN TO ADDRESS PH ISSUES 32 ACTION PLAN TO ADDRESS PH ISSUES 33 ACTION PLAN TO ADDRESS PH ISSUES 34 EMP- NOISE (CONSTRUCTION/OPERATION) During Construction During Operation EMP- AIR (CONSTRUCTION/OPERATION) 35 During Operation EMP- AIR (CONSTRUCTION/OPERATION) 36 During Construction During Operation 37 EMP- WATER (CONSTRUCTION/OPERATION) During Construction During Operation The responsible person will be- Head, Environment Shyam Metalics and Energy Ltd. Communication protocol for any environmental issues to be communicated first to Head, Environment, subsequently the