essential details sought (EDS) and Additional

Published  . 0 views
↓ Download
essential details sought (EDS) and Additional
1 / 1
essential details sought (EDS) and Additional - slide 1 of 15 essential details sought (EDS) and Additional - slide 2 of 15 essential details sought (EDS) and Additional - slide 3 of 15 essential details sought (EDS) and Additional - slide 4 of 15 essential details sought (EDS) and Additional - slide 5 of 15 essential details sought (EDS) and Additional - slide 6 of 15 essential details sought (EDS) and Additional - slide 7 of 15 essential details sought (EDS) and Additional - slide 8 of 15 essential details sought (EDS) and Additional - slide 9 of 15 essential details sought (EDS) and Additional - slide 10 of 15 essential details sought (EDS) and Additional - slide 11 of 15 essential details sought (EDS) and Additional - slide 12 of 15 essential details sought (EDS) and Additional - slide 13 of 15 essential details sought (EDS) and Additional - slide 14 of 15 essential details sought (EDS) and Additional - slide 15 of 15
Description: essential details sought (EDS) and Additional Details Sought (Ads) in ec process STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA) RAJASTHAN Introduction Environmental Clearance (EC) is a statutory requirement under EIA

Related Topics

Download Presentation

"essential details sought (EDS) and Additional" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Presentation Transcript

slide1. essential details sought (EDS) and Additional Details Sought (Ads) in ec process STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA)
RAJASTHAN<br>
slide2. Introduction Environmental Clearance (EC) is a statutory requirement under EIA Notification, 2006
Proposals are submitted through the PARIVESH Portal
During appraisal, Authorities may seek clarifications or missing information
These are raised as:
Essential Details Sought (EDS)
Additional Details Sought (ADS)<br>
slide3. What is Essential Details Sought (EDS)? EDS refers to critical information/documents required for appraisal
Raised when mandatory details are missing or incomplete
Proposal cannot proceed further without EDS compliance
Considered basic and non-negotiable requirements
Sought by Member Secretary, SEAC from PP after submission
Example - Copy of Valid Approved DSR
- Valid LoI
- Receipt of Deposition of Processing Fee
- Distance Certificate from Deputy Conservator of Forests<br>
slide4. What is additional Details Sought (ADS)? ADS refers to supplementary or explanatory information

To obtain missing, unclear, or inadequate information from Project

Proponent to appraise scientifically, legally, and transparently

Raised during the appraisal process

To improve understanding of the proposal

Helps Authority take an informed decision

Example - Clarification on Pollution Control Measures
- Justification of Water Requirements
- Detailed Green Belt Development Plan
- Compliance of Terms of Reference (ToR) Conditions<br>
slide5. Why EDS and ADS are Raised? Incomplete or incorrect application

Non-adherence to EIA Notification & sector-specific ToR

Missing documents on PARIVESH Portal

Poor-quality EIA/EMP reports

Lack of understanding of regulatory requirements

Copy-paste or generic submissions<br>
slide6. Impact of EDS and ADS on EC Process Causes delay in appraisal and grant of EC

Leads to multiple deferrals in Authority meetings

Increases workload for Authorities and proponents

Affects project timelines and investments

Reduces overall efficiency of EC mechanism<br>
slide7. Significance of Understanding EDS & ADS Helps proponents submit complete and accurate proposals

Reduces instances of procedural delays

Improves quality of appraisal

Saves time for Authorities and Consultants

Enhances credibility of the EC process<br>
slide8. Commonly raised EDS Pre feasibility report
Valid LOI/LEASE documents
Copy of Geographical Toposheet (GT sheet) showing the area within 15 km of the mining lease
Receipt of Deposition of Processing Fee in compliance of DoE & CC, Government of Rajasthan Notification Dated July 24, 2025
Approved Mining Scheme/Plan
Copy of valid approved DSR
Aravali Certificate (If Applicable)
Cluster Certificate (If Applicable)<br>
slide9. Commonly raised EDS Certificate from Deputy Conservator of Forest (DCF) regarding distance from Forest and Protected Areas Like National Park, Wildlife Sanctuaries, Conservation Reserves
Affidavit from PP & Consultant regarding “No Violation” of Acts/Rules/Regulations/Notification of Central/State Government and No Litigation Pending against the Project and/or Land in which the Project is Proposed to be set up
Copy Of Previous EC Issued (In Case Of Expansion)
Monitoring Report Of Laboratory Certified from National Accreditation Board For Testing and Calibration Laboratories (NABL)
Certified Compliance Report (If Applicable)<br>
slide10. Commonly raised ADS List of Flora/Fauna found within the Study Area of the mining lease duly authenticated by the local DCF, and submission of draft of Wildlife Conservation Plan for Schedule-1 species as per the Wildlife Protection (Amendment) Act, 2022 in accordance with SEIAA Order Dated 03.11.2025.
Detailed Green Belt Development Plan with 4 Years of consecutive maintenance
Compliance of ToR Points
Action Plan incorporating all the issues raised during the Public Hearing (PH) along with time bound action plan for redressal of the same<br>
slide11. Commonly raised ADS Additional information as per Notification/OM of MoEF&CC
Project description including drawings showing project layout, components of project (Site plan, Utility Plan, Landscape Plan, Parking Layout Plan etc.) Sealed & signed by registered Architect or Competent Authority, existing Built Up Areas (BUA) & the maps submitted are as per Building by-laws 
In case of expansion - pointwise Certified Compliance Report of earlier EC duly certified by Integrated Regional Office, MoEF & CC.<br>
slide12. Role of Consultants & Project Proponents Thoroughly check applications before submission

Follow SEIAA/SEAC sector-specific checklists

Ensure accurate data entry on PARIVESH

Upload legible, signed, and valid documents

Avoid assumptions and generic content<br>
slide13. Best Practices to Minimize EDS & ADS Use the SEIAA Checklist for respective sectors

Cross-verify CAF, EIA/EMP, maps, and annexures

Ensure consistency across all documents

Address ToR conditions point-wise

Submit proposals with professional diligence<br>
slide14. Conclusion EDS and ADS are corrective tools, not obstacles
Their purpose is to ensure environmental compliance and transparency
Proper understanding and preparation can significantly reduce delays
Quality submissions lead to efficient appraisal and timely EC grant

“Quality submissions today ensure faster clearances tomorrow”<br>
slide15. SEIAA HELPLINE NO :
0141-3500181 For any details contact<br>