Thingaha Hotel Naypyitaw Myanmar October 272015 Objectives Scope and Procurement Plan of NEP By Thuya Aung Bo Deputy Chief Engineer Project Management Office NEP Ministry of Electric Power ID: 816097

district pmo shan office pmo district office shan 100 plan grid lot national electrification priority 2016 power area bago

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "1 Manufacturer’s Outreach Workshop," is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

1

Manufacturer’s Outreach Workshop,Thingaha Hotel, NaypyitawMyanmar.

October 27.2015

Objectives, Scope and Procurement Plan of NEP

By Thuya Aung BoDeputy Chief EngineerProject Management Office (NEP)Ministry of Electric Power

Slide2

National Electrification Plan (NEP)

Objective : To fully electrify all regions of Myanmar by 2030

Plan arrangement : UN's Sustainable Energy for ALL (SE4ALL)

: To fully electrify all regions of Myanmar by 2030

Leading body of drafting : World Bank GroupPeriod of drafting : May 2013 to September 2014

Slide3

Objectives of National Electrification Plan (NEP)

Manage to achieve the required sufficient fund for the plan to ensure access to electricity in the whole country.

The committee, serving as “single window”, to coordinate with international

development partners; local and international private sectors, including state’s budget,

for the investment fund of the plan.Manage to adopt the least-cost approach in undertaking the project activities under National electrification plan.Manage and supervise the implementation of the project to be considered beneficial to the people.

To set up clear directions and framework for private investors participation.

In an effort to provide electricity in off-grid areas, to handle with setting the rate of

power tariffs based on the amount of reasonable expenditure and returns.

Slide4

Numbers of household that will be able to access to the electricity : 7.2 . Methods

(1) Connect with National Grid (2) Connect with Mini Grid (3) Powered by solar, mini hydro, wind, diesel and hybrid (diesel + solar etc.) as pre-electrification.

Electrify by National Grid

99% of the households that is 50 km range from National Grid under this plan Mini Grid ,Solar Home System and others 1 % is from mini grid, solar and others. Planned to electrify 100% of the country by 2030Power availability under National Electrification Plan (NEP)

Slide5

To be Electrified from National Grid Transmission Lines

HV Transmission Line (Existing)

HV Transmission Line (Planned)

Electrification Area

within 25 km

Electrification Area

within 50 km

5

 

State/Region

Estimated

Population

(2011)

Existing

and Future Transmission

Expension

Plan

within 25 km

within 50 km

Kachin

1,257,257

92%

96%

Chin

5,985,389

92%

96%

Kayar

262,623

100%

100%

Kayin

1,588,067

84%

94%

Mon

2,675,187

97%

100%

Tanintharyi

1,220,319

95%

100%

Yangon

6,614,051

97%

100%

Ayeyarwaddy

5,525,272

84%

98%

Bago

5,962,202

96%

100%

Rakhine

4,296,507

90%

99%

Chin

513,818

55%

89%

Sagaing

5,827,408

87%

98%

Magway

5,196,998

88%

100%

Mandalay

6,744,796

97%

100%

NayPyiTaw

648,236

100%

100%

Total

54,318,130

92%

99%

Slide6

Yearly Expansion of Electricity form 2015-2016 to 2029-2030 Fiscal Year

47%31%

76%100%

To fully electrified the whole country total 517,000 household should be yearly connected after 2020

September6

Slide7

First Priority - Populated Area which will very close to the Power system

GridSecond Priority - Moderate Populated Area which can be connected from the Power System GridLast Priority - Remote Area which will be very difficult for transportation

Priority Stage for Electrification from the Power system Grid

7

Slide8

First Priority - Populated Area which will very close to the Power system

GridSecond Priority - Moderate Populated Area which can be connected from the Power System GridLast Priority - Remote Area which will be very difficult for transportation

Priority Stage for Electrification from the Power system Grid

8

Slide9

Proposal for Usage of World Bank Loan USD 310 million

SrDescription

Total Cost

(million USD

)1Material Cost for 11 kV Line and Distribution Transformer (First Phase-Priority) 164.2266 and 33 kV substation Upgrading (Second Phase)

53.5

3

Third Phase

60.6

4

Contingency

for above

21.7

5

TA and Project Management

10

Total for above

310

Loan amount

310

9

Slide10
10

Draft Procurement Plan for 11 kV network materials

SrType

of Materials

Procurement Methods

Comment LotExpected Contract dated1Transformer

ICB

10 Lot

Mar-2016

2

Concrete Pole

ICB

13 Lot

Apr-2016

3

ACSR Conductor

ICB

11 Lot

May-2016

4

11 kV Insulator

ICB

7 Lot

May-2016

5

LA,D/S,Fuse and Accessories

ICB

3 Lot

May-2016

6

Office Equipment

Shopping

2 package

Jan-2016

7

Vehicles

NCB

1

Jan-2016

NCB –National Competitive Bidding

ICB –International Competitive Bidding

Slide11

LOT

Quantity

Delivery Site

1

915Bago West-District, PMO Office21038

Kachin,Chin,SagaingDistrict, PMO Office

3

221

Shan(N)

-District

, PMO Office

4

351

Kayar, Shan(E

),Shan(S)

District

, PMO Office

5

784

Magway,Rakhine

District

, PMO Office

6

741

Bago(E),NayPyiTaw

District

, PMO Office

7

150

Kayin,Mon,Tanintharyi

District

, PMO Office

8

839

Ayeyarwaddy

-District

, PMO Office

9

236

Yangon

10

396

Mandalay

Total

5,671

Transformer Package

Slide12

Lot No

No. of Materials

Delivery Site

1

311Kachin -District, PMO Office22950Kayin-

District, PMO Office

3

2963

Mon,Tanintharyi

-District

, PMO Office

4

15666

Kayar, Shan(E

),Shan(S)

District

, PMO Office

5

47263

Chin,Sagaing-

District

, PMO Office

6

6962

Shan(N

)-

District

, PMO Office

7

33276

Magway,Rakhine-

District

, PMO Office

8

30154

Bago(E

)-

District

, PMO Office

9

34725

Bago(W

)-

District

, PMO Office

10

41131

Ayeyarwaddy

-District

, PMO Office

13379NayPyiTaw- ESE Store1212286Yangon1320769Mandalay

Total

251,834

Defining contract package to Bid the Concrete Pole

Slide13

Lot No

Tons

Delivery Site

1

348Kayar,Shan(E),Shan(S) -District, PMO Office2.1058

Kachin,Chin,Sagaing

-District, PMO Office

3.

152

Shan(N

)

-District

, PMO Office

4.

737

Magway,Rakhine-

District

, PMO Office

5.

670

Bago(E

)-

District

, PMO Office

6.

765

Bago(W

)-

District

, PMO Office

7.

917

Ayeyarwaddy-

District

, PMO Office

8.

131

Kayin,Mon,Tanintharyi

-

District

, PMO Office

9.

75

NayPyiTaw-

ESE Store

10.

275

Yangon

11.

465MandalayTotal5593

Defining contract Package to Bid the ACSR Conductor

Slide14

Lot No

Delivery Site

1.

Kachin,Chin,Sagaing,-District, PMO Office

2.Magway,Rakhine-District, PMO Office3.Bago(W),Ayeyarwaddy-District, PMO Office

4.

Kayar,Kayin,Mon,Shan(E),Shan(N),

Shan(S)-,Bago(E),Tantharyi

District

, PMO Office

5.

NayPyiTaw-

ESE Store

6.

Yangon

7.

Mandalay

Total

7

Lots

Defining Contract Package to Bid the 11 kV Insulator

Slide15

No. of Lot

Delivery Site

1

NayPyiTaw- ESE Store

1Yangon1MandalayTotals

3 Lots

Defining Contract Package to Bid the LA,D/S, Fuse and Accessories

Slide16