TRANSMISSION LINE PLAN  FOR DISTT. KARGIL(J&K) TRANSMISSION LINE PLAN  FOR DISTT. KARGIL(J&K)

TRANSMISSION LINE PLAN FOR DISTT. KARGIL(J&K) - PowerPoint Presentation

warlikebikers
warlikebikers . @warlikebikers
Follow
342 views
Uploaded On 2020-08-27

TRANSMISSION LINE PLAN FOR DISTT. KARGIL(J&K) - PPT Presentation

ZANSKAR AND SURU VALLEY By KMN ENGINEERING CONSULTANTS PVT LTD S NO INTERFACING SS INJECTIONMW LOCATION ELEVATIONm NORTHING EASTING 1 11KV SUBSTATION AT PADUM 940 3615 33274645 ID: 803798

stn line symbol 66kv line stn 66kv symbol project 5mw description 2mw sangrah transmission panikhar sapee valley plan 11kv

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "TRANSMISSION LINE PLAN FOR DISTT. KARGI..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

TRANSMISSION LINE PLAN

FOR DISTT. KARGIL(J&K)

ZANSKAR AND SURU VALLEY

By-:

KMN ENGINEERING CONSULTANTS PVT. LTD.

Slide2

S. NO.

INTERFACING S/SINJECTION(MW)LOCATIONELEVATION(m)NORTHINGEASTING111KV SUB-STATION AT PADUM9.40361533°27’46.45”76°52’24.75”266KV SUB-STATION AT PANIKHAR38.40324434°06’46.49"75°57’14.80”366KV SUB-STATION AT SANKOO53.50298734°16’33.81"75°58’34.47”

INJECTION POINTS FOR KREDA SHEPs

Slide3

ZANSKAR VALLEY TRANSMISSION PLAN

RARU 2MWIMP PROJECTTAMASHA 2.5 MWTAKKAR 0.30 MWSHILA 0.40 MWPADUMS/STN 11KVNANAURI GOMPA 0.70 MWTUNGRI 0.60 MWATING 0.60 MWPHEY0.70 MWZANGLA 1.6 MW33 KV LINE TO PANIKHAR S/STNDESCRIPTION SYMBOL

11

KV LINE

33 KV LINE

Slide4

SURU VALLEY TRANSMISSION PLAN

SHANGSHEE1.2 MWSHANGSHEE-11.07MWCHILONG-1 0.70MWCHILONG 1MWIMP PROJECTTANGOLE 4MWTRINGOCHAY0.23MWAMARTIK1MWPARKACHIK CANALPROJECT 1.5MWPARKACHIK-34.3 MWPARKACHIK-2

5MW

PARKACHIK-1

9MW

PANIKHAR S/STN

66KV

33KV LINE FROM PADAM S/STN

66 KV LINE TO SANKOO S/STN

DESCRIPTION

SYMBOL

33 KV LINE

66

KV LINE

Slide5

SAPEE-1

2MWSAPEE-21.03MWSAPEE-31.1MWGM PORE0.55MWBARTOO0.12MWTHILA1.6MWTAKET0.4MWKHANDI 1.5MWIMP PROJECTBARSOO1.2MWBARSOO-1

1.2MW

THANSGAM

1.5MW

SANKOO S/STN

66KV

EXISTING S/STN

66KV LINE FROM PANIKHAR S/STN

SANGRAH 1.5MW

IMP PROJECT

SANGRAH-1

1.4MW

66KV LINE TO MAIN GRID

DESCRIPTION

SYMBOL

33 KV LINE

66

KV LINE

Slide6

EVACUATION TRANSMISSION PLAN FOR ZANSKAR AND SURU VALLEY ZONE

RARU 2MWIMP PROJECTTAMASHA2.5MWTAKKAR 0.30MWSHILA 0.40MWZANGLA 1.6MWTUNGRI 0.60MWNANAURI GOMPA0.70MWATING 0.60MWPHEY 0.70MWPARKACHIK-1 9MWPARKACHIK-25MWPARKACHIK-34.3MWPARKACHIK CANAL PROJECT 1.5MWAMARTIK 1MWTRINGOCHAY 0.23MWTANGOLE 4MWCHILONG-10.70MWCHILONG 1MWIMP PROJECTSHANGSHEE-11.07MWSHANGSHEE 1.2MW

SANGRAH 1.5MW IMP PROJECT

SANGRAH-1

1.4MW

BARTOO 0.12MW

THILA 1.6MW

TAKET 0.40MW

KHANDI 1.5MW IMP PROJECT

SAPEE-1, 2 MW

SAPEE-2, 1.03 MW

SAPEE-3, 1.1 MW

GM PORE

0.55MW

BARSOO 1.2MW

BARSOO-1,

1.2MW

THANSGAM 1.5MW

TO MAIN GRID

66 KV LINE

DESCRIPTION

SYMBOL

11KV

LINE

33 KV LINE

66

KV LINE

DESCRIPTION

SYMBOL

11KV

S/STN

66KV S/STN

DESCRIPTION

SYMBOL

PROJECT

UNDER CONSTRUCTION

PROJECT AT PFR STAGE

PADUM S/STN

11KV

PANIKHAR S/STN

66KV

SANKOO S/STN

66KV

Slide7

THANK YOU