/

"The views expressed in this presentation are those of the author - PowerPoint Presentation

yieldpampers
yieldpampers . @yieldpampers
Follow
343 views
Uploaded On 2020-08-27

"The views expressed in this presentation are those of the author - PPT Presentation

The Grant Agreement Preparation an overview H2020 Horizon 2020 Coordinators Day Brussels 23SEPT2016 Grant agreement preparation GAP in H2020 H2020 GAP the process overview Key ID: 803741

preparation grant process agreement grant preparation agreement process gap management signature h2020 maximum proposal months 000 lsign participant accession

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document ""The views expressed in this presentatio..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

"The views expressed in this presentation are those of the author and do not necessarily reflect the views of the European Commission"

The Grant

Agreement Preparation - an overview

H2020 Horizon 2020 Coordinators'

Day

Brussels, 23/SEPT/2016

Slide2

Grant

agreement preparation (GAP) in

H2020

H2020 GAP – the process overview

Key success factors – tips

Slide3

EAs

REA

ERCEA

EASME

I

NEA

EACEA

CHAFEA

PPPs

IMI

2

FCH

2

Clean

Sky

2

BBI

SESAR

2

Shift

2

Rail

ECSEL

EIT

EIB

The

Family

CLIMA

EAC

MOVE

ENTR

JRC

CNCT

AGRI

COMM

RTD

ENER

ENV

DEVCO

SANCO

ECHO

MARE

P2Ps

EDCTP 2

AAL 2

EURO

STARS 2

EMPIR

3

Slide4

H2020 Grant Management Lifecycle

Slide5

Evaluation

harmonized rules uniform interpretationstandard processes

a

time-bound

process

Invitation to grant preparationGrant Agreement Preparation (GAP)Pre-financingf

ully electronic process

H2020

GAP

– the process

overview

committed to make it simpler and quicker

Grant signature

Accession GA

Slide6

time-bound

process

5 months maximum

8 months maximum

Invitation to grant preparation

Grant signature

Call deadline

Proposal Evaluation

Grant Agreement Preparation

Pre-financing

submission

Accession to GA

Maximum

five months

from

call closure date

- until

the date of informing

applicants about the outcome of proposal evaluation

Maximum

eight

months

from call closure

- until

the signature of the grant

agreement

Slide7

IT system suite for grant

managementFully integrated into the Participant Portal

Slide8

IT system suite for grant

management:

Participant Portal Grant Management Service (PPGMS)

Slide9

PPGMS

Slide10

Electronic-only

grant management

E-only: paper-free process endorsed by e-signature

Based on a "chain

of trust" enabling e-signatureIdentity and Access Management (IAM) Roles enabling e-signature

Slide11

Declaration of

honour

The Grant Agreement

Accession Forms

the

coordinator and each beneficiary,signed by the LSIGN- first the coordinator, by the LSIGN- second the EU EC/Agencyeach beneficiary - by the LSIGN

E-signatures on GAP

Slide12

no-negotiation

Your

proposal is taken

"as is"

The Grant Agreement (GA) is prepared on the basis of the proposal selected for fundingProposals are evaluated on their merit and not on their potential

BUT this does not mean "no change at all"Changes to meet legal and/or financial requirements (eligibility) Changes that are necessary: Requirements resulting from ethics review or security scrutinyDue to removal of a participant (if agreed)Correction of clerical errors and obvious inconsistencies

Slide13

… and some metrics (*)

more than

200.000 e-signatures collected more than

550.000 electronic documents stored in e-repository

Grant Preparation (GAP)More than 10.000 grant agreements e-signedOther 1.200+ GAs are under preparationConsortium initiated amendments (AMDC)1.670 amendments signed and in force

Other 420+ is under preparation More than 100 with on-going EC assessmentReporting – payments (REPA)More than 8,000 deliverables submitted574 reports are under preparationanother 265 are submitted un assessmentand 1.176 reports have already been processed with payment (* figures as of 20/09/2016)

Slide14

Thank you