MICO 146 Steve Virostek LBNL June 6 2011 LBNL Progress Quench analysis now being finalized Quench resistor cooling test fully assembled and ready for testing Radiation shield eddy current analysis to be complete this ID: 406815
Download Presentation The PPT/PDF document "Spectrometer Solenoids" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Spectrometer SolenoidsMICO 146Steve VirostekLBNLJune 6, 2011Slide2
LBNL Progress
Quench analysis now being finalized
Quench resistor cooling test fully assembled and ready for testing
Radiation shield eddy current analysis to be complete this
week
1
st
batch of temperature sensors to be received this week, 2
nd
batch + monitors have
been ordered
Shipping load and modal analyses for
shield and cold mass are under way
Additional
cryo
tech help
to be identifiedSlide3
Wang NMR Progress
Fabrication drawings for magnet modifications are now complete
Meeting held last Friday for LBNL review of drawings and revised heat leak calculations
Cold mass being prepared
to be cut open (awaiting resistor test results)
1100 Al for new shields is at Wang NMR, material to go out for
rolling in 1 to 2 weeks
Wang
NMR will provide quote to LBNL for magnet modifications this week