TEIS Process Overview Create TEISID - PPT Presentation

StandardizeNoData ValidateGeometry ValidateDomains ValidateRange CreateErrorSummary Load data to Contractor Package gdb templates Quality control the data Submit clean data in gdb ID: 933466

table data long project data table project long teis tools create gdb steps optional details fields scripts check error

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "TEIS Process Overview Create TEISID" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

TEIS Process Overview

Create TEISIDStandardizeNoDataValidateGeometryValidateDomainsValidateRangeCreateErrorSummary

Load data to Contractor Package .gdb templates

Quality control the data

Submit ‘clean’ data in gdb to MoE

Optional: Index dataCreate Short Table and Project Boundaries FCs

Summary of steps

Available Scripts/Tools

TEIS Data Submission Tool (website)

CreateIndexesCreateShortTableCreateProjectBoundaries

CompareFieldsCompareFieldsnoAlias

Plan Project and request BAPID

Complete TEI mapping

project and capture data

TEI Guidelines for developing a project plan

TEI Mapping and Data Capture Standards & Contractor

Pkge

Validate

Data

Slide2

Loading new data to the .

gdbCapture spatial data using your ‘usual’ tools and procedures

StepsPython Scripts/Tools

Populate a polygon attribute table using your ‘usual’ tools and procedures (e.g. Excel)

Populate a project details table using your ‘usual’ tools (e.g. Excel)

Load all the above to the Long Table and Project Details templates in the .gdb

Long Table FC

Project

Details Table

Go to QC steps

TEIS Contractor Package contains:

Long Table Template Project Details Template in the Operational.gdb

Slide3

To import an existing coverage to the .

gdb:Go to QC steps

Import coverage to a blank .gdb

Set tolerance to 0.001

CompareFields or CompareFieldsnoAlias

StandardizeNoData (also run later with QA tools)

StepsPython Scripts/Tools

Compare the imported fields to the current TEIS templates

Fix Fields as necessary (e.g. create new fields to match Template Field name, data type, field length, etc. and recalculate values)

Fix fields that should be blank (no data) but contain ‘0’ zeros

Data is now in the TEIS standard .

gdb

Slide4

TEIS Quality Control Procedures:

StepsPython Scripts/Tools

Create a unique identifier for each Long Table record

Check Geometry (of Long Table)

Check for valid attributes (codes)

Using the TEIS_ID (= Feature ID in error reports)Link the error reports and/or error summary table to Long Table, and work through fixing the invalid codes, etc.

CreateTEISIDStandardizeNoData

ValidateGeometry

ValidateDomains

ValidateRows CreateErrorSummary

Submit .gdb to MoE and/or do additional (optional) processing

TEIS Data Submission Website

Create a unique identifier for each Long Table record

Check Geometry (of Long Table)

Check for valid attributes (codes) (check domains and ranges)

Create a summary of errors for each record in Long Table

Error Checking

Repeat this QC procedure until data is clean.

ValidateData

Slide5

Additional (optional) steps

Note: If amalgamating multiple project datasets into one set of feature classes, re-create unique TEIS_ID’s first, then index the data and rerun QC routines and optional routines Note: CreateProjectBoundary

requires an ArcInfo Licence level to run.Steps

Python Scripts/Tools

Summarize Long Table data to create label fields and pull out key attributes (e.g. for plotting or manual/visual review)

Create a project boundary FC with project details

Index the data (v. large datasets)

CreateIndexes

CreateShortTable

CreateProjectBoundary

Optional steps