/
CTF3 Streak Camera Results and Improvements CTF3 Streak Camera Results and Improvements

CTF3 Streak Camera Results and Improvements - PowerPoint Presentation

anastasia
anastasia . @anastasia
Follow
65 views
Uploaded On 2023-10-30

CTF3 Streak Camera Results and Improvements - PPT Presentation

Aurélie Rabiller BEBIPM 09022012 Summary 2011 Measurements in CR DL and CLEX Optical lines improvements Streak camera operation Discussion 2 CTF3 streak camera February 2012 Streak camera optical lines ID: 1027109

camera streak 2012 bunch streak camera bunch 2012 february length window spacing measurements light control time train beam optical

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "CTF3 Streak Camera Results and Improveme..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1. CTF3 Streak CameraResults and ImprovementsAurélie Rabiller BE-BI-PM09.02.2012

2. Summary2011 Measurements in CR, DL and CLEXOptical lines improvementsStreak camera operationDiscussion2CTF3 streak camera - February 2012

3. Streak camera optical linesOTR light sourcesSynchrotron light sourcesDL labCLEX labCR lab3CTF3 streak camera - February 2012

4. 2011 MeasurementsCombiner ring: Bunch length stability and bunch spacingBunch length: 200 ps window Turn 1 to Turn 4 (10.06.2011)Very few measurements this year due to the difficulties to operate the beam+Misalignment of the optical lineMulti-turn bunch length stability (July)Bunch Spacing (July)Bunch spacing : 500 ps window Turn2 and 3 (13.07.2011)4CTF3 streak camera - February 2012

5. CLEX: bunch length and bunch spacingBunch length and bunch spacing along the train (July)Bunch length and bunch spacing along train: 25 ps/mm speed2011 MeasurementsFirst measurements with the line done successfullyNeed more beam time to finish commissioning5CTF3 streak camera - February 2012

6. Optical lines improvementsCombiner ring: re-alignment of the lines => next weekDelay Loop: re-aligned last year, shoud be ready for measurements (No measurements last year due to difficulties to send the beam in DL)CLEX:- addition of a light shielding => next month- replacement of the lens by an elliptical mirror => this yearThird streak camera equiped with readout camera => ready=> One streak camera for each lab6CTF3 streak camera - February 2012

7. Operation of the streak camerasGeneral procedure: spot adjustment in focus mode (no sweep) : the spot should be centered on the slit and as focused as possibleslit reduced to 0.2-0.4mm (depending of the spot size and the light intensity) In Focus mode, the camera is really sensitive to light switch in sweep mode with the biggest time window (1ns) to find the train (trigger delays adjustment)Reduce step by step the time window with trigger and gain adjustmentFor this procedure, the presence in the lab is required7CTF3 streak camera - February 2012

8. Old streaks:Manual control of shutter, slopes and gain => For the operation of old streaks, presence in the lab requiredno online values => data needed to be processed (Matlab or equivalent)New streak:automatic control of shutter, slopes and gainonline bunch length value providedpossibility to use cursors on the graphic window for rough bunch spacing valuespossibility to control the camera with LabView applicationOperation of the streak cameras8CTF3 streak camera - February 2012

9. Online processing of the data (Labview application or else)Remote control of the cameras...Discussion9CTF3 streak camera - February 2012