Jopilin L Nonglait Programme Manager FFDA Directorate of Fisheries Shillong MAWTHADRAISHAN amp MAIRANG CampRD BLOCK FIELD VERIFICATION OF THE SCHEME SPA 201011 VALUE CHAIN 201011 amp RKVY CORPUS FUND 201112 IMPLEMENTED UNDER MSAM ID: 270900

constructed0 pond block width pond constructed0 width block pin area scheme haactual identification hapond number remarks moverflow pipe4 completion100 mslope1 spaarea percentage

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Presented by: Smt." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Presented by: Smt.

Jopilin L. NonglaitProgramme Manager, FFDADirectorate of Fisheries, Shillong

MAWTHADRAISHAN & MAIRANG C&RD BLOCK

FIELD VERIFICATION OF THE SCHEME SPA (2010-11), VALUE CHAIN (2010-11) & RKVY CORPUS FUND (2011-12) IMPLEMENTED UNDER MSAMSlide2

Name of the scheme

SPA

Area of the pond to be Constructed0.1 HaActual area of the pond constructed 0.1 HaPond identification Number (PIN)2531391254

BundhCrest width>1.5MBottom width< 3 MSlope

1:1

Depth< 1 MOverflow pipe2-4 inchDrain pipe8 inch Percentage of completion100

Remarks:They will try to raise the pond depth. Previously the pond size is less but now they have constructed another two small ponds to meet the specification.

1. Christian UP School, Nongkasen

MAIRANG BLOCKSlide3

Remarks:

He has already constructed 6 ponds but 3 are meant for value chain. Seed had been stocked with own expenditure, still waiting for the Departmental fish seed.

2. Shri Emkwingshon Marngar, NongkasenName of the schemeValue Chain

Area of the pond to be Constructed0.1 HaActual area of the pond constructed 0.12 Ha

Pond identification Number (PIN)

2530991254BundhCrest width1-1.5MBottom width< 5 MSlope

1:1Depth1-1.5 MOverflow pipe

No overflowDrain pipe8 inch

Percentage of completion

100

MAIRANG BLOCKSlide4

3.

Shri

Bankitbok Lyngkhoi, Nongkasen

Remarks:Work is in progress, only first installment received.

Name of the scheme

Value ChainArea of the pond to be Constructed0.1 HaActual area of the pond constructed 0.12

HaPond identification Number (PIN)2531091254BundhCrest width

> 1.5MBottom width

> 5 M

Slope

1:1

Depth

1-1.5

M

Overflow pipe

No overflow

Drain pipe

4-6

inch

Percentage of completion

50

MAIRANG BLOCKSlide5

4

. Smti. Triansinoris

Iawphniaw, LanglewRemarks:Fish seeds had been stocked borne from her own expenditure. Still waiting for the Departmental fish seed.

Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed

0.1 HaPond identification Number (PIN)2528591256BundhCrest width> 1.5MBottom width< 3 M

Slope1:1Depth1-1.5 M

Overflow pipeNo overflowDrain pipe

4-6

inch

Percentage of completion

100

MAIRANG BLOCKSlide6

5

.

Shri. Kesparlin Syiemlieh, Marngor

Remarks:Fish seeds had been stocked with own expenditure, 2nd installment received, loan has not clear yet.Name of the scheme

SPA

Area of the pond to be Constructed0.1 HaActual area of the pond constructed 0.15 HaPond identification Number (PIN)2527491256

BundhCrest width> 1.5MBottom width> 5

MSlope1:1Depth

> 1.5

M

Overflow pipe

No overflow

Drain pipe

4-6

inch

Percentage of completion

100

MAIRANG BLOCKSlide7

6

. Shri Hoben Sohshang

, MarngorRemarks:Fish seeds had been stocked with own expenditure, 2nd installment received, pond constructed through diversion of the river.

Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed

0.1 HaPond identification Number (PIN)2527691259BundhCrest width> 1.5 MBottom width> 5 M

Slope1:1Depth> 1.5 M

Overflow pipeNo overflowDrain pipe

4-6

inch

Percentage of completion

100

MAIRANG BLOCKSlide8

Remarks:There is no water in the pond due to leakage, therefore he constructed with cemented wall and work is in progress.

7. Shri Finder Lyngdoh, Langlew

Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed

0.2 HaPond identification Number (PIN)2528991254Bundh

Crest width

> 1.5 MBottom width3-5 MSlope1:1Depth> 1.5 M

Overflow pipeNo overflowDrain pipe4-6 inch

Percentage of completion100MAIRANG BLOCKSlide9

Remarks:He conveyed the message to the Department to extend the supply of feed and fertilizers in the second year also.

8.

Shri Welphang Marngar, LaitksehName of the schemeSPAArea of the pond to be Constructed

0.1 HaActual area of the pond constructed 0.1 HaPond identification Number (PIN)

2530191246

BundhCrest width> 1.5MBottom width> 5 MSlope2:1

Depth1-1.5 MOverflow pipeNo overflow

Drain pipe4-6 inchDate of stocking

5-09-2013

Percentage of completion

100

MAIRANG BLOCKSlide10

Remarks:

The water quality is good since he followed what he learnt from the training given to him. He is ready to construct another pond with his own expenditure.

9. Shri Ristarkhos Marngar, LaitksehName of the scheme

SPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed

0.1

HaPond identification Number (PIN)2530091244BundhCrest width1-1.5MBottom width< 3 M

Slope1:1Depth1-1.5 MOverflow pipe

4-5 inchDrain pipe

4-6 inch

Date of stocking

5-09-2013

Percentage of completion

100

MAIRANG BLOCKSlide11

Remarks:The pond is situated in the market place; his interest is to convert it into a tourist spot.

10.

Shri Spailin Sohlang, MarkasaName of the schemeValue ChainArea of the pond to be Constructed

0.1 HaActual area of the pond constructed 0.1 HaPond identification Number (PIN)

2531891259

BundhCrest width> 1.5 MBottom width> 5 MSlope1:1Depth

1-1.5 MOverflow pipe4-5 inchDrain pipe

4-6 inch Percentage of completion

100

MAIRANG BLOCKSlide12

11.

Shri Planningstar Lyngdoh Mawnai,

MawrohRemarks: The farmer takes interest on pond construction even though the subsidy could not meet his excess expenditure. Pond reconstructed with cement since the wall collapse due to penetration of water.

Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed

0.1

HaPond identification Number (PIN)2536191388BundhCrest width1-1.5 MBottom width3-5 M

Slope1:1Depth1-1.5 M

Overflow pipe2-4 inchDrain pipe

Not yet installed

Percentage of completion

80

MAWTHADRAISHAN BLOCKSlide13

Remarks:Water quality is good since application of cow dung is followed up properly. She wanted to expand her pond little bit bigger. Waiting for the departmental seed.

12. Smt. Drelin Jana, Mawroh

Name of the schemeSPAArea of the pond to be Constructed0.1 Ha

Actual area of the pond constructed0.1 HaPond identification Number (PIN)2536091385Bundh

Crest width

1-1.5 MBottom width3-5 MSlope1:1Depth1-1.5 MOverflow pipe

4-5 inchDrain pipe4-6 inch Percentage of completion

100MAWTHADRAISHAN BLOCKSlide14

Remarks:Stocked with 2 quintal of Fish seed purchased from Umsning

. Still waiting for the departmental seed since the pond is already exceed 0.1 ha.13. Smt. Mali Nongbri, Mawlumkohkhrang

Name of the schemeSPAArea of the pond to be Constructed0.1 Ha

Actual area of the pond constructed0.4 HaPond identification Number (PIN)2535091333Bundh

Crest width

> 1.5 MBottom width3-5 MSlope1:1Depth> 1.5 MOverflow pipe

No overflowDrain pipe4-6 inch

Percentage of completion100MAWTHADRAISHAN BLOCKSlide15

Remarks:Stocked with 2 quintal of Fish seed from own expenditure.

14. Smt. Jrolmai Jana,

PhudbahSon in photoName of the schemeSPAArea of the pond to be Constructed

0.1 HaActual area of the pond constructed0.38 HaPond identification Number (PIN)

2535991341

BundhCrest width> 1.5 MBottom width> 5 MSlope2:1Depth

> 1.5 MOverflow pipeNo overflowDrain pipe

4-6 inch Percentage of completion

100

MAWTHADRAISHAN BLOCKSlide16

Remarks:He cleared up the bank loan immediately.

15. Shri Stendro Rani, Phudbah

Name of the schemeSPAArea of the pond to be Constructed0.1 Ha

Actual area of the pond constructed0.1 HaPond identification Number (PIN)2536191341Bundh

Crest width

> 1.5 MBottom width> 5 MSlope1:1Depth> 1.5 MOverflow pipe

2-4 inchDrain pipe4-6 inch Percentage of completion

100MAWTHADRAISHAN BLOCKSlide17

Remarks:Fish seeds had been stocked borne from own expenditure. Still waiting for the departmental seed.

16. Shri

Richardpower Lyngdoh Mawnai, MawshutGrand father in photoName of the schemeSPA

Area of the pond to be Constructed0.1 HaActual area of the pond constructed0.1 HaPond identification Number (PIN)

2535091369

BundhCrest width> 1.5 MBottom width3-5 MSlope1:1Depth

1-1.5 MOverflow pipe2-4 inchDrain pipe

8 inch Percentage of completion

100

MAWTHADRAISHAN BLOCKSlide18

Remarks:Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.

17. Smt. Patricia Lyngdoh Mawnai, Mawshut

Husband in photoName of the schemeSPAArea of the pond to be Constructed

0.1 HaActual area of the pond constructed0.1 HaPond identification Number (PIN)253509136

Bundh

Crest width> 1.5 MBottom width> 5 MSlope1:1Depth1-1.5

MOverflow pipe> 5 inchDrain pipe4-6

inch Percentage of completion100

MAWTHADRAISHAN BLOCKSlide19

18. Smt. Krossmolin Ryntathiang, Langstiehrim

Remarks:

250 kg of Fish seeds had been stocked borne from her own expenditure, now there many fingerlings hatched from the old brood fish; she also contributed table sized fish during the 1st Aqua fest. Water quality is good.Husband in photoName of the scheme

SPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed0.1 Ha

Pond identification Number (PIN)

2534291376BundhCrest width1-1.5 MBottom width3-5 MSlope

1:1Depth1-1.5 MOverflow pipe2-4 inch

Drain pipeNo drain pipe

Percentage of completion

100

MAWTHADRAISHAN BLOCKSlide20

19.

Smt. Wahidir Wahlang, Sangshong

Remarks:Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.Husband in photo

Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed

0.1

HaPond identification Number (PIN)2533291379BundhCrest width1-1.5 MBottom width3-5 M

Slope1:1Depth1-1.5 M

Overflow pipe4-5 inchDrain pipe

4-6

inch

Percentage of completion

100

MAWTHADRAISHAN BLOCKSlide21

20. Shri Bakerlang Marbaniang, Sangshong

Remarks:

Repayment of loan is completed; the cost of labour is more since the pond is quite big.Name of the schemeSPA

Area of the pond to be Constructed0.1 HaActual area of the pond constructed0.88 HaPond identification Number (PIN)

2532991379

BundhCrest width-Bottom width-Slope-Depth

-Overflow pipeNo overflow

Drain pipe4-6 inchPercentage of completion

80

MAWTHADRAISHAN BLOCKSlide22

THANK YOU