Download Presentation The PPT/PDF document "Presented by: Smt." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Presented by: Smt.
Jopilin L. NonglaitProgramme Manager, FFDADirectorate of Fisheries, Shillong
MAWTHADRAISHAN & MAIRANG C&RD BLOCK
FIELD VERIFICATION OF THE SCHEME SPA (2010-11), VALUE CHAIN (2010-11) & RKVY CORPUS FUND (2011-12) IMPLEMENTED UNDER MSAMSlide2
Name of the scheme
SPA
Area of the pond to be Constructed0.1 HaActual area of the pond constructed 0.1 HaPond identification Number (PIN)2531391254
BundhCrest width>1.5MBottom width< 3 MSlope
1:1
Depth< 1 MOverflow pipe2-4 inchDrain pipe8 inch Percentage of completion100
Remarks:They will try to raise the pond depth. Previously the pond size is less but now they have constructed another two small ponds to meet the specification.
1. Christian UP School, Nongkasen
MAIRANG BLOCKSlide3
Remarks:
He has already constructed 6 ponds but 3 are meant for value chain. Seed had been stocked with own expenditure, still waiting for the Departmental fish seed.
2. Shri Emkwingshon Marngar, NongkasenName of the schemeValue Chain
Area of the pond to be Constructed0.1 HaActual area of the pond constructed 0.12 Ha
Pond identification Number (PIN)
2530991254BundhCrest width1-1.5MBottom width< 5 MSlope
1:1Depth1-1.5 MOverflow pipe
No overflowDrain pipe8 inch
Percentage of completion
100
MAIRANG BLOCKSlide4
3.
Shri
Bankitbok Lyngkhoi, Nongkasen
Remarks:Work is in progress, only first installment received.
Name of the scheme
Value ChainArea of the pond to be Constructed0.1 HaActual area of the pond constructed 0.12
HaPond identification Number (PIN)2531091254BundhCrest width
> 1.5MBottom width
> 5 M
Slope
1:1
Depth
1-1.5
M
Overflow pipe
No overflow
Drain pipe
4-6
inch
Percentage of completion
50
MAIRANG BLOCKSlide5
4
. Smti. Triansinoris
Iawphniaw, LanglewRemarks:Fish seeds had been stocked borne from her own expenditure. Still waiting for the Departmental fish seed.
Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed
0.1 HaPond identification Number (PIN)2528591256BundhCrest width> 1.5MBottom width< 3 M
Slope1:1Depth1-1.5 M
Overflow pipeNo overflowDrain pipe
4-6
inch
Percentage of completion
100
MAIRANG BLOCKSlide6
5
.
Shri. Kesparlin Syiemlieh, Marngor
Remarks:Fish seeds had been stocked with own expenditure, 2nd installment received, loan has not clear yet.Name of the scheme
SPA
Area of the pond to be Constructed0.1 HaActual area of the pond constructed 0.15 HaPond identification Number (PIN)2527491256
BundhCrest width> 1.5MBottom width> 5
MSlope1:1Depth
> 1.5
M
Overflow pipe
No overflow
Drain pipe
4-6
inch
Percentage of completion
100
MAIRANG BLOCKSlide7
6
. Shri Hoben Sohshang
, MarngorRemarks:Fish seeds had been stocked with own expenditure, 2nd installment received, pond constructed through diversion of the river.
Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed
0.1 HaPond identification Number (PIN)2527691259BundhCrest width> 1.5 MBottom width> 5 M
Slope1:1Depth> 1.5 M
Overflow pipeNo overflowDrain pipe
4-6
inch
Percentage of completion
100
MAIRANG BLOCKSlide8
Remarks:There is no water in the pond due to leakage, therefore he constructed with cemented wall and work is in progress.
7. Shri Finder Lyngdoh, Langlew
Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed
0.2 HaPond identification Number (PIN)2528991254Bundh
Crest width
> 1.5 MBottom width3-5 MSlope1:1Depth> 1.5 M
Overflow pipeNo overflowDrain pipe4-6 inch
Percentage of completion100MAIRANG BLOCKSlide9
Remarks:He conveyed the message to the Department to extend the supply of feed and fertilizers in the second year also.
8.
Shri Welphang Marngar, LaitksehName of the schemeSPAArea of the pond to be Constructed
0.1 HaActual area of the pond constructed 0.1 HaPond identification Number (PIN)
2530191246
BundhCrest width> 1.5MBottom width> 5 MSlope2:1
Depth1-1.5 MOverflow pipeNo overflow
Drain pipe4-6 inchDate of stocking
5-09-2013
Percentage of completion
100
MAIRANG BLOCKSlide10
Remarks:
The water quality is good since he followed what he learnt from the training given to him. He is ready to construct another pond with his own expenditure.
9. Shri Ristarkhos Marngar, LaitksehName of the scheme
SPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed
0.1
HaPond identification Number (PIN)2530091244BundhCrest width1-1.5MBottom width< 3 M
Slope1:1Depth1-1.5 MOverflow pipe
4-5 inchDrain pipe
4-6 inch
Date of stocking
5-09-2013
Percentage of completion
100
MAIRANG BLOCKSlide11
Remarks:The pond is situated in the market place; his interest is to convert it into a tourist spot.
10.
Shri Spailin Sohlang, MarkasaName of the schemeValue ChainArea of the pond to be Constructed
0.1 HaActual area of the pond constructed 0.1 HaPond identification Number (PIN)
2531891259
BundhCrest width> 1.5 MBottom width> 5 MSlope1:1Depth
1-1.5 MOverflow pipe4-5 inchDrain pipe
4-6 inch Percentage of completion
100
MAIRANG BLOCKSlide12
11.
Shri Planningstar Lyngdoh Mawnai,
MawrohRemarks: The farmer takes interest on pond construction even though the subsidy could not meet his excess expenditure. Pond reconstructed with cement since the wall collapse due to penetration of water.
Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed
0.1
HaPond identification Number (PIN)2536191388BundhCrest width1-1.5 MBottom width3-5 M
Slope1:1Depth1-1.5 M
Overflow pipe2-4 inchDrain pipe
Not yet installed
Percentage of completion
80
MAWTHADRAISHAN BLOCKSlide13
Remarks:Water quality is good since application of cow dung is followed up properly. She wanted to expand her pond little bit bigger. Waiting for the departmental seed.
12. Smt. Drelin Jana, Mawroh
Name of the schemeSPAArea of the pond to be Constructed0.1 Ha
Actual area of the pond constructed0.1 HaPond identification Number (PIN)2536091385Bundh
Crest width
1-1.5 MBottom width3-5 MSlope1:1Depth1-1.5 MOverflow pipe
4-5 inchDrain pipe4-6 inch Percentage of completion
100MAWTHADRAISHAN BLOCKSlide14
Remarks:Stocked with 2 quintal of Fish seed purchased from Umsning
. Still waiting for the departmental seed since the pond is already exceed 0.1 ha.13. Smt. Mali Nongbri, Mawlumkohkhrang
Name of the schemeSPAArea of the pond to be Constructed0.1 Ha
Actual area of the pond constructed0.4 HaPond identification Number (PIN)2535091333Bundh
Crest width
> 1.5 MBottom width3-5 MSlope1:1Depth> 1.5 MOverflow pipe
No overflowDrain pipe4-6 inch
Percentage of completion100MAWTHADRAISHAN BLOCKSlide15
Remarks:Stocked with 2 quintal of Fish seed from own expenditure.
14. Smt. Jrolmai Jana,
PhudbahSon in photoName of the schemeSPAArea of the pond to be Constructed
0.1 HaActual area of the pond constructed0.38 HaPond identification Number (PIN)
2535991341
BundhCrest width> 1.5 MBottom width> 5 MSlope2:1Depth
> 1.5 MOverflow pipeNo overflowDrain pipe
4-6 inch Percentage of completion
100
MAWTHADRAISHAN BLOCKSlide16
Remarks:He cleared up the bank loan immediately.
15. Shri Stendro Rani, Phudbah
Name of the schemeSPAArea of the pond to be Constructed0.1 Ha
Actual area of the pond constructed0.1 HaPond identification Number (PIN)2536191341Bundh
Crest width
> 1.5 MBottom width> 5 MSlope1:1Depth> 1.5 MOverflow pipe
2-4 inchDrain pipe4-6 inch Percentage of completion
100MAWTHADRAISHAN BLOCKSlide17
Remarks:Fish seeds had been stocked borne from own expenditure. Still waiting for the departmental seed.
16. Shri
Richardpower Lyngdoh Mawnai, MawshutGrand father in photoName of the schemeSPA
Area of the pond to be Constructed0.1 HaActual area of the pond constructed0.1 HaPond identification Number (PIN)
2535091369
BundhCrest width> 1.5 MBottom width3-5 MSlope1:1Depth
1-1.5 MOverflow pipe2-4 inchDrain pipe
8 inch Percentage of completion
100
MAWTHADRAISHAN BLOCKSlide18
Remarks:Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.
17. Smt. Patricia Lyngdoh Mawnai, Mawshut
Husband in photoName of the schemeSPAArea of the pond to be Constructed
0.1 HaActual area of the pond constructed0.1 HaPond identification Number (PIN)253509136
Bundh
Crest width> 1.5 MBottom width> 5 MSlope1:1Depth1-1.5
MOverflow pipe> 5 inchDrain pipe4-6
inch Percentage of completion100
MAWTHADRAISHAN BLOCKSlide19
18. Smt. Krossmolin Ryntathiang, Langstiehrim
Remarks:
250 kg of Fish seeds had been stocked borne from her own expenditure, now there many fingerlings hatched from the old brood fish; she also contributed table sized fish during the 1st Aqua fest. Water quality is good.Husband in photoName of the scheme
SPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed0.1 Ha
Pond identification Number (PIN)
2534291376BundhCrest width1-1.5 MBottom width3-5 MSlope
1:1Depth1-1.5 MOverflow pipe2-4 inch
Drain pipeNo drain pipe
Percentage of completion
100
MAWTHADRAISHAN BLOCKSlide20
19.
Smt. Wahidir Wahlang, Sangshong
Remarks:Fish seeds had been stocked borne from her own expenditure, repayment of loan is completed.Husband in photo
Name of the schemeSPAArea of the pond to be Constructed0.1 HaActual area of the pond constructed
0.1
HaPond identification Number (PIN)2533291379BundhCrest width1-1.5 MBottom width3-5 M
Slope1:1Depth1-1.5 M
Overflow pipe4-5 inchDrain pipe
4-6
inch
Percentage of completion
100
MAWTHADRAISHAN BLOCKSlide21
20. Shri Bakerlang Marbaniang, Sangshong
Remarks:
Repayment of loan is completed; the cost of labour is more since the pond is quite big.Name of the schemeSPA
Area of the pond to be Constructed0.1 HaActual area of the pond constructed0.88 HaPond identification Number (PIN)
2532991379
BundhCrest width-Bottom width-Slope-Depth
-Overflow pipeNo overflow
Drain pipe4-6 inchPercentage of completion
80
MAWTHADRAISHAN BLOCKSlide22
THANK YOU