MASTER PLAN UPDATE February 15, 2017 MASTER PLAN UPDATE February 15, 2017

MASTER PLAN UPDATE February 15, 2017 - PowerPoint Presentation

calandra-battersby
calandra-battersby . @calandra-battersby
Follow
353 views
Uploaded On 2018-11-04

MASTER PLAN UPDATE February 15, 2017 - PPT Presentation

Cmon Whats taking so long Votes needed to be verified by board of elections Ofcc osfc needed to review Elyrias documentation submitted in spring 2016 Bond counsel and broker had to prepare for bond sales ID: 714465

site phase 2018 august phase site august 2018 2019 construction complex 2021 school 2017 2020 design march sports ready

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "MASTER PLAN UPDATE February 15, 2017" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

MASTER PLAN UPDATE

February 15, 2017Slide2

C’mon What’s taking so long?

Votes needed to be verified by board of elections

Ofcc (osfc) needed to review Elyria’s documentation submitted in spring 2016

Bond counsel and broker had to prepare for bond sales

Bonds need to be sold in two groups - district rated by Moody

Architect firm needs to be hired – interviews scheduled for February 17

Construction firm needs to be hired – interviews tentatively scheduled for March 27Slide3

Is the process the same for the sports complex?

Sports complex is a local funded initiative (LFI) – not part of co-funded issue

Board hired architectural Vision Group (AVG) already for sports complexBoth pre-bond and post-bond preliminary work in process on sports complexMajor work re design and completion schedule nearly done

-

permits and approvals being sought and near completion

phase 1 south portion – stadium and practice fields begin in march 2017

Phase 1 south portion ready for use august 2018 (phase 2 tentatively September 2019)Slide4
Slide5

New schools site locations reminder and configurations

Ely site:

k - 4Abbe rd soccer field/spring valley site: pre-k - 8 complex

Eastern heights site: k – 8 complex

Hamilton site: k – 4

Township site: k – 8 complexSlide6

Preliminary timelines for schools

to run concurrent with sports complex construction

Spring Valley abatement/demo – August through December 2017Abbe Rd. site and ely site

+ program of requirements & schematics phase - March through

july

2017

+ design phase – august 2017 through march 2018

+ Construction phase – April 2018 through August 2019

+ tentative opening date – start of school for the 2019 – 2020 school year

The

ely

site will require approximately 4 months after school opens to allow for remaining demolition of

ely

school and grounds completionSlide7

Timelines continued

Eastern heights site – grades 5-8 phase

+ por & schematic (both phases) – April through August 2018+ design (both phases) – September 2018 through

april

2019

+ Construction phase – May 2019 through august 2020 ready for opening 2020-2021

sy

Eastern heights site – grades k-4 phase

+ construction phase –

june

2020 through summer of 2021 ready for opening 2021-2022

sy

Demolition of current eastern heights in phases as new school is completedSlide8

Timelines continued

Hamilton school demolished fall/winter 2017

Hamilton site+por & schematic phase – December 2017 through march 2018+ design phase –

april

2018 through December 2018

+ construction phase – January 2019 through August 2020

+ ready for opening 2020 – 2021

sySlide9

Timeline continued

Township complex

+ por & schematic - august through December 2018+ design phase – January 2019 through august 2019

+ construction – September 2019 through august 2021

+ Ready for opening – 2021-2022

sy

Board of education renovations at

westwood

2021 upon near completion of township complex constructionSlide10

Demolition of former schools

late 2021 through mid summer 2022

Administration centerCrestwoodFranklinMcKinley

northwood

Oakwood

Prospect

windsor