Download The PPT/PDF document "RFD Pre-Series Prototype Cryomodule" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
RFD Pre-Series Prototype Cryomodule
Concept Design Study
Niklas Templeton
RFD Pre-Series Update
-
CC Coordination Meeting - 18/8/17
Slide2RFD Dressed Cavity Status
Fixed from RFD SPS Concept:
Cavity
Cold Magnetic Shield
To be updated from SPS Cryomodule:
Helium Tank
FPCTunerHOM CouplerRF ProbeNew Design Requirements:2nd Beam Pipe + Screen
RFD Pre-Series Update - Niklas Templeton - CC Coordination Meeting - 18/8/17
2
Slide3Cavity String Equipped
Taken
from
RFD SPS Concept Cryomodule:
FPC Distance 1050 mm?
Updated:
Inter-Cavity ConnectionCold-Warm TransitionsInterlocks & OVC InterfaceTo be Added/Updated:Internal Vacuum Instrumentation*
2-Phase Line Compatible for LHCSupport & Alignment System
Obsolete:
BCAM System
RFD Pre-Series Update - Niklas Templeton - CC Coordination Meeting - 18/8/17
3
Slide4Cold Warm Transitions
DQW CWT
RFD CWT Options
Combined
Separate
Warm Module Bellows
Simplified Representation
Transition length taken from RFD SPS
Additional 115 mm for Gate Valve Integration
RFD Pre-Series Update - Niklas Templeton - CC Coordination Meeting - 18/8/17
4
Slide5Gate Valve Integration & Vacuum Vessel Interface RFD Pre-Series Update - Niklas Templeton - CC Coordination Meeting - 18/8/17
5
Outer Valve Assembled 1st
Pre-assembled before cavity string connection
Geometry optimised to minimise interface size
*Manufacture to be discussed
OVC Interface 540 x 440 mmAdditional port requires welding
Gate Valve Interface
DQW Interlock
Slide6Cryomodule IntegrationRFD Pre-Series Update - Niklas Templeton - CC Coordination Meeting - 18/8/17
6
Fixed from RFD SPS Concept Cryomodule:
Transverse Spatial Constraints?
Updated:
Thick Walled Vessel + Window Size
Length & Geometry for IntegrationLength Increase 2800 >> 3200To be Added/Updated:Vertical Limits - Top & BottomTop Limit set by FPC DesignRF Lines
FSIThermal Shield & MLI
Warm Magnetic Shield
Obsolete:
BCAM System