LBDS-MKB Control Upgrades - PPT Presentation

During EYETS 20162017 MKD generator meeting MKB upgrade plan 08112016 Upgrades planned Deployment of IPOC on MKBH Generators Addition of retrigger for GTO stack in MKBH Generators Problem of coupling trough retrigger lines ID: 802904

trigger mkbh stack gto mkbh trigger gto stack retrigger current ipoc pickup generators problem case production coupling signal time

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "LBDS-MKB Control Upgrades" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

LBDS-MKBControl UpgradesDuring EYETS 2016-2017

MKD generator meeting : MKB upgrade plan

08.11.2016

Slide2

Upgrades plannedDeployment of IPOC on MKBH GeneratorsAddition of retrigger for GTO stack in MKBH

Generators

Problem of coupling trough retrigger lines

Slide3

IPOC on for MKBH GeneratorsCapture of the following signals using PTC trigger:CTs1 = GTO stack current pickup

CTs2 = GTO stack

snubber

current pickup

PTM1 current pickup

PTM2

current

pickup

Reusing same Hardware and Software as MKD-Generators IPOC

Perhaps some signal analysis algorithm to adapt…

Slide4

IPOC on 8 MKBH Generators - Procurement8 KISS-4U computers provided by BE/CO

Availability confirmed by BE/CO

Installation of Timing on 8 MKBH control racks

Need confirmation from BE/CO.

Installation of Ethernet on 8 MKBH control racks

Work was planned for LS2, informed EN/EL of the urgent need.

Order 8

digitisers

Spectrum M2i.3013

To be done, delivery time usually 6 weeks.

Production of Signal Level Adapter (SLA) cards and front panel

Need to contact TE-MPE for urgent production of existing product.

Production of Trigger Interface and Watchdog Interface (TIWI) cards and front panel

Also TE-MPE, but optional

.

Slide5

Retrigger for GTO stack in MKBH GeneratorsMKB GTO stack are not retriggered in case of self trigger.

PTM do not send Power Trigger to the GTO in case of self trigger = GTO stack is broken

PTC trigger output not activated in case of self trigger = No IPOC trigger.

We have to implement a retrigger of MKBH GTO stack!

Proposed solution:

Used the second current pickup on GTO stack

snubber

circuit.

Inject this signal through passive

electronique

into the PTU, in parallel with retrigger line.

Definitive solution to be designed and tested in JU1 test bench…

Slide6

Problem of coupling trough retrigger linesWe discovered that a self trigger of one MKBH generates noise on the retrigger line

Other MKBH (1-2 ?) could be triggered at the same time = We loose up to 3 MKBH !

We are trying to reproduce the problem on the JU1 test bench.

We see already that the top part of the generator jump by ~70V when pulsing at 6.5

TeV

.

Coupling to other generators is not yet understood, under investigation…

Decision to perform changes on the retrigger lines during EYETS to be evaluated, depending on what

we find…