Pedestrian Crossings Yue Danny Wang wangyue3huskyneuedu supervised by Prof Peter Furth What HCM says Source HCM 2000 Chapter 18 Pedestrians have to cross more than one stage and wait for a WALK in each ID: 643247

stage crossing plan boston crossing stage boston plan lag lead street bikes wbl ebl calculation signal diagonal walk cross

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Delay Estimation of Multi‐Stage" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Delay Estimationof Multi‐Stage Pedestrian Crossings

Yue (Danny) Wangwang.yue3@husky.neu.edusupervised by Prof. Peter FurthSlide2

What HCM says?

Source: HCM 2000, Chapter 18.Slide3

Pedestrians have to cross more than one stage and wait for a WALK in each stage.

But, what if…

Diagonal crossing.

Which way? A-B-C or A-D-C ?

Bikes

making two-stage (pedestrian-style) left turns are sometimes allowed to follow one direction only.

There is more than one WALK interval per signal cycle.

Crossing Boylston Street

@

Charlesgate

West, BostonSlide4

Intuitive and Numerical!Slide5

Build a Tool

Research

Engineering

CommunitySlide6

Northeastern UniversityPed

& Bike Crossing Delay Calculator

‘Diagonal Crossing’

accounts for the situation where pedestrians or bikes need to cross the intersection diagonally, and therefore make a two-stage crossing, with path choice

.

‘Multi-stage Crossing’

accounts for the crossing where pedestrians or bikes have to cross many stages and wait for WALK interval during each stage

.Slide7

Calculation Example:

A two-stage crossing

Intersection Layout

Signal Timing Plan

St

. Paul

Street @ Beacon Street in Brookline, MASlide8

Calculation ReportSlide9

Calculation Example: Diagonal

crossing

Intersection Layout

Signal Timing PlanSlide10

Calculation ReportSlide11

Short Cyclewith Offset Crossing

Phases

Existing plan.

Proposed plan.

Huntington Ave. @ Opera Pl, Boston, MA.

SB

94s

66s

NB

SB

30s

29s

NBSlide12

Re-service for

Short Crossings

Existing plan.

Proposed plan.

Crossing Boylston St

. @

Charlesgate

West, Boston, MA.

SB

68s

41s

NB

SB

36s34sNBSlide13

Lead-Lag Sequencing to FacilitateTwo-Way Pedestrian

Progression

Lead-Lead (EBL-WBL

)

Lag-Lag (EBL-WBL

)

Lead-Lag

(EBL-WBL)

Lag-Lead

(EBL-WBL)

St. Paul Street @ Beacon Street, Boston, MA

SB

61.4

31.8

SB

NB

31.8

61.4

NB

SB

31.4

66.4

SB

NB

66.4

31.4

NB

SB

41.4

41.4

SB

NB

16.2

16.2

NB

SB

16.2

16.2

SB

NB

41.4

41.4

NBSlide14

Single Stage Crossing for Bikes with Multi-Stage Crossing for

Peds

Riverway

, Landmark, Boston, MA.

123s WB

124s EBSlide15

Single Stage Crossing for Bikes with Multi-Stage Crossing for

Peds

Riverway

, Landmark, Boston, MA.

38s WB

38s EB

44s WB

45

s EBSlide16

Lead-Lag Sequencing to FacilitateTwo-Stage Cyclist Left Turns

EBT

NBTSlide17

Thank You!Northeastern University Ped & Bike Crossing Delay Calculatorand related files could be downloaded at: