MTA Capital Construction MTA Capital Construction

MTA Capital Construction - PowerPoint Presentation

danika-pritchard
danika-pritchard . @danika-pritchard
Follow
404 views
Uploaded On 2018-03-21

MTA Capital Construction - PPT Presentation

0 NEW YORK BUILDING CONGRESS MEETING NOVEMBER 13 2014 MTA Capital Construction 1 UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS Presented by David K Cannon Sr Director and Chief Procurement Officer ID: 659276

capital construction mta structures construction capital structures mta contract avenue 2015 project harold tunnel elements caverns work gct scope

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "MTA Capital Construction" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

MTA Capital Construction

0

NEW YORK BUILDING CONGRESS MEETING

NOVEMBER 13

,

2014Slide2

MTA Capital Construction

1

UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS

Presented by

David K. Cannon

Sr. Director and Chief Procurement Officer

Law and Procurement DepartmentSlide3

FORECAST

SOLICITATION SCHEDULE

2015

CM007

Manhattan GCT Caverns, ESA Project

Contract

Range: Over $100M

Anticipated Solicitation Release : January 2015

Contract Duration 40

Months

CH057 Harold Structures – Part 3A, Westbound Bypass and D Approach Tunnel, ESA Project

Contract

Range:

$

50M - $100M

Anticipated Solicitation Release

:

January 2015

Contract

Duration

24

Months

CH058 Harold

Structures – Part

3B,

Eastbound

Reroute

and D Approach Tunnel,

ESA Project

Contract Range:

Over

$100M

Anticipated Solicitation Release :

September 2015

Contract

Duration

40

MonthsSlide4

CH057

Harold Structures – Part 3A

Eastbound Bypass and D Approach TunnelEast Side Access Project

Scope of Work

This Contract is for earth and site work, utility relocations, track realignment, drainage, hazardous material abatement, demolition of existing structures and construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens. The major scope elements

include:

Construction

of the new Mainline

48

th

Street Bridge

Installation of Retaining Walls

Construction of the loop box structure extension and retaining wallConstruction of the Tunnel D Pit and Approach StructureConstruction of Catenary Structures Installation of monitoring devices for existing structures and ground conditions

MTA Capital Construction

3Slide5

CM007

GCT Caverns

East Side Access Project

Scope of WorkThis Contract shall be responsible for the construction of final concrete structures and tunnel linings in the new LIRR Grand Central Terminal Caverns. The

major scope elements include :Construction of the new LIRR GCT Concourse

Intermodal

Connections and Interfaces with MNR’s GCT including dining concourse, 45

th

street cross passageway, 47

th

street cross

passageway

44

th Street Ventilation Facility and 50th Street Ventilation Facility Fit-OutInstallation of elevators and escalators using the designated VM014 subcontractorLocal station testing of GCT concourse and caverns

MTA Capital Construction

4Slide6

CH058

Harold Structures – Part

3B

Eastbound Bypass and D Approach TunnelEast Side Access Project

Scope of Work

Earth

and site work, utility relocations, track realignment, drainage, hazardous material abatement, demolition of existing structures and construction of new heavy civil structures within the LIRR Harold

Interlocking

located in Queens. The major scope elements

include:

Hazardous material abatement, demolition and removal of an existing Substation

Construction of

a new underground East Bound By-pass Tunnel and approach structures for the new B/C and D

TunnelsExtension of existing bridges and underpass structures

Installation of new retaining walls, catenary/utility tower foundations and poles, access roads,

and demolition

and removal of abandoned utility

structures

N

ew

track structures shall include the installation of direct fixation track, traction power, lighting, stand pipe and fire protection

systems

MTA Capital Construction

5Slide7

CM007 GCT Caverns

Work was originally part of Contract CM012R which was split into several packages.

This is the last of the CM012R work.

Several Contractor Outreach Sessions were held.

Based on industry input, several changes were made to the design

The August 7, 2014 Outreach Presentation which provided an overview of the Contract and the revisions is available through a link on the MTACC Procurement Page at

http://web.mta.info/capconstr/procurement/cc_solicitations.htm

MTA Capital Construction

6Slide8

2015 – 2019 Proposed Capital Program

East Side Access - $2.572B

The proposed 2015-2019 Capital Program will complete the construction of ESA to enable revenue service by December

2022. Elements of project management, design, construction management, and insurance necessary

to support

construction as well as support to testing and commissioning are also funded. The program includes

the following

major construction elements:

• Construction

of Manhattan Caverns.

Reconfiguration of the Harold Interlocking and yard lead.

Construction of a mid-day storage yard in Queens for rolling stock. • Construction of a new entrance for LIRR customers at Grand Central Terminal. • Procure, fabricate, install, test and commission communication, controls, security, fire detection, tunnel. • Procurement and installation of traction power equipment.

• Procurement of electric rail cars for opening day

MTA Capital Construction

7Slide9

2015 – 2019 Proposed Capital Program

Second Avenue Subway (Phase II) - $

1.535B

The

proposed 2015-2019 Capital Program includes tunneling from the Phase 1 terminus north of 96th St. and Second

Avenue to 125th St. and 5th Avenue. All elements of project management, design,

construction management

, insurance, and real estate necessary to support construction are also funded. The balance of

the work

necessary for operation will be funded in future capital programs.

In

its entirety, SAS Phase 2 will complete the full project’s East Harlem segment. Its alignment will run under

Second Avenue

to 120th St., then will turn west along 125th St., crossing Lexington Avenue and ending at 5th Avenue to accommodate storage tracks. SAS Phase 2 will utilize a tunnel section built in the 1970s from 110th St. to 120th St.and will be outfitted with tracks and other essential equipment. Three new stations will also be constructed at 125thSt.,116th St., and 106th St.

The completion of SAS Phase 2 will support two major objectives of the Second Avenue Subway Master Plan: alleviate the passenger congestion of the Lexington Avenue Line and provide an intermodal connection with

Metro-North

Railroad at the 125th St. and Park Avenue Station.

MTA Capital Construction

8Slide10

Where Can I find Information on

Available Solicitations?

MTACC

solicitations that require advertisement are advertised

on the MTA Website (http://www.mta.info), in the New York Post (usually Thursday

edition), New

York State Contract

Reporter and Engineering News Record.

MTA Capital Construction

9Slide11