Download Presentation The PPT/PDF document "MTA Capital Construction" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
MTA Capital Construction
0
NEW YORK BUILDING CONGRESS MEETING
NOVEMBER 13
,
2014Slide2
MTA Capital Construction
1
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Presented by
David K. Cannon
Sr. Director and Chief Procurement Officer
Law and Procurement DepartmentSlide3
FORECAST
SOLICITATION SCHEDULE
2015
CM007
Manhattan GCT Caverns, ESA Project
Contract
Range: Over $100M
Anticipated Solicitation Release : January 2015
Contract Duration 40
Months
CH057 Harold Structures – Part 3A, Westbound Bypass and D Approach Tunnel, ESA Project
Contract
Range:
$
50M - $100M
Anticipated Solicitation Release
:
January 2015
Contract
Duration
24
Months
CH058 Harold
Structures – Part
3B,
Eastbound
Reroute
and D Approach Tunnel,
ESA Project
Contract Range:
Over
$100M
Anticipated Solicitation Release :
September 2015
Contract
Duration
40
MonthsSlide4
CH057
Harold Structures – Part 3A
Eastbound Bypass and D Approach TunnelEast Side Access Project
Scope of Work
This Contract is for earth and site work, utility relocations, track realignment, drainage, hazardous material abatement, demolition of existing structures and construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens. The major scope elements
include:
Construction
of the new Mainline
48
th
Street Bridge
Installation of Retaining Walls
Construction of the loop box structure extension and retaining wallConstruction of the Tunnel D Pit and Approach StructureConstruction of Catenary Structures Installation of monitoring devices for existing structures and ground conditions
MTA Capital Construction
3Slide5
CM007
GCT Caverns
East Side Access Project
Scope of WorkThis Contract shall be responsible for the construction of final concrete structures and tunnel linings in the new LIRR Grand Central Terminal Caverns. The
major scope elements include :Construction of the new LIRR GCT Concourse
Intermodal
Connections and Interfaces with MNR’s GCT including dining concourse, 45
th
street cross passageway, 47
th
street cross
passageway
44
th Street Ventilation Facility and 50th Street Ventilation Facility Fit-OutInstallation of elevators and escalators using the designated VM014 subcontractorLocal station testing of GCT concourse and caverns
MTA Capital Construction
4Slide6
CH058
Harold Structures – Part
3B
Eastbound Bypass and D Approach TunnelEast Side Access Project
Scope of Work
Earth
and site work, utility relocations, track realignment, drainage, hazardous material abatement, demolition of existing structures and construction of new heavy civil structures within the LIRR Harold
Interlocking
located in Queens. The major scope elements
include:
Hazardous material abatement, demolition and removal of an existing Substation
Construction of
a new underground East Bound By-pass Tunnel and approach structures for the new B/C and D
TunnelsExtension of existing bridges and underpass structures
Installation of new retaining walls, catenary/utility tower foundations and poles, access roads,
and demolition
and removal of abandoned utility
structures
N
ew
track structures shall include the installation of direct fixation track, traction power, lighting, stand pipe and fire protection
systems
MTA Capital Construction
5Slide7
CM007 GCT Caverns
Work was originally part of Contract CM012R which was split into several packages.
This is the last of the CM012R work.
Several Contractor Outreach Sessions were held.
Based on industry input, several changes were made to the design
The August 7, 2014 Outreach Presentation which provided an overview of the Contract and the revisions is available through a link on the MTACC Procurement Page at
http://web.mta.info/capconstr/procurement/cc_solicitations.htm
MTA Capital Construction
6Slide8
2015 – 2019 Proposed Capital Program
East Side Access - $2.572B
The proposed 2015-2019 Capital Program will complete the construction of ESA to enable revenue service by December
2022. Elements of project management, design, construction management, and insurance necessary
to support
construction as well as support to testing and commissioning are also funded. The program includes
the following
major construction elements:
• Construction
of Manhattan Caverns.
•
Reconfiguration of the Harold Interlocking and yard lead.
•
Construction of a mid-day storage yard in Queens for rolling stock. • Construction of a new entrance for LIRR customers at Grand Central Terminal. • Procure, fabricate, install, test and commission communication, controls, security, fire detection, tunnel. • Procurement and installation of traction power equipment.
• Procurement of electric rail cars for opening day
MTA Capital Construction
7Slide9
2015 – 2019 Proposed Capital Program
Second Avenue Subway (Phase II) - $
1.535B
The
proposed 2015-2019 Capital Program includes tunneling from the Phase 1 terminus north of 96th St. and Second
Avenue to 125th St. and 5th Avenue. All elements of project management, design,
construction management
, insurance, and real estate necessary to support construction are also funded. The balance of
the work
necessary for operation will be funded in future capital programs.
In
its entirety, SAS Phase 2 will complete the full project’s East Harlem segment. Its alignment will run under
Second Avenue
to 120th St., then will turn west along 125th St., crossing Lexington Avenue and ending at 5th Avenue to accommodate storage tracks. SAS Phase 2 will utilize a tunnel section built in the 1970s from 110th St. to 120th St.and will be outfitted with tracks and other essential equipment. Three new stations will also be constructed at 125thSt.,116th St., and 106th St.
The completion of SAS Phase 2 will support two major objectives of the Second Avenue Subway Master Plan: alleviate the passenger congestion of the Lexington Avenue Line and provide an intermodal connection with
Metro-North
Railroad at the 125th St. and Park Avenue Station.
MTA Capital Construction
8Slide10
Where Can I find Information on
Available Solicitations?
MTACC
solicitations that require advertisement are advertised
on the MTA Website (http://www.mta.info), in the New York Post (usually Thursday
edition), New
York State Contract
Reporter and Engineering News Record.
MTA Capital Construction