Implementation DesignatingTerminating Fleet vs Unit Scheduling Rights Tagging with NITS on OASIS Implementation Timeline Questions Agenda 2 DesignateTerminate Fleet vs Unit 3 Must specify a Gen Group ID: 617842
Download Presentation The PPT/PDF document "NITS on OASIS" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
NITS on OASIS
ImplementationSlide2
Designating/Terminating Fleet vs Unit
Scheduling Rights
Tagging with NITS on OASIS Implementation TimelineQuestionsAgenda2Slide3
Designate/Terminate Fleet vs Unit
3
Must specify a Gen GroupSlide4
Designate/Terminate Fleet vs Unit
4
Specify Gen Group name here Slide5
Designate Fleet vs Unit
5
Gen Group or unit name here
And hereSlide6
Terminate Fleet vs Unit
6
Gen Group resource or unit
Resource here
And hereSlide7
An additional form is available on the Add DNR template that allows for the specification of Scheduling
Rights
In general, Scheduling Rights should not be specifiedSCE&G has implemented a process whereby Scheduling Rights are automatically createdThe Scheduling Rights capacity will be equal to the amount of the DNR capacityTherefore SCE&G does not require nor expect customers to submit Scheduling Rights requestsIf submitted, the request will be set to Invalid
Scheduling Rights
7Slide8
Tagging DNRs
Source:
Sink: Must match sink in NITS Load templateOwner: Must match Customer or Agent code in NITS ApplicationOASIS: DNR – NITS Application reference number Secondary – OASIS Assignment reference numberNITS Resource: DNR – Must match Resource Name in NITS DNR template Secondary – blank
MW: Must be equal to or less than MW capacity designated in NITS DNR or Secondary template
8Slide9
March 1 is deadline
Will begin transitioning customers over to NITS next week (2-13)
Once NITS implemented, old Network TSRs will be disabledTaken out of ATC calculation and capacity recalledAt some point, they will be more permanently ended to clean things upOnce switched over to NITS, please ensure all personnel doing Tagging have been notified of the switchImplementation Timeline and Mechanics
9Slide10
QUESTIONS?
10