February 2016 Town of Discovery Bay CA 2373 Days of Safe Operations 107602 worked hours since last recordable incident Safety Hours West Monthly Regional Safety Webinar Weekly Safety ID: 640411

avg monthly total water monthly avg water total wastewater coli safety tss amp report discharge bod5 daily flow service

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "MONTHLY OPERATIONS REPORT" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

MONTHLY OPERATIONS REPORTFebruary 2016

Town of Discovery Bay, CA2373 Days of Safe Operations107,602 worked hours since last recordable incident Slide2

Safety

Hours

West Monthly Regional Safety Webinar

Weekly Safety TopicsLockout/Tagout 4.0Operations None

TRAINING

:

Safety, Operations, & EquipmentSlide3

Monthly Discharge Monitoring Report (DMR)Monthly electronic State Monitoring Report (eSMR)

Monthly Coliform Report, California Department of Public Health (CDPH) REPORTS SUBMITTED TO REGULATORY AGENCIESSlide4

# of

Active Wells

Water Produced

(MG)Chemical (Hypo) DeliveredFire Hydrant Flushing539 8950

WATER SERVICES

Note

:

Well 5 is off line, Replaced by Well #7

2013 Water Production

Table (MG

) by Month

JanuaryFebruaryMarch AprilMayJune4039JulyAugustSeptemberOctoberNovemberDecember

Bacteriological Test Results:

Routine Bacteria

Samples Collected

No. Total Coliform

Positives

No. Fecal/E. coli

Positives

Brown Water

Calls

16

0

0

0Slide5

WATER SERVICESSlide6

Water ReductionSlide7

Water Reduction at Wastewater PlantReused #3 Water

:2.0 MG – January2.2 MG- FebruarySlide8

 

WW Effluent

Parameter

 PermitLimits JanuaryLab Data FebuaryLab DataFlow, MG Effluent, monthly total

--------------------

36

32

Flow, MG Daily

Influent

Flow,

avg

.N/A1.31.2Flow, MG Daily Discharge Flow, avg. 2.1 1.21.1Effluent BOD5, lbs/d, monthly avg.3505446Effluent TSS, lbs/d, monthly avg.5255736Effluent BOD5, mg/L, monthly avg.20

6

5

Effluent TSS, mg/L,

monthly avg.

30

6

4

Total Coli form 7 day Median Max

2380Total Coli form Daily Maximum24052% Removal BOD5, monthly avg.85% min.9798% Removal, TSS, monthly avg.85% min.9397Electrical Conductivity, umhos/cm annual avg.210020602060

WASTEWATER SERVICE

Wastewater Laboratory AnalysisSlide9

National Pollution Discharge Elimination System (NPDES)

WASTEWATER SERVICE

NPDES Related

ExcursionsPermit Parameter NPDES Parameter Limit Actual ParameterResult0N/AN/A

N/A

Bacteriological Test Results:

Routine Bacteria

Samples Collected

No. Total Coliform

Positives

No. Fecal/E. coli

Positives7-Day Median Excursion12003# of ActiveLift Stations# of InactiveLift StationsSSOWastewaterReceived (MG)150032.3Slide10

Flushing resumed 21,315 ft. CCTV 34,086

ft.Inspected 77 manhole & covers. Performed weekly lift station inspections.WASTEWATER SERVICE

COLLECTION:Slide11

Preventive and Corrective

GENERAL TRACKING INFO

Total # of WO’s Completed

Total Hours273325Work Order Back-LogAging 8 - 30 Days Aging > 30 Days28

7

Call & Emergency Responses

Call Outs

Emergencies

1

 

0Personnel Hours & Overtime: Regular HoursOvertime134437Slide12

WWTP

WASTEWATER TREATMENT PLANT WTP WATER TREAMENT PLANT

 

WL WILLOW LAKE NP NEWPORT  VFD VARIABLE FREQUENCY DRIVE WO WORK ORDER PLC PROGRAMMABLE LOGIC CONTROLLER L/S LIFT STATIONSSO SANITARY SEWER OVERFLOW BOD BIOLOGICAL OXYGEN DEMAND TSS TOTAL SUSPENDED SOLIDS MGD MILLION GALLONS PER DAY mg/l MILLIGRAMS PER LITRE CCTV CLOSED CIRCUIT TELEVISION PPM PARTS PER MILLION RAS RETURN ACTIVATED SLUDGE WAS WATSE ACTIVATED SLUDGE

 

UV

ULTRAVIOLET LIGHT

TERMSSlide13

PLANT 2