GIS In Water Resources  C  E 394K Impact of Floods to the Bridge Deterioration Process GIS In Water Resources  C  E 394K Impact of Floods to the Bridge Deterioration Process

GIS In Water Resources C E 394K Impact of Floods to the Bridge Deterioration Process - PowerPoint Presentation

jane-oiler
jane-oiler . @jane-oiler
Follow
343 views
Uploaded On 2019-11-03

GIS In Water Resources C E 394K Impact of Floods to the Bridge Deterioration Process - PPT Presentation

GIS In Water Resources C E 394K Impact of Floods to the Bridge Deterioration Process The case of Onion Creek Oscar Galvis Nov 22 th 2016 Problem Floods Impact Bridge Natural Deterioration ID: 762722

height bridge deterioration floods bridge height floods deterioration information inundation maximum results case onion hydrologic due analysis bridges impacts

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "GIS In Water Resources C E 394K Impact..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

GIS In Water Resources C E 394KImpact of Floods to the Bridge Deterioration Process – The case of Onion Creek Oscar Galvis Nov 22 th 2016

Problem: Floods Impact Bridge “Natural” Deterioration Overtopping Impacts on Piers and abutments And a lot more!

Methodology Bridge Deterioration Due to Floods Hydrologic Information Bridge Inventory HAND Analysis Assess Impacts on Bridges Estimate Economic Impact LIDAR Information

Case Study: Onion Creek

Inputs Bridge Inventory Lidar Information (Thanks to Lukas Godbout) Height of the Bridges Hydrologic InformationNHD flowlines Maximum flowWright et al. (2012) Potential Maximum Flow for 2100

Bridge Deterioration Due to Floods Overtopping Inundation height is 90% or more of bridge structure height Treatment: Replacement Erosion of Piers Base Inundation height between 70% - 90% of bridge structure heightTreatment: Increase footing depth

Results N

Results Bridge Height = 12 ft

Results Inundation Height based on Maximum Flow = 14.2 ft

Moving Forward Automate analysis for more catchments