in Downtime via Interlocking Date 3 rd March 2012 A tripping occurred since the Areva panels had a tripping command system if the DC supply failed This was removed by removing that function from the panel and a alarm using a contractor with a reset operation was ID: 308419
Download Presentation The PPT/PDF document "Reduction" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Reduction in Downtime via Interlocking
Date: 3rd March 2012
A tripping occurred since the Areva panels had a tripping command system if the DC supply failed.This was removed by removing that function from the panel and a alarm using a contractor with a reset operation was madeFor future purposes a downtime of 60 minutes was avoided.
1Slide2
How did the failure happen?
2Slide3
K1 (N.C.)
Push Button
(
N.O)
K2 (N.O
.)
a1
b1
g
h
K2
K1
MCB
Output
Fed by
UPS Power
Hooter
SLD of the Hooter Circuit
K1 (N.C.)
K2 (N.C.)
e
f
e1
f1
Fed by
UPS Power
3Slide4
Load loss per hour
70,000
INRBreakdown on transmission line will create breakdown for hours:60
minutes
Total savings
70,000.00
INR
Savings Calculations
Now if the DC fails the Hooter will show the fault.
There is also a ‘Reset Button’ to accept the fault and bring it back to normal condition.
This is not a one time saving it is applicable for the future also.
Now Downtime of Unit 1, 2, 5 and
Gyaanpeeth
from DC failure can be avoided.
Hooter would run and action can be taken in time.
*
This is not a one time saving. For future there will be no downtime due to this reason.