Region 8 Bridge Replacement 1 Monday, September 18, 2017 Project Location Region 8 Bridge Replacement 1 Monday, September 18, 2017 Project Location

Region 8 Bridge Replacement 1 Monday, September 18, 2017 Project Location - PowerPoint Presentation

karlyn-bohler
karlyn-bohler . @karlyn-bohler
Follow
343 views
Uploaded On 2019-10-31

Region 8 Bridge Replacement 1 Monday, September 18, 2017 Project Location - PPT Presentation

Region 8 Bridge Replacement 1 Monday September 18 2017 Project Location Replacement of East 3rd St Bridge over Hutchinson River and Parkway project Initiated by the New York State Department of Transportation to improve and maintain uninterrupted movement mobility and connectivity on East 3rd S ID: 761395

2017 september project tuesday september 2017 tuesday project bridge construction design pelham temporary east stakeholders parkway community vernon engineer

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Region 8 Bridge Replacement 1 Monday, Se..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Region 8 Bridge Replacement 1 Monday, September 18, 2017

Project Location Replacement of East 3rd St Bridge over Hutchinson River and Parkway project Initiated by the New York State Department of Transportation to improve and maintain uninterrupted movement, mobility and connectivity on East 3rd St and Hutchinson River Parkway. Tuesday, September 19, 2017 2

Project Team Introduction, Roles & responsibilities Tuesday, September 19, 2017 3

NYSDOT Leadership Regional Construction Engineer: Scott Geiger Regional Design Engineer: Mike SchaeferProject Manager: Mahmoud AhmedConstruction QA Engineer: Jason HiltonGina DiSarro: Public Information Officer Tuesday, September 19, 2017 4

EE Cruz/Hardesty and Hanover Design Build Team Design Build Project Manager: Jeff Maffei (EE Cruz) Design Manager: David DeLuca (Hardesty and Hanover)Resident Engineer: Mike McBride (HVEA)Community Liaison: Nora Madonick (ASC) Tuesday, September 19, 2017 5

Why is the Project Needed? Existing bridge (constructed in 1927) is vulnerable to scour as it was not built on piles or founded on sound rock. Scour could lead to failure of this bridge. The parkway carries over 100,000 vehicles per day and is currently flooded by the Hutchinson River during a 5 year storm event instead of 25 year event. Tuesday, September 19, 2017 6

Coordination with Stakeholders Serval meetings conducted during the Project Development Phase with municipalities, Pelham Schools and emergency services from Pelham, Mt Vernon and Pelham Manor Stakeholders were involved in the development of the project requirements for the design built contract Design Build contract procurement process incorporated inputs from stakeholders and valued proposals with least impact to commuters and local communities. Tuesday, September 19, 2017 7

Stakeholders requested: Two way of traffic on East 3rd St/Boulevard by means of temporary bridge during construction Coordination with other Projects in the areaPelham Police enforcement to assist Pelham schoolsReducing impact of construction activities (noise, dust, utility outages, rodent control, materials delivery routes) Fulltime community liaison Tuesday, September 19, 2017 8

Proposed East 3 rd St Bridge Tuesday, September 19, 20179

Proposed Parkway Flooding Control

Floodwall Tuesday, September 19, 2017 11

Temporary Bridge Tuesday, September 19, 2017 12 GENERAL PLAN GENERAL ELEVATION

Temporary Bridge Tuesday, September 19, 2017 13 TYPICAL CROSS SECTION

Temporary Bridge Tuesday, September 19, 2017 14

Temporary Bridge Tuesday, September 19, 2017 15

East 3rd St Bridge Construction ScheduleTuesday, September 19, 2017 16

Parkway Weekend Closures & Detour Directional Closures of the HRP shall be scheduled between Friday at 11 PM to the following Monday at 5:00 AM. The sum of all Directional Closures shall not exceed a maximum of 320 total hours Detour signs and message boards will be in place along the I-95 and I-287 Tuesday, September 19, 2017 17

Construction Noise & Control Pile driving is limited during daytime hours only (8 AM to 4 PM) and will be completed within approximately 2 weeks Noise monitoring devices will be install to ensure equipment is working within acceptable noise limits. Dust control during demolition activities Tuesday, September 19, 2017 18

Trucking and Delivery Routes Trucking and Materials delivery route will utilize Columbus and Lincoln Ave in Mt Vernon during non rush hours Will utilize grass area next to Exit 10 off ramp in Mt Vernon as Staging area for equipment needed for scheduled activities Environmental procedures will be in place to insure minimum disturbance to residence and community Tuesday, September 19, 2017 19

Electric and Gas Outage Existing bridge carries gas main and electric conduits ConEd will upgrade their facilities as part of this project. New gas main and electric conduits will be installed below the HRP Limited outages is necessary for tie in and switch to new systemNotifications will be send out two weeks in advance Tuesday, September 19, 2017 20

Outreach – Process for Success Leveraging partnerships with stakeholders, including schools, municipalities and emergency services Identifying opportunities for enhanced outreach and support such as with the Pelham School District Meetings, materials and tactics follow detailed schedule (Public Notification Plan) in advance of construction startEngagement efforts continue until project completion Tuesday, September 19, 2017 21

What We’ve Done Inclusive, meaningful outreach begins at project start: Public meetings – Pelham and Mount Vernon More than 39,000 postcards mailed to affected residents in both communities Print and digital advertisements Press releases and travel advisories Tuesday, September 19, 2017 22

What We Will Do On-site community liaison Project hotline Construction updates, press releases and travel advisories Project website information and updates can be found online at www.dot.ny.gov/projects by searching Project Identification Number 8BOW0F Tuesday, September 19, 2017 23

Questions Tuesday, September 19, 2017 24

Thank you! Tuesday, September 19, 2017 25