Targo Kalamees, Kalle Kuusk, TUT. H2020 MORE-CONNECT. 1st Meeting (Kick-off) . 2015 January 12 and 13. General description. Prefabricated concrete large panel element. Typical soviet series apartment building:.

Embed :
Presentation Download Link

Download Presentation - The PPT/PDF document "Pilot renovation project in Estonia" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Pilot renovation project in Estonia






Presentation on theme: "Pilot renovation project in Estonia"— Presentation transcript:

Slide1

Pilot renovation project in EstoniaTargo Kalamees, Kalle Kuusk, TUT

H2020 MORE-CONNECT1st Meeting (Kick-off) 2015 January 12 and 13Slide2

General description

Prefabricated concrete large panel element

Typical soviet series apartment building:solutions and results are easily to disseminateConstruction date 1986Number of stories 5Net area 3824 m2Heated area 3306 m2 Living area 2769 m2Number of apartments 80Slide3
Slide4

Current energy use (HDDTallinn = 4220 ºC∙h)

2008

20092010AverageDelivered energy, kWh/(m2·a)

Space heating126116150131

Domestic hot water107938595Electricity

54

46

46

48

Primary energy, kWh/(m

2

·a)

 

318

280

303

300

New building

Low en. building

nZEB

Major renovation

100

101… 120

121… 150

151… 180

181… 220

221… 280

281… 340

341

Primary energy,

kWh/(m

2

·a) Slide5

Preliminary estimation about renovation solution

Building envelope:Exterior wall: U0,12 W/(m2K)

Basement wall: U0,17 W/(m2K)Roof: U0,10 W/(m2K)Windows: U0,80 W/(m2K)Basement ceiling: U0,26 W/(m2K)Insulation of loggias  interior heated areaVentilation: balanced ventilation with HR in each apartmentHeating: radiators, thermostats, renovation of heat centreSolar collectors for DHV on roofPV for electricity on facadesMORE-CONNECT engine:in loggia or on roofSlide6

Preliminary

estimation of energy use

Current useStandard useNowMoreCon.

NowMoreCon.Net energy, kWh/(m2·a)Space heating

98199819Ventilation29

1

3

65

1

3

Domestic hot water

95

95

30

30

Appliances

48

48

29

29

Fans, pumps

0

6

0

6

Produced energy on site, kWh/(m

2·a)

Solar collectors (heat)

0

-240

-24PV panels (electricity)0

-50

-5Delivered energy, kWh/(m2

·a)

Space heating

10120

11520Ventilation

3014

6814Domestic hot water

9571

30

6

Appliances

48

43

29

24

Fans, pumps

0

6

0

6

Primary energy, kWh/(m

2

·a)

Energy performance value

313

193

250

96

=

nZEB