PPT-MM detector construction
Author : min-jolicoeur | Published Date : 2016-04-28
One or several modules per sector considerations PCB production PCB material procurement strip pattern coverlay Resistive strip printing Pillars ro panel production
Presentation Embed Code
Download Presentation
Download Presentation The PPT/PDF document "MM detector construction" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
MM detector construction: Transcript
One or several modules per sector considerations PCB production PCB material procurement strip pattern coverlay Resistive strip printing Pillars ro panel production Drift panel production. 山下智弘. JST CREST/. 神戸大学. Borrowing especially from presentations of M. . Asai. (SLAC). Geant4 Tutorial @ Japan 2007. 17-19 Oct, 2007 @ RCNS, based on Geant4 9.0.p01. 1. Outline. Introduction. Choice of assembly procedure. Screwing versus . glueing. Pro’s and con’s . MMM Würzburg, 30/01/2014. P. Ponsot/J. Wotschack. 1. Glueing. or screwing ?. The purpose of this presentation is to introduce the discussion on the first choice that we have to make in order to arrive at an agreed assembly procedure. Brennan Thomason. Tamara Reed. Edmond Wilson. Project Goal. Design a detector for a high resolution spectrograph that provides electromagnetic radiation intensity data as a function of wavelength in the range of 400 nm to 1000 nm.. Daisuke . Tatsumi. National Astronomical Observatory of Japan. TAMA R&D status. LCGT. CLIO. TAMA. Base-line Length. 3 km. 0.1 km. 0.3 km. Seismic Isolator. SAS. Multi Pendulum. SAS. Optical configuration. Lab Methods Day. June 25, 2013. Taylor . Myers. 2. Carbon Monoxide Concentration. % of CO, by volume, in the air. Digital readout. Analog output 0/2/4 to 20 mA. Carbon Dioxide Concentration. % of . CO2, . 2012/3/2. Y.Sugimoto. Background. Request for more space from DESY team. Several installation works in parallel. Depends on total allowed construction perio. d . Design of common cryogenic system. ILD, . Lumi. Blocks. Enrico & . Nicoletta. Lumi. Block (LB). ATLAS data taking runs divided into intervals of time: . Lumi. Blocks. 1 minute long last year. Data events within a LB (should) have been generated with same conditions. Brian . Kross. – mechanical design and construction / gas systems. Seungjoon. Lee – advanced image recon algorithms / mechanical / detectors. John . McKisson. – software / data acquisition / electronics. side. Wago. 2002-1201 . Wago. 2002-3203 . Door open. 800x600x200 mm. 0.93x60 cm. 10 cm. 4.9 cm. 4.9 cm. GSM cable. Gas pipes. ~25cm. ~25cm. NSYS3D8620. Inputs. Outputs. 600. 8. 00. 200. 60cm. 90 ˚ turn. PARAMETERS. The . experimental apparatus includes two main detectors: a silicon vertex tracker (SVT) for . precise momentum vertex determination and . and an electromagnetic calorimeter (. ECal. ) to trigger on . results during isotopic analysis Traditionally it was recodetector with a full width half-maximum FWHMHowever in many cases when using large detectors or when using a short amplifier time constant thi Applying G4beamline. Tom Roberts. Muons, Inc.. June 27, 2011 TJR. 1. Machine-Detector Interface 2. Outline. Quick Introduction to G4beamline. Why use it for MDI simulations. G4beamline Capabilities Relevant to MDI Simulations. Innovative silicon sensors for future trackers. N. . Cartiglia. M. . Mandurrino. INFN - Italy. Part II: Principles of operation of RSD. Single point precision and charge sharing. Signal formation. Charge sharing: RSD master formula. Previous work [1] studied the use of PTP and Synchronous Ethernet (. SyncE. ) for synchronization of detector data from multiple Pixie-Net modules, an earlier and smaller version of the digitizing and pulse processing electronics described here. The time resolution for coincident events reached ~10ns FWHM with PTP synchronization and 200-800ps FWHM with .
Download Document
Here is the link to download the presentation.
"MM detector construction"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.
Related Documents