Download Presentation - The PPT/PDF document "WP3 10 July 2014 QMUL/GAB" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.



Presentations text content in WP3 10 July 2014 QMUL/GAB

Slide1

WP3 10 July 2014 QMUL/GAB

1

Status of Sensor Testing Setup at QMUL

Re-structuring of QMUL Physics & Astronomy

June/July

2013

:

Evacuated Physics

b

uilding and clean room: dis-assembled probing system & moved everything to new clean room.

June 2013 – April 2014.

Clean room air handling fiasco. Apparently fixed now.

3

rd

July

: AJB+GAB started re-assembling

probe

station.

Knock-on effects from building works continue:

(

building

under wraps, camping out

,

interruptions to services

).

Scheduled to re-inhabit offices mid-September.

[My personal reaction to this extensive disruption is quite simply unprintable]

Slide2

WP3 10 July 2014 QMUL/GAB

2

Recently (3rd/4th July)Refurbished cable feedthrough box (seals perished).Unclamped stages, re-attached microscope, camera, vacuum, prober control box.Booted ** Windows2000 ** PC + NUCLEUS prober sofware=> Checked stage motion still working (in general).

Needed, to regain July 2013 status :Run Labview (CAV 2013 vn): Check chuck motion –wafer alignment procedure and strip probe pattern.Check chuck planarity (uniform needle scrub)Re-cable GPIB to instrumentsRe-install blind on cabinet (Jag)(maybe replace video camera. Service Nitrogen generator.… )

Slide3

WP3 10 July 2014 QMUL/GAB

3

Further ahead:Bart’s scheme to speed up probing using probe card / switch matrix.Need new RA + training (GAB thinly spread and ageing).

Further work required in order to scan ATLAS Sensors:

Install CAV/QMUL chuck

adapter

(for ATLAS sensors. Currently at CAV).

Bias and Signal Cables: make/install. (+ Patch panels if necessary)

(trivially) incorporate UPS

Make new bias stand-off box (1000V) for Wayne-Kerr LCR meter. (+ install protection unit).

Check functionality of instruments & strip-checker measurements

At this point we would need an expendable ATLAS sensor to verify / compare results.

Slide4

WP3 10 July 2014 QMUL/GAB

4

Not related to Sensor testing, but need to flag somewhere

Preliminary Thermal simulation of convection in the barrel (Liverpool WP6, 9

th

July)… indicates may be large thermal gradients, dependent on cooling path of DCDC converter. Need a thermal description to understand this better.

Slide5

Slide6

Slide7

Slide8

Slide9

Slide10

Slide11


About DocSlides
DocSlides allows users to easily upload and share presentations, PDF documents, and images.Share your documents with the world , watch,share and upload any time you want. How can you benefit from using DocSlides? DocSlides consists documents from individuals and organizations on topics ranging from technology and business to travel, health, and education. Find and search for what interests you, and learn from people and more. You can also download DocSlides to read or reference later.