1 Status of Sensor Testing Setup at QMUL Restructuring of QMUL Physics amp Astronomy JuneJuly 2013 Evacuated Physics b uilding and clean room disassembled probing system amp moved everything to new clean room ID: 292288

qmul july 2014 gab july qmul gab 2014 2013 wp3 install check chuck room clean cav amp probe atlas

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "WP3 10 July 2014 QMUL/GAB" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

WP3 10 July 2014 QMUL/GAB

1

Status of Sensor Testing Setup at QMUL

Re-structuring of QMUL Physics & Astronomy

June/July

2013

:

Evacuated Physics

b

uilding and clean room: dis-assembled probing system & moved everything to new clean room.

June 2013 – April 2014.

Clean room air handling fiasco. Apparently fixed now.

3

rd

July

: AJB+GAB started re-assembling

probe

station.

Knock-on effects from building works continue:

(

building

under wraps, camping out

,

interruptions to services

).

Scheduled to re-inhabit offices mid-September.

[My personal reaction to this extensive disruption is quite simply unprintable]Slide2

WP3 10 July 2014 QMUL/GAB2Recently (3rd/4th July)Refurbished cable feedthrough box (seals perished).Unclamped stages, re-attached microscope, camera, vacuum, prober control box.Booted ** Windows2000 ** PC + NUCLEUS prober sofware=> Checked stage motion still working (in general).

Needed, to regain July 2013 status :Run Labview (CAV 2013 vn): Check chuck motion –wafer alignment procedure and strip probe pattern.Check chuck planarity (uniform needle scrub)Re-cable GPIB to instrumentsRe-install blind on cabinet (Jag)(maybe replace video camera. Service Nitrogen generator.… )Slide3

WP3 10 July 2014 QMUL/GAB3Further ahead:Bart’s scheme to speed up probing using probe card / switch matrix.Need new RA + training (GAB thinly spread and ageing).Further work required in order to scan ATLAS Sensors:Install CAV/QMUL chuck adapter (for ATLAS sensors. Currently at CAV).Bias and Signal Cables: make/install. (+ Patch panels if necessary)

(trivially) incorporate UPS Make new bias stand-off box (1000V) for Wayne-Kerr LCR meter. (+ install protection unit).Check functionality of instruments & strip-checker measurementsAt this point we would need an expendable ATLAS sensor to verify / compare results.Slide4

WP3 10 July 2014 QMUL/GAB

4

Not related to Sensor testing, but need to flag somewherePreliminary Thermal simulation of convection in the barrel (Liverpool WP6, 9th July)… indicates may be large thermal gradients, dependent on cooling path of DCDC converter.