Planning and Studies Mark JONES CERN Content 27062019 M Jones Geodetic Infrastructure and Alignment FCC Week 2019 FCC ee Planning Requirements amp Constraints Provisional Survey Working Parameters ID: 794298

fcc 2019 infrastructure alignment 2019 fcc alignment infrastructure geodetic start jones week installation reference position monitoring system tunnel ring

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Geodetic Infrastructure & Alignment" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Geodetic Infrastructure & Alignment -Planning and Studies

Mark JONES, CERN

Slide2

Content

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

FCC-

ee

Planning, Requirements & ConstraintsProvisional Survey Working ParametersPosition Monitoring and Alignment SystemGeodetic Infrastructure

2

Slide3

Planning, Requirements

and Constraints

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

3

Slide4

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

4

D. Schulte

Slide5

System Requirements

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

FCC-

ee

Main Ring

Booster Ring

Smallest Misalignment Tolerance

Values to Confirm

Quadrupoles and

Sextupoles

FCC-

ee

Main

Ring: 100

m

m over ~100 m

Booster Ring

: 150

m

m

5

Slide6

FCC-ee Operational Constraints

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Winter

Shutdown

12

to 20

wks

20 days

Machine

Development /

yr

11 days for Technical Stops

Long Shutdown after 9 years

A. Niemi

FCC-

ee

Operation Timeline

6

Slide7

Other Constraints

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Significant tunnel / ground

motion possible

(>1 mm / year in LHC)

Maintenance

Access

Beamline elements

Position Monitoring and

Alignment System

7

Slide8

Provisional Survey Working Parameters

Interpretations &

Assumptions!

To Confirm!!

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Tunnel Alignment Precision Requirement

Main Ring:

~30

m

m

@

1

s

Booster Ring: ~50

m

m @

1

s

Quadrupoles and

Sextupoles

Assembled on a Single Girder

Frequent

position monitoring required

Re-alignment/Smoothing

at least

1 / year

Main Beam arcs => ~12000 beamline modules

Booster arcs => ~10000 beamline modules

8

Slide9

Provisional Survey Working Parameters

Interpretations & Assumptions! To Confirm!!

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Limited time for Survey tunnel activities

During both installation and operation

Maintenance

Access

Cannot disturb any

Survey

Tunnel

Reference

Infrastructure

CDR Position Monitoring and

Alignment Solution

Based on design for CLIC

Consequences for Accelerator Installation

Consequences for Geodesy

9

Slide10

Initial Survey Planning

Costing

 Planning

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

10

Slide11

Position Monitoring and Alignment System

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

11

Slide12

FCC-ee Position Monitoring

&

Alignment

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Concept based on design for CLICFull Remote Position Monitoring

and

Alignment System

Wire

Position

sensors

Hydrostatic Levelling sensors

Motorised

positioning system

Design

for CLIC

12

Slide13

FCC-

ee

Position Monitoring & Alignment

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Precision specifications

Smoothing Time Constraints

Continuous Monitoring

Automated remote re-alignment with

continuous feedback

Metrology precisions for

~6

m long elements

Tunnel Reference Infrastructure

Space requirement in curved tunnels

Full remote maintenance (HL-LHC developments

+ … ??

)

13

Slide14

Alternative -Alignment Train

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Precision specifications

Simulations with available measurement

instruments/sensors

Measurement

platform to be

developed

Vertical measurement

Smoothing Time Constraints

Currently in LHC the reference wire

is installed manually

Re-positioning will have to be automated

Smoothing process typically => 2-3 iterations

4 weeks smoothing =>

currently ~40 alignment trains

Tunnel Reference Infrastructure

Space

requirement in curved tunnels

Motorised positioning system,

remote maintenance

M. Di Castro

14

Slide15

FCC Integrated Project Schedule

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Tunnel Geodetic Reference Network

As-Built Surveys

Gravity Field Measurements

Marking Out

Monitoring & Alignment System

Tunnel Reference

Infrastructure

Position Monitoring instrumentation

Position Alignment equipment

Civil Engineering Works Start

C.E. Construction Invitation to Tender Start

Injector Installation Start

FCC Installation Start

Alignment

15

Slide16

Position Monitoring and Alignment System

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

16

Civil Engineering Works Start

C.E. Construction Invitation to Tender Start

Injector Installation Start

FCC Installation Start

Y

14

Main Ring and Booster Ring

FCC Tunnel Reference

Infrastructure Installation

Start

Slide17

Position Monitoring and Alignment System

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

17

Accelerator Information Required

Theoretical Design

FCC-

ee

Integration Model

Metrology & Alignment Precisions

To be developed

Refined Gravity Field Model

Tunnel Reference Infrastructure

Beamline Elements

Position Monitoring System

Positioning System

Control, Data Management and Data Processing Systems

Injector Installation Start

FCC Installation Start

Main Ring and Booster Ring

FCC Tunnel Reference Infrastructure Installation

Start

Y

14

Slide18

Position Monitoring and Alignment System

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

18

Injector Installation Start

FCC Installation Start

Main Ring and Booster Ring

FCC Tunnel Reference Infrastructure Installation

Start

Y

14

Slide19

Position Monitoring and Alignment System

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

19

Design Concept

Injector Installation Start

FCC Installation Start

FCC Tunnel Reference Infrastructure Installation

S

tart

Y

14

Technical Design & Specifications Start

Pre-Series Upgrade and Tests Start

Y

-2

Pre-Prototype Studies Start

Prototype Development and Tests Start

Y

2

Y

6

Y

9

Market Study/Survey and Invitation to Tender Start

Procurement and Instrumentation Control Start

Y

11

Y

12

Y

-3

Needs Analysis

Main Ring and Booster Ring

Preparatory Activities

Slide20

Position Monitoring and Alignment System

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Tunnel Geodetic Reference Network

Marking Out

Gravity Field Measurements

Install Tunnel Infrastructure

Position

Monitoring and Alignment System

Infrastructure Installation

Metrology Reference

Network

Monitoring System Infrastructure

Positioning System Infrastructure

Install Beamline Elements

Position Monitoring and Alignment System

Installation

Monitoring

Sensors and Commissioning

Positioning

Actuators and Commissioning

Align Beamline Elements

Main Ring and Booster Ring

Installation Activities

20

Slide21

Geodetic Infrastructure

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

21

Slide22

FCC Integrated Project Schedule

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Surface Geodetic Reference Network

Reference Systems

Precision Gravity Field Model

R&D of Geodetic Instruments

Instrument Control Calibration, and Test Facilities

Geodetic Transformation Software

Civil Engineering Works Start

C.E. Construction Invitation to Tender Start

Injector Installation Start

FCC Installation Start

Geodetic Infrastructure

22

Slide23

Geodetic Infrastructure

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Starting almost from scratch

Most geodetic infrastructure

dates back to LEPEstablished for the current

CERN site ~100 km

2

FCC site covers ~1000 km

2

CERN not currently equipped for

this activity

CERN surveyors

Establish control infrastructure for C.E.

Contributions and Controls for C.E. Tender Documents

23

Slide24

Geodetic Infrastructure & Activities

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

CSGeo

24

Slide25

Geodetic Reference Infrastructure for

C.E. Construction

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

25

Civil Engineering Works Start

C.E. Construction Invitation to Tender Start

Geodetic Infrastructure Ready

Injector Installation Start

FCC Installation Start

Y

8

Slide26

Geodetic Infrastructure Work Y3-Y7

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

26

Technical Design

Specifications

Prototypes

Development

Procurement

Site Location

Land Access

Measurement Campaigns

Instruments

Calibration

Reception

Controls

Analysis

Software Applications

Data Management

Market Surveys

Invitation to tender

Construction

Installation

Commissioning

Land

Equipment

Testing

Mathematical

Models

Hiring

Training

Slide27

Reference Point Co-ordinates for C.E. Construction

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Accelerator Information Required

Theoretical Design

FCC-

ee

Integration Model

Metrology & Alignment Precisions

To

be

developed

Geodetic Surface Reference Network

Mathematical Reference Systems and Transformation Algorithms

Gravity Field Model

Geodetic Transformation Software

Civil Engineering Works Start

C.E. Construction Invitation to Tender Start

Final Update of Position and

Orientation End

Injector Installation Start

FCC Installation Start

Y

8

27

Slide28

Reference Point Co-ordinates for C.E. Construction

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Accelerator Information Required

Theoretical Design

FCC-

ee

Integration Model

Metrology & Alignment Precisions

To

be

developed

Geodetic Surface Reference Network

Mathematical Reference

Systems and Transformation Algorithms

Gravity Field Model

Geodetic Transformation Software

Civil Engineering Works Start

C.E. Construction Invitation to Tender Start

Final Update of Position and

Orientation End

Injector Installation Start

FCC Installation Start

Y

8

Final Update of Position and

Orientation End

Establish Definitive Reference

Systems

End

Y

3

Procure

Geodetic Instruments Start

Geodetic Measurements Start

Y

5

Y

7

Y

8

Design Concept

28

Slide29

FCC Integrated Project Schedule

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Ambitious

timeline

Expert consultants needed

Numerous design concepts to develop …

and implement

Civil Engineering Works Start

C.E. Construction Invitation to Tender Start

Final Update of Position and

Orientation End

Establish Definitive Reference

Systems

End

Injector Installation Start

FCC Installation Start

Y

3

Procure

Geodetic Instruments Start

Geodetic Measurements Start

Y

5

Y

7

Y

8

Design Concept

Geodetic Infrastructure

29

Slide30

Other studies required too

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

FCC-

ee

MDIInjectors: Linac, Damping Ring, Pre-Booster, Transfer Lines

Marking out > 100 km tunnel in

Y13

Manually like the LHC?

Pre-aligning supports / positioning systems

Faster, automated methods?

Y14

30

Slide31

Conclusions

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Position Monitoring

and Alignment System

Need to start work on attributing the misalignment budget?Start studies for the technical design solutionResearch

and Development of potential solutions

16 years before tunnel installation starts

Significant time may be required prior to installing a beamline element

31

Slide32

Conclusions

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Geodetic Infrastructure

Geodesy akin to Geology

To do established before Civil Engineering starts

Geodetic infrastructure

To be in place before Y8

Design concepts to be established

Instruments to develop and test

Some budget available already

Ambitious

timelines for both

Geodesy

and

Alignment

!

32

Slide33

Thank you for

your

attention

Slide34

Conceptual Design Stage

Y1

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Gravity

Field

Study

Measurement Requirements as a function of Alignment

Precision

Pre-prototype

instrument

tested and evaluated

(

Differential Geodetic

Interferometric)

Deflectometer

Y2

34

Slide35

FCC-ee Geoid Model

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

Analysis

, Modelling (Y7)

(+ Database and Software Implementations)

Measurements (Y5 & Y6)

Astro geodetic measurements (2 years)

5 x Zenith

Cameras

Purchase 5 Zenith Cameras (Y3 & Y4)

Production time

~1.5 years

(+ Specifications, Procurement and Land Access)

35

Slide36

Integration

27.06.2019

M. Jones Geodetic Infrastructure and Alignment FCC Week 2019

36