Download Presentation The PPT/PDF document "LCDR Ron Terry, USN" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
LCDR Ron Terry, USN
Contracting Officer / FOO Program Manager, RCC KAF
Contracting Officer Representative (COR) TrainingSlide2
COR 1000-1100CID 1100-1130LUNCH 1130-1300
PAY AGENT 1300-1400FOO 1400-1430CERP 1430-1500Slide3
Prerequisite Requirements
Defense Acquisition University (DAU) CLC 106 – COR With a Mission FocusDefense Acquisition University
(DAU) CLC 206 – COR in the Contingency EnvironmentDefense Acquisition University (DAU) CLM 003 – Overview of Acquisition Ethics http://www.dau.mil/default.aspx
DOD
Combating Trafficking in Persons Course J3TA-US030 https://www.us.army.mil/ - ALMS
OGE Form 450(Confidential Financial Disclosure)
3Slide4
Performance Work Statement
(PWS)/Statement of Work (SOW):Performance-Based Language:
Tells the contractor what to do But not how
to do it
Seek assistance from functional and/or contracting staff Complete DA Form 3953 (funding/approval)/
from RMJustification document (operationally dependent)
Key points: (What you ask for, not what you want)
You set the requirements - contracting officers cannot read your mind
Do not assume anything - be specific and as thorough as possible
Use
the
LOGCAP Support Officer (LSO)
for requirements support--LOGCAP
4
PWS
DevelopmentSlide5
The COR’s key role is to optimize contracted services or construction
performance, based on Performance Work Statement (PWS) or Statement Of Work (SOW): - observe - document and
- communicate
Think counseling and evaluation!
What is a COR to the Commander?
5Slide6
COR MISSION As the Government representative appointed by the Contracting Officer, YOU are responsible for the
technical monitoring of the contractor’s performance, accepting or rejecting the contract services IAW the PWS/SOW,
and other contract administration duties IAW your COR appointment letter. The COR has the expertise in the area of contracted effort and possesses the necessary background to evaluate the contractor
in a fair, reasonable, and unbiased manner.
6Slide7
Official Appointment/Designation Letter Establishes
Lines of
Responsibility
Contracting Officer
(appointment letter)
COR
- Additional duty
Technical Expert
Command’s
single point of contact to the contractor
Functional Chief/Commander
(rating chain)
Dual Lines Of Responsibility
7Slide8
COR Authority
COR will often have:Command Authority through Chain of Command
This DOES NOT provide authority over the contractor to make changes on any contract(s).
Contract Authority only through the KO IAW the COR Appointment Letter
Limitations – based on PWS/SOW
8Slide9
Actual
Implied Apparent
“Authority is the power of the agent to affect the legal relationships of the principal by
acts done in accordance with the principal’s
manifestations of consent to him.” Restatement Agency, Section 5
Authority of Government Personnel
9Slide10
Actual Authority (contracting officer)
Written authority by warrantImplied Authority (contracting officer representative)“usual, customary, & necessary”
Apparent Authority -- Government does not recognize
Authority Types
10Slide11
Apparent Authority
“Authority that a third party reasonably believes an agent has, based on the third party’s dealing with the principal.”
Government is not bound by apparent authority
-
CSM directs grass be cut three times a week instead of two (per PWS) outside CGs office - BDE Commander directs contractor to have
porta- potties cleaned every day instead of every other day (per PWS).
Contractors will respond to apparent authority
11Slide12
12
Specific Duties
Monitor all performance aspects of the day-to-day administration of the contract
Monitor the contractor’s progress and performance, including the submission of required reports or other
documentation
Verify the contractor corrects all correctable deficiencies
Perform acceptance of supplies and services for the Government
Ensure surveillance checklists and surveillance plans are properly tied with the
PWS / SOWSlide13
13
Specific Duties
Maintain liaison and direct communications with both the contractor and the KO Recommend contract modifications and termination actions to the KO
Provide technical interpretation of the
requirements
Maintain a professional distance from the contractorSlide14
14
Specific Duties Represent the Government on technical issues
Report any instance of suspected conflict of interest or fraud, waste, and abuse
Conduct Fair and Firm Monthly Surveillance
Understand the Government’s Quality Assurance PlanSlide15
15
Reject non-conforming goods and/or services within a reasonable time Submit the DD Form 250, Material Acceptance and Receiving Report, for vendor
payment
KAFRCCINVOICES@afghan.swa.army.mil
Specific Duties
Include complete DD250, Invoice and EFT formSlide16
16
This form is a multipurpose report used: To provided evidence of Government contract quality assurance To provided evidence of acceptance
As contractor invoice and As commercial invoice supportThe Process:
The contractor prepares/forwards the
invoice to the COR who will prepare the DD250 using the contract.
COR verifies the contractor’s invoice w/ the DD250 and contract, signs the DD250, and forwards both documents to
the contracting officer
The Contracting Officer
will validate the document and forward to finance for payment
DD Form 250Slide17
17
Send invoices to: KAFRCCINVOICES@afghan.swa.army.mil
Subject: Invoice for W91B4L-XX-X-XXXX (contract #)
Submitting InvoicesSlide18
INVOICE PROCESS
COR Receives Invoice From Contractor COR Completes DD250COR sends documents to Invoice Team:Contractor Invoice & EFTDD250DFAS ( 30days)Bank Account (1-2 weeks)
Contractor Gets Paid (45 days later)Slide19
19
DD Form 250
Delivery location
Contracting office
Name and address of vendor
Finance office
Additional delivery information
if necessary (i.e. unit at a FOB)
Contract and order number
**
** This must match the information on the vendor’s invoice.Slide20
20
DD Form 250
This should match the information from the original contract.
Exception: block 17 should reflect the actual quantity received and/or accepted
if the shipment is incomplete or if not all items are accepted by the customer.
X the “Acceptance” block,date, and sign.Completing this block is
the customer’sverification that the items
meet the contract’sstandards.
Completing this block
verifies the customer
received the quantity of
items listed in block 17.
Note: More than one DD 250 will be required for a split supply shipment or continuing services.
SIGN TWICE!!!Slide21
21
Signature required
Invoice and DD 250 dollar amounts should match
Contract number should appear on invoice
Invoice number and date required
Item description should match contract
The InvoiceSlide22
Electronic Funds Transfer Form (EFT)
THIS FORM MUST BE TYPED USING SIZE FONT 14 !!! DO NOT HAND-WRITE !!! -- !!!
يجب ان تطبع في هذا النموذج !!! لا تكتب باليد
General Information
معلومات عامة
Contract Number
رقم العقد
Invoice Number
رقم قائمة الاجور
EFT Amount
المبلغ
This information must match the company's account on file at the bank
يجب ان تطابق المعلومات التالية لما هو موجود فس سجلات المصرف
Name Reflected on Bank Account
الاسم كما هو مسجل في حساب المصرف
Bank Account
Number
رقم حساب المصرف
Account Type
Checking account
نوع الحساب
Banking Information
معلومومات المصرف
Bank Name
اسم المصرف
SWIFT Code (All Vendors - 8 or 10 digits)
رمز السويفت (مطلوب لكافة المجهزين) (8 او 10 مراتب)
ACH Routing Number (US Vendors - 9 digits)
رقم الراوتنغ ( للمقاولين الامريكيين فقط) ( 9 مراتب)
IBAN
رقم الحساب المصرفي الدولي
Bank Branch Name
اسم الفرع للمصرف
Bank Address
عنوان المصرف
Bank City
اسم المدينة التي يقع فيها المصرف
Bank Account Name and Company Name must matchSlide23
This information must match the company's account on file at the bank
يجب ان تطابق المعلومات التالية لما هو موجود فس سجلات المصرف
Company Name
أسم الشركة
Company Representative
ممثل الشركة
Company Address
عنوان الشركة
Phone Number
رقم الهاتف
E-mail Address
mark.cull@arkel.com; gary.duff@arkel.com
عنوان البريد الالكتروني
Correspondent (Intermediary) bank information
معلومات المصرف المراسل (الوسيط)
Non-USA Vendors: This information must be filled out completely for payment to be made
يجب ان تطابق المعلومات التالية لما هو مسجل في المصرف لحساب الشركة
Intermediate Bank:
اسم المصرف الوسيط
SWIFT Code:
www.swift.com
رمز السويفت
Iraqi bank Account number with Correspondent Bank
رقم حساب المصرف العراقي لدى المصرف الوسيط
Signature Block
توقيع
Electronic Funds Transfer Form (Cont)
Company Name and Bank Account Name must matchSlide24
“You are hereby notified that
I DO NOT have the authority to direct you in any way to alter your contractual obligations. Further, if the Requiring Unit, as a result of the information obtained from today’s discussion desires to alter your contract requirement, then formal changes will be issued in writing and signed by the Contracting Officer (KO).”
COR’s “Magic Words” to the Contractor:
24Slide25
25
“What not to do”
Award, agree to, or sign any contract, delivery order or task order. All contractual agreements, commitments, or modifications shall be made only by the KO
Make any commitments or otherwise obligate the Government to make any changes to the contract
Grant deviations from or waive any terms and conditions of the contract
Authorize the use of overtime
Permit DFAC, PX, Hospital, MWR accessSlide26
26
“What not to do”
Impose or place a demand upon the contractor to perform any task or permit any substitution not specifically provided for in the contract Approve travel and relocation expenses over and above that provided for in the contract
Increase the dollar limit of the contract, or authorize work beyond the dollar limit of the contract, or authorize the expenditure of funds
Give direction to the contractor or to the employees of the contractor except as provided for in the contract Slide27
27
“What not to do”
Change the period of performance Authorize the purchase of equipment, except as authorized under the contract
Authorize the furnishing of Government property, except as required under the contract
Authorize subcontracting or the use of consultants
Approve shifts of funding between line items of the budget Slide28
Unauthorized Commitment
FAR 1.602-3 – an agreement that is not binding solely because the Government representative who made it
lacked the authority to enter into that agreement on behalf of the Government.
Ratification
– the act of approving an unauthorized commitment by an official who has the authority to do so…the KO.
COR
(YOU) may be held personally fiscally liable for the dollar value of the unauthorized commitment that they make
28Slide29
Unauthorized Commitments
What Can I Do To Avoid Committing A Unauthorized Commitment
?
Do NOT let the Chain of Command pressure you to commit the Government
Don’t let vendors pressure you through sales tactics and product trialsWhen conducting market research, be certain you make no commitments
Plan ahead for the supplies and services you need
Contact your servicing contracting office for advice on contracting matters
Contact them immediately if you believe you may be involved in a UC
Think before you “buy”
29Slide30
Ethics and the COR
It is always better to ask permission than forgivenessCall KO
No one on the ground, other than the KO, can “authorize” anything
relating to a contract
(This is Not
going to happen)
What?!!!
Sir, you must talk to the KO.
30Slide31
Do not accept any of the following items from a contractor that you are appointed to oversee:
Gifts Money Job Offers “Favors” If you are offered any of the above from a contractor you must report it to the KO immediately.
31
Ethics and the CORSlide32
….the U.S. Army assigns a contracting officer representative (COR
) to review all transportation requests and transportation providers. The Army assigned SSG Clifton, to be the COR at the Bagram Airfield in February 2008. Clifton’s duties included overseeing the companies providing ground transportation to and from the Airfield and objectively determining whether the companies’ service had been adequate.
Despite initially refusing the gifts, Clifton admitted he accepted a cell phone in May 2008, paid for by AIT. According to court documents,
AIT then began to make payments to Clifton at a rate of $20,000 a month. In exchange for the payments, Clifton admitted he agreed to assign one extra day of trucking service to the company
. Clifton also admitted that later in the month, another Afghan trucking company, ATT, entered into a similar illegal agreement with him. In exchange for bribe payments of $15,000 a month, Clifton admitted he assigned ATT an additional day of trucking service a month. Between May and October 2008, Clifton admitted ATT and AIT made $87,000 in payments to him.
32
Ethics and the CORSlide33
Document unit requirements
Assist in preparing the procurement package to include PWS/SOW and Independent Government Estimate (IGE) to include Market Research Prepare, staff, and submit Purchase Requests (PR&C)
Verify availability of Funding – Submit packet to request funds Assist the KO in the Technical Evaluation of proposals from contractors
COR Pre-Award
Responsibilities
Will vary with the size and type of contract – In General:
33Slide34
Joint Acquisition Review Board (JARB)
Step 1: Follow JARB ChecklistStep 2: Develop Letter of JustificationStep 3: Get Three Quotes – Make SummaryStep 4: Conduct Lease vs. Buy Analysis (For NTV, ATV, MHE)Step 5: For Services
Develop Statement of WorkDevelop Quality Assurance PlanStep 6: Legal ReviewStep 7: Required COR TrainingStep 8: PR&C (DA Form 3953 Word or PureEdge)
http://jsc-a.rsouth.afghan.centcom.mil
“acquisitions”Slide35
Joint Acquisition Review Board (JARB)
USFOR-A - TuesdaysCW2 Ralph BrownRC-South/82nd AB – WednesdaysMr. Nathan S. TaylorSlide36
Performance Work Statement
(PWS)/Statement of Work (SOW):Performance-Based Language:
Tells the contractor what to do But not how
to do it
Seek assistance from functional and/or contracting staff Complete DA Form 3953 (funding/approval)/
from RMJustification document (operationally dependent)
Key points: (What you ask for, not what you want)
You set the requirements - contracting officers cannot read your mind
Do not assume anything - be specific and as thorough as possible
Use
the
LOGCAP Support Officer (LSO)
for requirements support--LOGCAP
36
PWS
DevelopmentSlide37
A
Statement of what you want the Outcome to be…not how to do it Outcome words include
maintain, provide acceptable, keep in clean condition,
proper outcome
, etc.Example: “
The Contractor shall, in designated areas, keep the grass maintained to an overall uniformity of two to three inches high without any
skips or resulting debris.”
A
Measurement method that states how performance will be measured Measurement words include;
Inspect
;
Observe
;
Count
;
Test
; etc.,
Example: “The appropriate Government representative will
inspect
the designated areas for contract performance.
Acceptance of work completed will be measured consistent with
the Acceptable Quality Level (AQL) below:”
37
PWS
DevelopmentSlide38
This is what you need:
You say, “Yellow custom car”
You get this:Contractor met requirements- Are you happy?
Basic IllustrationSlide39
RCC cancels the solicitation,
cost the government time and money, and re-solicit:You say, “Yellow custom car w/4 wheels/more than 1 seat”
You get this:Contractor met requirements again- Still not happy?Slide40
PWS Writing in 10 Easy Steps!
Identify the service object you want the contractor to changeState what you want the contractor to do to the object
Analyze each service object to identify the object parts that require separate treatment (NO VERBS)…work breakdown analysisDevelop performance standardsWrite and organize the list of service tasks
Write the performance requirements summary
Write the other sections of the work statement (Scope, References, Deliverables)Prepare a table of contents, if PWS is more than 10 pages
Prepare a document cover if
PWS is an attachment to contract
Publish the PWS
40Slide41
KAF RCCFirst in, first out
Senior Contracting Official Afghanistan (SCO-A) determines priorities, not us!30 days to award contractContractor gets time for mobilization Slide42
How to read a Contract
42
1. Original PR number
2. Contract number
3. Award date4. Order number9. Contracting office
15. Delivery address17. Vendor/contractor
18. Finance/pay office
1
2
3
4
9
15
17
18Slide43
How to read a Contract
19-24: Description of supplies/services purchased.
This information may be listed on or immediately following page 2.
26: Total award amount
31: Contracting officer’s signature
30: Vendor’s signatureSlide44
How to read a Contract
44
Complete description of each item: This is the basis for the COR’s inspection and acceptance of the supplies and/or services.
NLT delivery date and addressSlide45
COR Post-Award Responsibilities
Will vary with the size and type of contract – In General:
Monitor and document contractor’s performance in accordance with the requirements, terms and conditions of the contract and agreed schedule. Maintain Contract Information Security
Inspect supplies and services to determine acceptability – Reject those that do not meet the contract requirements and standards.
Report results to the Contracting Officer at least monthly. Validate contractor’s reimbursable purchases are actually received before being billed to the Government(Contractor Invoice).
Maintain COR files
45Slide46
Results of Poor Quality Control …
Loss of Effectiveness
and a Waste of US Tax Payers Dollars…
Soldier electrocuted
while taking a shower in
a contractor maintained
military
facility.
The PWS called for 2 inch gravel
…or Worse, Loss of Life.
46Slide47
Administrative info (Contract Number, etc)
Documenting contractor's performanceWorking File: COR nomination and appointment COR training documents
Copy of the contract and modifications Notice of award and to proceed Minutes of post-award meeting List of POCs for gov’t
and contractor List of applicable regulations
Quality Assurance Surveillance Plan(QASP) Security requirements/clearances/passes Correspondence on contract
Surveillance documentation Invoices/receipts GFP documents
COR
Work Plan
47Slide48
COR Official Files
The
COR file is a part of the official contract file
and must be maintained in accordance with the contracting officer’s instructions.
COR is Responsible to :
Maintain complete and
orderly files
Safeguard all
procurement sensitive,
business sensitive, and
proprietary information.
FAR Subpart 4.8 -- Government Contract Files
48Slide49
Do Not Promise or authorize more work
Do Not Get involved with subcontractorsDo Not Modify the contractDo Not Disclose source selection information
Do Not Divulge budget informationDo Not Grant deviations or waivers of contract terms and conditions
Do Not Pass on duties to anyone else (no delegations)
Do Not accept gifts, cash, job offers, or “favors” from the contractor
COR
Things to Remember
49Slide50
50
The COR is responsible for determining whether products delivered or services rendered by the contractor conform to the technical requirements of the contract. In discharging this responsibility, the COR should keep in mind that once a contractor’s work has been formally accepted, the contractor is excused from further performance or correction of work that has already been accepted should it prove to be unsatisfactory (except for latent defects). Acceptance defined: The act of an authorized representative of the Government (you, the COR), which constitutes acknowledgement that the supplies or services conform to the applicable contract quality/quantity requirements.
Inspection and Acceptance / RejectionSlide51
CORs are the requiring unit’s voice of satisfaction or dissatisfaction concerning contractor performance… they are where the “rubber meets the road” on how the command’s contracting budget is spent
CORs manage their assigned contract, not the contractor CORs can be held personally fiscally liable for Unauthorized Commitments
51COR Things to RememberSlide52
Read and know the contract
Have or develop technical expertise Manage relationships
Monitor and document performanceMonitor Government Property
Inspect and accept deliverables
Recommend changes or remediesReview/approve reports and invoices
Report at least monthly to the KOContinue COR duties until Terminated in writing by the KO
52
COR
Things to RememberSlide53
Contract Information is always sensitive data
Do not share contract data with anyone except the CO, KO, Quality Assurance Personnel, and the prime contractor (listed on the contract) employees Insurgent forces target contractors who do business with the U. S. Government and Coalition Allies.
Disclosure of contractor company names identifies these firms as doing business with the U. S. Government and can place the lives of the companies’ employees and their families at risk.
COR
Contract Info Security
53Slide54
Questions?
54Slide55
KAF/RCC COR POC Information
1Lt Jennifer Hutchison
Jennifer.hutchison@afghan.swa.army.mil
Desk: 318-421-7159
55Slide56
Federal Acquisition Regulation (FAR)
Defense FAR Supplement
Money as a Weapons System
ReferencesSlide57
QUESTIONS?