/
Mike MolinaMike PankoGabe PoslusznyDarren Reger Mike MolinaMike PankoGabe PoslusznyDarren Reger

Mike MolinaMike PankoGabe PoslusznyDarren Reger - PDF document

natalia-silvester
natalia-silvester . @natalia-silvester
Follow
370 views
Uploaded On 2016-05-20

Mike MolinaMike PankoGabe PoslusznyDarren Reger - PPT Presentation

Crosses the channel at the straight of Dover the narrowest point of the channelGoes from Folkestone UK to Coquelles France314 mile train tunnel carrying people vehicles and freight via 2 single tr ID: 327567

Crosses the channel the

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Mike MolinaMike PankoGabe PoslusznyDarre..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Mike MolinaMike PankoGabe PoslusznyDarren Reger Crosses the channel at the straight of Dover, the narrowest point of the channelGoes from Folkestone, UK to Coquelles, France31.4 mile train tunnel carrying people vehicles and freight via 2 single track electric rail sets23.5 miles of the tunnel is under water making it the longest submerged tunnel in the world At the lowest depth the tunnel is 250 feet below sea level Travel time underwater is about 20 minutesMuch faster and easier than ferry to cross the channelConstruction took from 1988 to 1994 and the tunnel was opened for passenger service on November 4, 1994. At the time it was the largest project ever conceived at about 21 billion US dollars.Owned by Eurotunnel and operated by Eurotunnel, Eurostar, DB SchenkerRail and SNCF In 2008 16.1 million tickets were sold for travel across the chunnelthrough Eurotunnel and Eurostar Built in the chalk marl layerChalk marl is chalk that has formed in shallower seas closer to land where clay washout from rivers and streams sunk to the bottom and deposited in the forming rockOver time the land eroded back and the marl formation works away from land and strictly white chalk forms Chalk Marl is almost always found below the white or grey chalk as it forms first http://upload.wikimedia.org/wikipedia/commons/thumb/5/59/Channel_Tunnel_geological_profile_1.svg/800pxChannel_Tunnel_geological_profile_1.svg.png Due to the fine clay content in the marl it is virtually impervious to water Clay content makes it softer than the higher levels making it easier and faster to tunnel, as it is easier on the cutting machinery. http://www.whitecliffscountryside.org.uk/site_img/articles/82.jpg Local chalk deposits White chalk cliffs at over (more clay content at lower levels) http://upload.wikimedia.org/wikipedia/commons/7/7e/White_cliffs_of_dover_09_2004.jpg Convincing People such a long tunnel was safe. To do this there was an escape tunnel construction in addition to the 2 rail traffic tunnels.Station on the English side has to be made on Castle Hill Landslide and in order to overcome this they buttressed the station with drainage aditswhich are gravity powered pathways for water to escape.Needed a piston relief duct connecting the tunnels to regulate the pressure for moving trains.Trains got too hot so they needed to run cool water through pipes to keep the air at appropriate temperatures. The spoil from the construction of the chunnelwas placed in Samphirehoe.This area was then opened to the public as a park. samphire.ukfossils.co.uk http://www.pbs.org/wgbh/buildingbig/wonder/structure/channel.html http://www.whitecliffscountryside.org.uk/index3.php?id_img=81&id_sec=2&id_sub=2