P10505 – Cold Pressure Fusing II P10505 – Cold Pressure Fusing II

P10505 – Cold Pressure Fusing II - PowerPoint Presentation

natalia-silvester
natalia-silvester . @natalia-silvester
Follow
393 views
Uploaded On 2017-04-26

P10505 – Cold Pressure Fusing II - PPT Presentation

Final Design Review Team Fusion 2222010 Project Team Faculty amp Customer Project Members Aniket Arora Project Manager ISE David Hatch Lead Engineer ME Jon Burville ME ID: 541749

days thou mcmaster carr thou days carr mcmaster grainger1 spring total fusing xerox lee load project springs lhl rollers customer thou1 part

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "P10505 – Cold Pressure Fusing II" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

P10505 – Cold Pressure Fusing IIFinal Design ReviewTeam Fusion2/22/2010Slide2

Project Team, Faculty, & CustomerProject MembersAniket Arora – Project Manager – ISE

David Hatch – Lead Engineer – ME

Jon Burville – ME

Eric Wilcox – ME

Thomas Stojanov – EE

Customer

Mr. John Knapp - Xerox

Mr. Tony Condello - Xerox

Faculty Guide

Mr. Bill Nowak - XeroxSlide3

Customer NeedsSlide4

Customer NeedsSlide5

Engineering SpecificationsSlide6
Updated DAQ and Electrical Schematics

Slide7

Slide8

Slide9

Slide10

Compliance DOE calls for two levels of compliance to test effect on fusing•  Springs must be capable of transmitting 150 lbs of force with additional FOSSelection Criteria: Must reach 200 lbs of load. Spring constants must be significantly different.

Deflection to max load must be large to allow fine tuning. Free length must not exceed 1.5 in. Deflection cannot exceed 0.75 in.

This uses existing hardware

Supplier

Part Number

Maximum Load (lbs)

Deflection

at Maximum Load (in)

Spring Constant

(lb/in)

Cost per Unit

Lee

Spring

LHL 1000B 02

259

0.47

560

$4.54

Lee

Spring

LHL 1250A 01

202.5

0.75

270

$5.37

Total

$39.64Slide11
Final DesignSlide12
End Block RedesignSlide13
End Plate Section ViewSlide14
Methods of Measuring Skew

ME machine shop can measure skew easily using a dial indicatorCMM is available as wellLow tech option of a large caliper for quick measurementSlide15

Update on DeformationMain RollerDeflection

90°180

°

270

°

< 0.5 thou

< 0.5 thou

< 0.5 thou

<0.5 thou

Runout

5/8”

4 1/8”

8 1/8”

11 3/8”

< 0.5 thou

< 0.5 thou

< 0.25 thou

0.5 thou

Fusing Roller – 0.5

° Skew

Deflection

0

°

90

°

180

°

270

°

< 0.5 thou

< 0.5 thou

< 2 thou

< 1 thou

Runout

3/8”

3 3/4 ”

8”

11 1/2”

2 thou

1.5 thou

1.5 thou3 thou

Fusing Roller – 0° SkewDeflection0°90°180°270°< 0.5 thou< 0.25 thou1 thou< 1 thouRunout5/8”4 1/8”8 1/8”11 3/8”< 2.5 thou1.5 thou< 1.5 thou< 1 thou

ME machine shop can grind and polish rollers to tolerance. The diameter of the roller would be altered.

The other option would be to remanufacture the fusing rollers. Slide16
Slide17
Mechanical BOM

Forms to purchase mechanical parts will be submitted todayBill of Materials

Part

Part Number

Supplier

Qty.

Base Price

Total Price

Lead Time

Self-Alignment Bearings

129TN9

BDI USA, Simplybearings.co.uk

6

$25.55

$153.30

3-5

Days

Metal Stock (Rollers)

6628K461

McMaster-Carr

1

$47.59

$47.59

1-2 Days

Metal Stock (Skew Rollers)

6628K383

McMaster-Carr

2

$25.79

$51.58

1-2 Days

Metal Stock (Endplates)

8910K704

McMaster-Carr

1

$39.52

$39.52

1-2 Days

Compression Springs

9657K14

McMaster-Carr

4

$12.93

$12.93

1-2 Days

Shell Cup Needle Bearings

BA-88Z

Bearings Direct

6

$4.98

$29.88

1-3 Days

Pan Head Screws

91772A190

McMaster-Carr

16

$5.61

$5.61

1-2 Days

Retaining Rings

98408A138

McMaster-Carr

4

$6.12

$6.12

1-2 Days

Retaining Rings

98543A115

McMaster-Carr

4

$6.95

$6.95

1-2 Days

Dowel Pins

98381A546

McMaster-Carr

4

$10.71

$10.71

1-2 Days

Hex Head Cap Screws

91257A555

McMaster-Carr

4

$9.96

$9.96

1-2 Days

Springs

LHL 1250A 01

Lee Spring

4

$5.37

$21.48

5-6 Days

Springs

LHL 1000B 02

Lee Spring

4

$4.54

$18.16

5-6 Days

1 1/4" OD x 1/4" ID washers

91090A109

McMaster-Carr

100

$5.52

$5.52

1-2 Days

 

Mechanical Total:

$ 413.79 Slide18

Electrical BOMBill of Materials

Part

Part Number

Supplier

Qty.

Base Price

Total Price

Lead Time

Load Cell Amplifiers

DPM- 3

*Provided By Xerox

5

$ 395.00

$ 1,975.00

NA

Multifunction DAQ

PCI 6014

*Provided By Xerox

1

$

699.00

$ 699.00

NA

DAQ I/O Block

SCB-68

*Provided By Xerox

1

$

299.00

$ 299.00

NA

PCI Interface Cable

-

*Provided By Xerox

1

$

119.00

$ 119.00

NA

Wire

NA

*Provided By Student

1

$ -

$ -

NAWireNA*Provided By Student1 $ - $ - NAPlastic Enclosure613593TheGreatHardwareStore.com2 $ 16.78 $ 33.56 5-7 DaysSolid State Relay6C900 W.W. Grainger1 $ 20.60 $ 20.60 1-2 DaysTransformer6WU91W.W. Grainger1 $ 16.73 $ 16.73 1-2 DaysCrimp Connector Assortment4FRE3 W.W. Grainger1 $ 14.69 $ 14.69 1-2 DaysC14 Power Extension CordB0017UB5UGAmazon.com2 $ 2.50 $ 5.00 5-7 DaysMechanical Relay2UTT6W.W. Grainger1 $ 11.58 $ 11.58 1-2 DaysMisc. HardwareNALocal Hardware1 $ 10.00 $ 10.00 NAC13 Panel Mount AdaptorCCM1404-NDDigi-Key2 $ 2.52 $ 5.04 5-7 DaysDouble- Sided Tape1F239W.W. Grainger1 $ 8.53 $ 8.53 1-2 DaysC14 Panel Mount Plug Adaptor3792CCM1401-NDDigi-Key2 $ 2.06 $ 4.12 5-7 DaysCable Connector3LK50W.W. Grainger2 $ 2.13 $ 4.26 1-2 DaysWire Nuts6LU36W.W. Grainger1 $ 2.70 $ 2.70 1-2 DaysCable Ties6JU12W.W. Grainger1 $ 2.13 $ 2.13 1-2 Days    DAQ Total: $ 3,230.94   Grand Total $ 3,644.73   Gifted Items $ 3,092.00   Actual total $ 552.73  

Electrical parts- waiting on trip to XeroxSlide19
MSD II Project PlanSlide20
Worst Case PlanSlide21
GREEN LIGHT FOR MSD 2!!